No. Conditions
timing
Development permit for operational work for clearing vegetation
Schedule 10, Part 10, Division 3, Subdivision 3, Table 1, Item 1 (Planning Regulation 2017) –
Development interfering with koala habitat in koala habitat areas outside koala priority areas—The
chief executive administering the Planning Act 2016 nominates the Director-General of the Department
of the Environment, Tourism, Science and Innovation to be the enforcement authority for the
development to which this development approval relates for the administration and enforcement of any
matter relating to the following condition(s):
1. Interfering with koala habitat is limited to the clearing of 106 non-juvenile At all times.
koala habitat trees identified as ‘Removed (NJKHT)’ on KTSP04a: Trees
Retained and Removed, prepared by Litoria Consulting, dated 30/01/2025,
drawing reference 22011 KTSP04a and issue C.
2. Implement all measures and undertake any works in accordance with the Prior to and
Fauna Management Plan, prepared by Litoria Consulting, dated 24 January during all
2025 and version 1.0. clearing and
construction
activities.
3. (a) A rehabilitation plan must be prepared by an appropriately qualified (a) and (b) Prior
person(s), and must address as a minimum: to commencing
(i) Details of the rehabilitation objectives for the site; any clearing or
(ii) The number of Koala habitat trees to be established on the site; construction
(iii) The planting palette and planting density of the proposed works.
rehabilitation;
(iv) Details of how the vegetation planted as a result of the (c) To commence
rehabilitation work will be suitably maintained. no more than 1
month after the
(b) Provide the rehabilitation plan to the Department of the Environment, completion of
Tourism, Science and Innovation at [email protected] clearing and
or mail to: construction
Koala Assessment and Compliance works.
Department of the Environment, Tourism, Science and Innovation
PO Box 15187 City East, Queensland 4002 (d) Within 3
months from the
(c) Undertake the rehabilitation of the site in accordance with the completion of the
rehabilitation plan; rehabilitation
works.
(d) Certification by an appropriately qualified person(s) that (a), (b) and (c)
have been fulfilled, must be provided to the Department of the
Environment, Tourism, Science and Innovation at:
[email protected]
State Assessment and Referral Agency Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2506-46370 SRA Response with conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 279 KB (small file)
- File type
No other editions are linked here.