SUPERSEDED COMPILED Decision Notice [As Published] · 132003.220729.3
Form 6 – Compiled Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 23218 DA Date of Decision: 13 December 2007
1. APPLICANT DETAILS
Name: Stephen Timothy Biggs
Postal address: CARE Ken Hicks & Associates
PO Box 6380
MAROOCHYDORE BC QLD 4558
Phone no: 5443 2844 Fax no: 5443 7146
2. PROPERTY DESCRIPTION
Street address: 14 PARK ROAD
Suburb/locality NOOSA HEADS QLD 4567
Real property LOT 3 ON RP 122368 & LOT 65 ON RP 52918, PARISH WEYBA, COUNTY MARCH
description:
3. OWNER DETAILS
Name: Stephen Timothy Biggs
Postal address: 875 Ann Street, Brisbane Qld Postcode: 4000
4. REFERRAL AGENCIES
Referral Agency Address Basis
Nil
5. APPLICATION TYPE
Development Development Details Preliminary Development
Approval Permit
Material Change of Use Dwelling in a Non Urban Zone NO YES
Lot Reconfiguration Reconfigure a Lot NO YES
6. DECISION DETAILS
Council on 2 September 2004 decided to approve the application and:-
A. Grant a Development Permit for Material Change of Use for a dwelling house, subject to conditions.
B. Grant a Development Permit to Reconfigure a Lot, subject to conditions.
In relation to a request to change the Development Approval, Council on 29 March 2007 decided to:
A. Approve the change with amendment to Conditions 1, 7, 23, 24, 27 and 43.
B. Include one additional condition.
C. Issue a Compiled Decision Notice.
In relation to a request to change the Development Approval, Council on 13 December 2007 decided to:
A. Approve the change with amendment to Conditions 1, 3, 4, 18, 27, 30 & 43.1
B. Refuse to change conditions 21, 29 and 35 because of possible impacts on Council infrastructure.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 9 pages
Page 2
NOOSA COUNCIL IDAS Development Application Decision Notice 2
C. Amend the Further Development Permits Required section of the Development Permit to only require
operational works for the stormwater.
D. Issue a Compiled Decision Notice.
7. APPLICABLE CODES
The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Not applicable.
8. SUBMISSIONS
5 properly made submissions were received.
9. CONDITIONS
The approval is subject to conditions. Noosa Council’s conditions are attached.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Building Building Works
Operational Works Stormwater
11. RIGHTS OF APPEAL
Rights of appeal in relation to this application are attached.
12. ASSESSMENT MANAGER
Name: Noosa Council Signature: Date: 14/12/07
DECISION NOTICE HISTORY
Original Decision Notice 2 September 2004.
Minor Change to the approval with amendment to
Conditions 1, 7, 23, 24, 27 and 43 and one
additional condition on 29 March 2007.
Minor change to the approval with amendment to
Conditions 1, 3, 4, 18, 27, 30 & 43.1 Refuse to
change conditions 21, 29 and 35 on 13 December
2007.
SEP o:\database\onestop\decision.doc
Page 3
NOOSA COUNCIL IDAS Development Application Decision Notice 3
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
MATERIAL CHANGE OF USE CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are numbered A01a, A02, A03 & A06 to A13 prepared by Morq and
dated 17 September 2007 and as may be amended by these conditions.
2. The use and all activity on the site, including construction and excavation, is to be carefully controlled and
interference with vegetation kept to an absolute minimum to ensure that the proposed use does not
undermine or compromise the Noosa Hill Development Control Plan and the Strategic Plan objective of
preserving the natural character and appearance of Noosa Hill. The approval is to be implemented with
this objective as the overriding factor.
3. All roofing of the structures on site are to be of a non-reflective nature and coloured with muted earth
tones. All structures are to use colours that integrate with the natural environment and be of muted earth
tones of browns, greens, ochres, greys etc.
4. The glass provided along the western elevation of the dwelling house is to be non reflective.
5. The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.
6. The open space and setback areas are to be landscaped in accordance with Council’s Policy on
Landscaping Guidelines and a properly prepared landscape plan is to be prepared and submitted for
approval. The landscaping is to be completed prior to the premises being occupied and maintained at all
times thereafter. The landscape plan is to clearly indicate:-
6.1. the retention of vegetation in accordance with Drawing No. GG655 LA 01 Sheet 1 Issue Q dated
March 2003 drawn by LandGraphics (including Box trees 21, 22 & 28) and reinforcement planting
of endemic species on the site;
6.2. the retention of all existing vegetation on the site outside of the approved building footprint; and
6.3. the proposed means of protecting trees to be retained, particularly during the construction process.
