Council archive · source document
Development Application part 2 of 2 Town Planning Report and Plans - MCU13/0081
Plans and drawings: the text below has words only, no drawings.
Very large file (31.8 MB): may take a few minutes to open.
~tfoEYR~O~
ARCHITECTURE I TOWN PLANNING I INTERIOR DESIGN
I~I.
’I"’AAJ1ENs~ltl
SPP 3/11- Coastal Protection
State Planning Policy 3/11 protects the coastal resources of the coastline zone by setting out criteria for
land-use planning, coastal activities and development assessment, enabling Queensland to manage
development within the coastal zone, including coastal waters. The Subject Site is not located within the
coastal protection zone.
Temporary State Planning Policy 2/11- Planning for Stronger, More Resilient Floodplains
Temporary State Planning Policy 2/11 seeks to plan for stronger, more resilient floodplains and has been
developed to support Councils who wish to adopt the floodplain maps and the code provisions into existing
planning schemes. The Subject Site is not mapped as being susceptible to flooding.
SPP 3/10 -
Acceleration of Compliance Assessment
State Planning Policy 3/10 is relevant to assessing requests for compliance assessment for reconfiguring a lot
applications that are subject to compliance assessment under Schedule 18 of the Sustainable Planning
Regulation 2009 (’the Regulation’). The proposed development of the Subject Site does not meet the
compliance outcomes as prescribed by the Regulation and accordingly is not subject to this type of
assessment.
SPP 2/10 -
South East Queensland Koala Conservation
State Planning Policy 2/10 seeks to maintain the viability of all major koala populations across the region by
increasing the size of their habitat. The Subject Site is not mapped within the Nature Conservation (Koala)
Conservation Plan 2006 (the Koala Plan).
SPP 2/07 -
Protection of Extractive Resources and Guideline
State Planning Policy 2/07 identifies those extractive resources of State or regional significance where
extractive industry development is appropriate in principle, and aims to protect those resources from
developments that might prevent or severely constrain current or future extraction when the need for the
resource arises. Extractive resources include sand, gravel, quarry rock, clay and soil and are used in concrete,
asphalt, road bases and a range of other products. The Subject Site is not located within a Key Resource
Area, resource/processing area or separation area.
SPP 1/07 -
Housing and Residential Development
State Planning Policy 1/07 applies to local governments with a population of 10,000 or more and a minimum
average dwelling approval rate of 100 dwellings per annum over the latest five year period. SPP 1/07 seeks
to ensure these local governments identify the housing needs of their community and analyse, and modify if
necessary, their planning scheme to remove barriers to and provide opportunities for a range of housing
options that respond to the housing needs of the community. This policy is not relevant to the development
assessment process.
SPP 1/03 -
Mitigating the Adverse Impacts of Flood, Bushfire and Landslide
State Planning Policy 1/03 sets out the State Government’s interest in ensuring that the natural hazards of
flood, bushfire, and landslide are adequately considered when making decisions about development. The
Subject Site is not encumbered by flood, bushfire or landslide constraints.
MCU Town Planning Assessment Report Page 13
75 Hastings Street, Noosa Heads: May 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 Town Planning Report and Plans - MCU13/0081Related documentApplication case desk ↗
About this file
- File size
- 31.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.