Decision Notice - Change to an Existing Approval - 010.2006.00000159.002 [As Published] · 142006.159.02

of 10

Text shows just the words. Original shows the document exactly as it was published.

                                                                                           2006/159

      If any Council property or facilities should be damaged by the applicant or any of its consultants or
      contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
      engineering works, the applicant and/or its contractors shall forthwith notify the Assessment
      Manager and shall forthwith rectify the damage to that property or facility at its cost to the
      satisfaction of the Assessment Manager prior to the sealing of the survey plan and/or acceptance
      of the works on-maintenance. Alternatively, the applicant may request the Council to carry out
      the rectification work at the applicant's cost, such cost being paid by the applicant to the Council
      prior to the sealing of the survey plan and/or acceptance of the works 'on maintenance' provided
      that in the case of emergency, the Council shall be entitled to rectify such damage at the cost of
      the applicant such cost being paid prior to the sealing of the survey plan and/or acceptance of the
      work 'on maintenance'.
42.   The Contractor shall make all necessary arrangements for supply of water required for
      construction works. The use of hydrant standpipes on Council mains will NOT be permitted.
      Contractors should contact Council’s Water Section on phone 5449 5254 to obtain an
      application form for issue of a key to access Council’s water tanker filling stations. Conditions
      of access and location of filling stations are detailed on the application form.
43.   All sewerage reticulation mains are to be inspected by closed circuit television (CCTV) prior to
      acceptance 'on maintenance'.
      CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
      following satisfactory completion of construction works. The developer will be responsible for
      the full cost of CCTV inspection, including any additional inspection necessary following defect
      identification and rectification. This charge is payable prior to commencement of works and
      will be determined on the unit rate basis current at the time of approval.
44.   All signage, including that for safety during construction shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Main Roads Department Roadworks Signing
      Guide.
45.   As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone
      56 coordinate value to the standards and requirements of the Assessment Manager are required
      for Council records. Such 'as constructed' drawings will be required prior to works being accepted
      "on maintenance", where applicable. Requirements for "as constructed" information are detailed
      in the current version of Council's Engineering Design Standards (Water & Sewerage) Manual.
      Release of plans of survey and/or acceptance of the works on-maintenance will not be
      considered until lodgement of satisfactory 'as constructed' records.
      Please note that bonding of outstanding works will not be considered by Council.
46.   Your company, is responsible for arranging all inspections and ensuring that all relevant
      details required by Council are supplied. The attached Water and Sewerage Inspection
      Report form is to be kept by you and presented to Council's Inspector at each stage of the
      development requiring a meeting or inspection. The Inspector will sign the form at each stage
      when conditions have been satisfied. The works will be accepted 'on maintenance' when this
      form, signed by the Inspector for each stage, is returned with a letter requesting that it go 'on
      maintenance'.
47.   It is Council policy that a maintenance bond be imposed on construction works during the
      maintenance period. The maintenance bond shall be 5% of the agreed value of the
      development obligations, or $1,500 whichever is the greater amount. This bond must be
      lodged by (and shall only be accepted from) the Developer for the works.
48.   Construction work and other associated activities are permitted only during the hours of
      7:00am and 6:00pm Monday to Saturday. No work is permitted on Sundays or public
      holidays, except where extended hours are approved by the Assessment Manager or his
      nominee.

                                                                                        Page 6 of 10

Used in these records

About this file

File size
69 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2006.00000159.002 [As Published].pdf · 69 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.