7. All works shall be carried out in accordance with the recommendations of the Tree Report dated 7 July
2004 and the Arborist Report dated 19 January 2007 prepared by Leaf & Limb Horticultural Consultancy,
with tree 24 to be replaced by 2 x 45 litre native trees.
8. No fencing is permitted to be erected across the Park Road frontage of the site.
9. No pathway/accessway is permitted through the site to Park Road.
10. All external lighting is to be hooded and angled away from neighbouring properties and main beach.
11. Security in the form of a cash bond or trading bank guarantee to the sum of $100,000 must be submitted,
to secure performance of all conditions of this approval, prior to the issue of a Development Permit for
operational works. The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing performance of this
permit.
SEP o:\database\onestop\decision.doc
Page 4
NOOSA COUNCIL IDAS Development Application Decision Notice 4
12. The requirements of this development approval are to be satisfied, prior to the commencement of the use
of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this
approval to effect compliance with conditions.
13. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
obtaining a Development Permit for building works.
14. This Development Permit for a material change of use of premises lapses if:-
14.1. the use or erection of a building or other structure associated with the use, has not been
commenced by 2 September 2008, unless application is made and approved by Council for an
extension; or
14.2. the use of any premises pursuant to the Development Permit ceases.
Land Development
15. A vehicular access driveway to serve the site shall be constructed from the Allambi Rise frontage of the
site with a maximum width of 3.0 metres.
The driveway shall be designed and constructed to Council’s design standards and to grades that prevent
vehicles from scraping and/or bottoming. Should any driveways be constructed to grades that do not
comply with AS2890.1-1993 and AS2890.2-1989, Council will require that the driveway be removed and
reconstructed to levels that do comply.
16. All vehicles shall enter and leave the site in a forward direction.
Vehicle Access Easement
17. An easement for vehicle access and services shall be created over Lot 65 on RP 52918 to the benefit of
Lot 3 on RP 122368. The easement shall be of minimum width of 3.0 metres. The width shall be
increased where necessary to accommodate services or to provide maneuvering space if necessary. A
survey plan of the proposed easement shall be submitted to Council for approval.
The Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that the Title
Deed and the easement documents will be lodged at the Land Titles Office and any additional Titles
Office forms or requisitions requiring the consent of Council will be attended to promptly.
Any amendments required by Council’s Solicitor must be corrected immediately. In this regard the
registration of this easement with the Land Title Office shall be finalised prior to obtaining a Development
Permit for Operational Works.
Carparking
th
18. Carparking shall be provided within the site as shown on drawing number A01 dated September 7 2007
submitted by MORQ*, except as modified herein.
19. A minimum of 2 covered carpark spaces shall be provided on site.
20. The carparking area shall be designed to comply with the provisions of AS 2890.1-1993 for user class 1
except the minimum head clearance (headroom) at any point shall be 2.3m.
Stormwater Drainage
21. All stormwater drainage shall be collected and discharged on site with an overflow pipe connected to
Councils existing stormwater system in Park Road. The design shall incorporate some means of reducing
the head of the discharge prior to entry to Council’s system. In this regard, plans shall be prepared by a
Registered Professional Civil Engineer and submitted to Council prior to obtaining a Development Permit
for Operational Works.
22. All site stormwater drainage shall be by means of a gravity systems.
Sewer Mains
23. The development site shall be connected to the Council’s existing sewer manhole (NH01/33/03) located
outside the southwest corner of the property.
SEP o:\database\onestop\decision.doc
Page 5
NOOSA COUNCIL IDAS Development Application Decision Notice 5
24. The sewer connection to the site shall be in accordance with Council’s standards and requirements at no
cost to Council. The applicant is advised that a Compliance Permit for all plumbing and drainage works
within the boundaries of the development site shall be obtained from Council’s Plumbing Services Section
prior to obtaining a Development Permit for Building Works.
Town Water Supply
25. The site shall be connected to Council’s existing town water supply in Allambi Rise and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
26. Each water connection to the water reticulation system shall extend to the property boundary and be
metered.
