UPDATED DA - Attachment 3 - Proposal Plans

of 22

Plans and drawings: the text below has words only, no drawings.

Very large file (13.9 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                             18780.87 mm
                                                                                                                     25m                                 66.5m




                                                                                                                                                  31m
                                                                                                                               6m




                                                                                                         10m




                                                                                                                                                        14.5m
                                                                                                                                                                                                                       remove all building structures in area
                                                                                                                                                                                                                       shown red dashed
                                                                                                                                                                                                                       relocate all building structures in area
                                                                                                                                                                                                                       shown blue dashed




                                                                                                         40m
                                                                                                                                                                                                                       remove all hard paving, bitumen and
                                                                                                                                                                                                                       substrate in area shown yellow dashed
                                                                                                                       31m                                                                                             remove all vegetation in area shown
                                                                                                                                                                                                                       purple dashed.
                                                                                                                                                                                                                       Total area - 2600m2

                                                                                                                                                                                                                       proposed future process building


                                                                                                          existing
                                                        RVM
                                                                                                          Energex poles                                            truck
                                                        station                                                                                                                                                        relocate switchboard and data
                                                                                                          and power lines                                          wash
existing workshop and
process buildings.                                                                                                                                                                                                     Existing infrastructure
proposed future                                                                                                                            lunch rm
process building                                                                                                                           bldg                                                                        Electrical switchboard and data - Site




                                                                                                                                                                                            18m
                                                                                                                                                                                                                       Sewerage Treatment




                                                                                                                                                                           4m
                                                                                                                                                                                                                       Stormwater runoff

                                                                                                                                                      45m                       17m




                                                                                                                             0             10             30                                      80

                                                                                                                                                                                                                             Infrastructure and
           FLEXURE Pty Ltd                                        CLIENT                                                                                         USE FIGURED DIMENSIONS.    ISSUE AMMENDMENT   Title
                                                                            NOOSA COUNCIL                                                                        DO NOT SCALE FROM THE      date     details                 demolition
                                                                                                                                                                 DRAWINGS. CONFIRM ALL                         Date
           GRANT CALDER ARCHITECTURE AND URBAN DESIGN                                                                                                            DIMENSIONS ON SITE PRIOR                                    14 February 2025
                                                                                                                                                                 TO CONSTRUCTION OR
                                                                                                                                                                 FABRICATION. IT REMAINS                       Scale         1:1000@ A3
                                                                  PROJECT   RECYLE/TRANSFER STATION CENTRE                                                       THE CONTRACTORS
                                                                                                                                                                 RESPONSIBILITY TO ENSURE                      Drawn         Grant Calder
           21 Bursaria Street Peregian Beach                                SP298776 561 Noosa Eumundi Road                                                      COMPLIANCE WITH ALL
           ph: 0488 084 184
           email - [email protected]                                     PLANNING APPLICATION                                                                 RELEVANT CODES AND
                                                                                                                                                                 REGULATIONS IS                                Checked       Grant Calder
           Registered Architect- BOAQ 3112                                                                                                                       MAINTAINED AT ALL TIMES.
                                                                                                                                                                                                               Drawing No    GC 147 MPAC 4                Issue - 0
Log in to download the original file

UPDATED DA - Attachment 3 - Proposal Plans.pdf · 13.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.