Referral Agency Response - Planning RAP24 0009 · RAP24/0009
Revetment Wall / Flood Storage
11. All works within the 4.5m setback from the revetment wall must be carried out generally
in accordance with the plans Flood Storage Model Site Plan (22-1107-F1, Rev. B)
prepared by Lindsay Consulting and dated 8 July 2024.
12. All works for the purpose of increasing available flood storage must be located within
the 4.5m setback from the revetment wall.
13. Certification of the completed works within the 4.5m setback from the revetment wall
must be submitted to Council within 3 months of the completion of the works. The
certification must be prepared by a RPEQ (Registered Professional Engineer of
Queensland) and state that the works:
a. have not reduced the amount of available flood storage within the 4.5m setback
from the revetment wall;
b. have not negatively impacted the stability of the revetment wall or negatively
impacted the associated membrane;
c. have not reduced the available flood storage within the lot from the profile as
described in The Noosa Plan 2020 – Low Density Residential Zone Code; and
d. meet the relevant conditions of this approval
Damage to Services and Assets
14. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Environment
15. Sediment or any other material including building materials or waste products must not
be deposited or released into the road reserve, stormwater drain or adjacent properties.
4. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
221107 - Flood Storage Calculations Prepared by 8 July 2024
Lindsay Consulting
22-1107- F1 B Flood Storage Model Site Plan Prepared 8 July 2024
by Lindsay Consulting
22-1107- F2 B Flood Storage Model Perspective View 8 July 2024
Prepared by Lindsay Consulting
5. REASONS FOR REFERRAL AGENCY’S DECISION
The proposal is subject to specific built form parameters outlined in The Noosa Plan (25
September 2020).
Page 3 of 5
Document Set ID: 23123077
Version: 2, Version Date: 24/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Planning RAP24 0009Related documentApplication case desk ↗
About this file
- File size
- 113 KB (small file)
- File type
No other editions are linked here.