Geotechnical Issues/Construction
27. All construction works on site shall accord with the Geotechnical Reports prepared by Golder Associates
dated July 2003 and Morrison Geotchnic dated 23 November 2006 and subsequent reports specific to the
amended design (including the pool), subject to amendments to address condition No. 43, with cut and fill
for retaining walls not to exceed a maximum depth of 1.5 metres.
The applicant’s geotechnical engineer is required to be on site for the whole of the time during any
excavation and house foundations including the construction of the retaining walls and the footing for the
falsework. Such work shall only be carried out during dry weather conditions. The geotechnical engineer
shall also inspect the site periodically throughout the construction of the dwelling and certify the stability of
the structure upon its completion. Should any risk of sand movement occur - all work shall be suspended
until steps (approved by the Geotechnical engineer) have been taken to ensure that no further slippage
will result.
28. The disposal of sand, soil or any materials created by the construction of the dwellings shall be removed
in accordance with the Construction Management Plan. Details of the method of this disposal of materials
are to be submitted to Council at the Building Application stage. Not more than one vehicle at a particular
time will be parked in Park Road for the removal of, or the delivery of, materials associated with the site
and no such vehicle shall remain overnight. No materials are permitted to be stored within the road
reserve.
29. A programme of works is to be submitted with any application for any Development Permit for Operational
Works detailing the construction schedule and proposed environmental protection measures, including a
vegetation management plan, which addresses stabilisation of disturbed areas.
Where the program is changed for any reason whatsoever, a copy of the revised program shall be
submitted to Council’s Works Inspector within seven (7) days.
30. A Traffic Management Plan for the Construction of the Dwelling addressing the access to the site, the
locating of equipment, carparking arrangements for workers on the site and any potential conflicts with
local traffic shall be submitted to Council for approval prior to works commencing on site.
31. Prior to the issue of Building Permit the builder shall submit written acknowledgment that building works
shall proceed in accordance with the 9 tonne load limit applicable to Park Road, unless varied by Council.
32. At the completion of construction the consulting geotechnical engineer will certify that all works were
carried out in accordance with their recommendations and that the structures and the site are stable.
33. A Condition Survey is to be carried out on adjoining buildings, structures and services prior to any
construction works taking place on site. If distress already exists, a photographic survey shall be
undertaken, the distress measured and a plan to monitor changes to distress shall be implemented. A
copy of this report is to be submitted to Council within 5 business days of survey and prior to construction
work proceeding.
34. The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers, the use
of vibrating installation techniques for sheet piling and other construction vibrations caused by excavating,
earthmoving or demolition machinery or other similar construction techniques.
SEP o:\database\onestop\decision.doc
Page 6
NOOSA COUNCIL IDAS Development Application Decision Notice 6
Erosion and Sediment Control
35. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
Vegetation Protection
36. Vehicular pavements within the drip zone of any of the existing trees on site to be retained shall be
designed as a pervious pavement (such as grass paving cells or similar), as this will allow water that falls
on this surface to penetrate to the trees root system. The pavement shall be constructed so as not to
damage the tree or their root system and in this regard temporary fencing shall be provided around the
trees during construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of the pervious
pavement and the temporary fencing prior to obtaining a Development Permit for Operational Works.
Roadworks Contributions
37. A roadworks contribution of $2,524 towards the Coastal Major Road Network in accordance with Planning
Scheme Policy PSP42, shall be paid to the Council prior to obtaining a Development Permit for
Operational Works. This amount will be subject to variations in the Price Index, All Groups Brisbane from
March 2004 until the date of payment.
Pathway Contributions
38. A pathway contribution of $246 towards external major pathways, in accordance with Planning Scheme
Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior to obtaining a
Development Permit for Operational Works. This amount will be subject to variations in the Price Index,
All Groups Brisbane from March 2004 until the date of payment.
General
39. Any damage caused to any public utility during the course of construction shall be repaired to Council’s
standards and at no cost to Council.
40. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
41. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
Building
42. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged
with Council at completion of the work confirming compliance with the maximum building height of 9
metres above natural surface.
43. All building works shall be in accordance with the Geotechnical reports prepared by Golder Associates
dated July 2003 and Morrison Geotchnic dated 23 November 2006 subject to the following conditions:-
43.1. An amended Geotechnical Report addressing the design amendments associated with this
approval shall be submitted to Council for its information prior to the application for Operational
Works;
43.2. There is to be no uncontrolled discharge of water onto the slope;
43.3. Stripping of vegetation for construction purposes should be minimised. If vegetation is destroyed it
should be reinstated immediately after construction is completed;
43.4. Additional load due to fill, construction equipment or stockpiled materials should not be located on
the dune slope;
SEP o:\database\onestop\decision.doc
Page 7
NOOSA COUNCIL IDAS Development Application Decision Notice 7
43.5. The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers,
the use of vibrating installation techniques for sheet piling and other construction vibrations caused
by excavating, earthmoving or demolition machinery or other similar construction techniques;
43.6. The construction management plan is to be adhered to;
43.7. Copies of all inspection reports by engineers are to be submitted to Council within 5 business days
of the inspection taking place;
43.8. The applicant’s Geotechnical engineer will be required to be on site for the whole of the time during
any excavation. The construction of the whole of the foundations and retaining walls is to be
supervised and directed on site by a consulting Geotechnical engineer. No work of any such kind
relating to the foundations shall be carried out if he is not on the site and supervising and directing
this work. Such works shall only be carried out during dry weather conditions and if there is a risk
of sand movement occurring, all work shall be suspended until such steps, approved by the
applicant’s Geotechnical engineer and the Council’s Building Surveyor, have been taken to ensure
that no further slippage will result.
43.9. Survey marks should be established on the structure to monitor the construction and surrounds for
movement. Monitoring for any potential movement shall be carried out at regular intervals of a
maximum length time of three (3) months for at least the first year from the use commencing. The
monitoring results shall be assessed by a geotechnical engineer and may be scaled down or
stoped depending on the results and subject to the geotechnical engineer recommendations.
Additional Condition 29/03/07
44. The sewer connection shall be undertaken in accordance with an approved Arborist’s report and the
following requirements:
44.1. The route for the service trench shall be a minimum of 1.5 metres clear of all trees and shrubs,
unless otherwise agreed to by the Manager, Land Use.
44.2. An arborist shall be on site all times supervising the works being undertaken.
44.3. Prior to commencing any works, the route for the service trench shall be pegged and inspected by
Manager, Land Use.
44.4. Prior to excavation existing mulch/leaf cover material over proposed trench shall be raked back
and stockpiled for covering of trench area after completion.
44.5. Works shall be undertaken in a progressive manner and route reinstated as works progress.
44.6. Uphill anchor roots of trees shall not be disturbed.
44.7. All works shall be carried out by hand excavation other then the sewer trench under existing road
pavement.
44.8. All excavated material shall be placed on a ‘tarpaulin’ or the like laid immediately adjacent to the
proposed trench.
44.9. Excavated material shall be used as bedding and backfilling of trench.
44.10. Where works disturb the understorey vegetation, rehabilitation works shall be undertaken to the
reasonable satisfaction of Manager, Land Use.
SEP o:\database\onestop\decision.doc
Page 8
NOOSA COUNCIL IDAS Development Application Decision Notice 8
Reconfigure a Lot Conditions
1. For the purpose of these conditions, the following definitions apply: -
A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by Council
pursuant to S3.7.1 of the Integrated Planning Act 1997.
2. Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the currency period is two (2) years
from the day this permit takes effect during which time all conditions must have been complied with and
the Plan of Survey lodged with the Council for endorsement.
3. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal documentation
shall be presented to Council and shall be submitted in the correct form with the fees prescribed in
Council's adopted fee schedule.
4. Pursuant to Section 3.7.3(c) of the Integrated Planning Act, all outstanding rates and charges due and
payable to Noosa Council in respect of the lots being reconfigured shall be paid prior to endorsement of
the Plan of Survey for each stage.
5. Prior to undertaking any excavation, the person acting on this permit shall contact public utility service
providers to ascertain the location of their underground services.
6. The person acting on this permit shall apply and obtain for all other necessary permits including crane
permits, road opening permits, hoarding permits, footpath occupation permits and/or any other approvals
required under any other Act.
7. Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant
shall sign a written undertaking to be responsible for the full cost of repairs to road pavement, footpath,
kerb and gutter, or other Council property damaged as a result of construction of the proposed
development.
If any person acting under this permit damages any Council property or facilities (such as underground
drainage, water supply and sewerage) , through any cause whatsoever in the course of, directly or
indirectly carrying out development, that person shall forthwith notify the Manager - Land Development
and shall forthwith rectify that damage at its cost and to the satisfaction of the Manager - Land
Development. Alternatively, the Applicant may request the Council to carry out the rectification works.
Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall be
undertaken by either Council or a Council approved contractor.
In all cases, Council reserves the right to carry out rectification works in an emergency and where no
reasonable attempt has been made to complete the rectification works as part of the development.
All costs incurred by Council in any rectification works shall be repaid to Council prior to the endorsement
of the Plan of Survey.
8. Prior to commencement of the permitted use the person acting upon this permit shall demonstrate the
legal right to the easement for access over Lot 65 on RP 52918. Where no legal right exists, this permit
shall lapse.
9. Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's Solicitor an
appropriate undertaking in writing that in conjunction with lodgement of the Plan of Survey at the Land
Titles Office, the Title Deed and the easement documents will also be lodged and any additional Titles
Office forms or requisitions requiring the consent of Council being attended to forthwith.
SEP o:\database\onestop\decision.doc
Page 9
NOOSA COUNCIL IDAS Development Application Decision Notice 9
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated (5) If an application is processed under section
Planning Act (Chapter 4). 6.1.28(2), appeal rights for submitters for the
application are available only for the aspects of the
Division 8 - Appeals to court relating to development that would have required public
development applications notification under the repealed Act.
Appeals by applicants (6) If an application involves assessment against
4.1.27.(1) An applicant for a development application a concurrence agency code, appeal rights for
may appeal to the court against any of the following- submitters for the application are not available
against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a concurrence agency’s response for the code.
development application;
Appeals by advice agency submitters
(b) a matter stated in a development approval,
including any condition applying to the 4.1.29.(1) An advice agency may, within the limits of
development, and the identification of a code its jurisdiction, appeal to the court about the giving of
under section 3.1.6;1 a development approval for a development
application if-
(c) the decision to give a preliminary approval when a
development permit was applied for; (a) the development application involves impact
assessment; and
(d) the length of a currency period;
(b) the advice agency told the applicant and the
(e) a deemed refusal. assessment manager to treat its response to the
application as a submission for an appeal.
(2) An appeal under subsection (1)(a) to (d) must
be started within 20 business days (the “applicant’s (2) The appeal must be started within 20 business
appeal period”) after the day the decision notice or days after the day the decision notice or negotiated
negotiated decision notice is given to the applicant. decision notice is given to the advice agency as a
submitter.
(3) An appeal under subsection (1)(e) may be
started at any time after the last day a decision on the Appeals for matters arising after approval given
matter should have been made. (co-respondents)
Appeals by submitters 4.1.30.(1) For a development approval given for a
development application, a person to whom any of
4.1.28.(1) A submitter for a development application
the following notices have been given may appeal to
may appeal to the court about-
the court against the decision in the notice-
(a) the giving of a development approval, including
(a) a notice giving a decision on a request for
any conditions (or lack of conditions) or other
extension of the currency period for an approval;
provisions of the approval; or
(b) a notice giving a decision on a request to make a
(b) the length of a currency period for the approval.
minor change to an approval.
(2) The appeal must be started within 20 business
(2) The appeal must be started within 20 business
days (the “submitters appeal period”) after the day days after the day the notice of the decision is given
the decision notice or negotiated decision notice is to the person.
given to the submitter.
(3) Subsection (1)(a) does not apply if the
(3) If a person withdraws a submission before the approval resulted from a development application
application is decided, the person may not appeal the (superseded planning scheme) that was assessed as
decision. if it were an application under a superseded planning
(4) If an application involves both impact scheme.
assessment and code assessment, appeal rights for (4) Also, a person who has made a request
submitters are available only for the part of the mentioned in subsection (1) may appeal to the court
application involving impact assessment. against a deemed refusal of the request.
(5) An appeal under subsection (4) may be
started at any time after the last day the decision on
the matter should have been made.
1
Section 3.1.6 (Preliminary approval may override local planning
instrument)
SEP o:\database\onestop\decision.doc 18/12/07
Page 10
NOOSA COUNCIL IDAS Development Application Decision Notice 10
Division 9 - Appeals to court about other matters
Appeals for matters arising after approval given
(no co-respondents)
4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
(b) a notice under section 6.1.442 giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2
Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
SEP o:\database\onestop\decision.doc 18/12/07
Used in these records
SUPERSEDED COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 50 KB (small file)
- File type
No other editions are linked here.