Council archive · source document
Noosa Council Amendment Request MCU18-0001.01 · MCU18/0001.01
Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
WORKING DRAWING NOTES: SHEET LIST
GENERAL NOTES: WALL FRAMING NOTES: ROOF FRAMING NOTES: CONCRETE SETOUT NOTES: WATERPROOFING & WATER RESISTANT MATERIALS NOTES:
THE BUILDER IS RESPONSIBLE TO CHECK ALL EXISTING ALL TIMBER FRAMING IN ACCORDANCE WITH AS1684. INSTALL SARKING OVER BATTENS UNDER ROOF GROUND BENEATH SUBFLOOR IS TO BE GRADED PRIOR TO CONCRETE FOOTINGS TO COMPLY WITH AS3600 & ALL WET AREAS WATERPROOFING IS TO COMPLY WITH SHEET
SERVICES PRIOR TO BEGINNING CONSTRUCTION SHEETING FOR IMPROVED MOISTURE DRAINAGE WITH CONSTRUCTION SUCH THAT THE FGL BELOW THE BUILDING HAVE 20MPa (N20) WITH REINFORCEMENT AS DETAILED AS3740:2010 WATERPROOFING OF WET AREAS WITHIN
IT IS RECOMMENDED THAT TIMBERS USED IN THIS AIRCELL GLARESHIELD INSTALLED BELOW SARKING IS HIGHER THAN ADJACENT FGL SO PONDING DOES NOT & BE MECHANICALLY VIBRATED RESIDENTIAL BUILDINGS (BCA VOL2 P3.8.1.0) NUMBER SHEET NAME ISSUE
SANITARY COMPARTMENTS THAT ARE COMPLETELY PROJECT BE SOURCED FROM RESPONSIBLY MANAGED WITH 40mm AIR GAP FOR OPTIMUM THERMAL OCCUR BELOW THE BUILDING TO NCC VOL 2 P3.1.2.3(c)
ENCLOSED MUST HAVE A DOOR THAT IS READILY FORESTS, TREE PLANTATIONS OR RECYCLED WOOD RESISTANCE. FOR FURTHER INSULATION BUILDER TO COMPLY WITH AS3600 & AS2870 FOR CONCRETE VAPOUR BARRIER IS TO BE INSTALLED UNDER THE ALL WATERPROOFING MATERIALS & SYSTEM COMPONENTS ARE WD0.0 COVER PAGE WORKING DRAWINGS FOR CONSTRUCTION
REMOVABLE FROM THE OUTSIDE BUT THIS IS NOT THROUGH COMPANIES THAT HAVE BEEN CERTIFIED AS INSTALLATION DETAILS REFER TO ENERGY SLAB CONSTRUCTION SLAB ON GROUND CONSTRUCTION. IT IS TO BE 0.2mm TO BE INSTALLED ACCORDING TO MANUFACTURER'S
REQUIRED WHEN THERE IS 1200mm MIN BETWEEN THE COMPLYING WITH FOREST STEWARDSHIP COUNCIL EFFICIENCY DRAWINGS NOMINAL THICKNESS POLYETHYLENE FILM MEDIUM INSTALLATION INSTRUCTIONS & MATERIAL COMPATIBILITY IS TO WD1.0 SITE PLAN WORKING DRAWINGS FOR CONSTRUCTION
DOORWAY & THE WC PAN (NCC VOL2 P3.8.3.3) (FSC) STANDARDS. FOR FURTHER INFORMATION PLEASE THE DRAINAGE AND FLOOR HEIGHT ABOVE THE FINISHED IMPACT RESISTANT (AS2870, S5.3.3.2(c)) BE CHECKED BY THE BUILDER PRIOR TO USE.
REFER TO www.fsc.org (or) www.fscaustralia.org BUILDER TO REFER TO TRUSSED ROOF BRACING GROUND LEVEL SHOULD BE DESIGNED AND CONSTRUCTED WD2.0 LOWER FLOOR WORKING DRAWINGS FOR CONSTRUCTION
SITE DRAINAGE IS TO BE CONSTRUCTED ACCORDING TO NOMINATED BY THE TRUSS MANUFACTURER TO AVOID PONDING AGAINST OR NEAR THE CONCRETE FOOTINGS & SLABS ON GROUND REQUIRE MINIMUM WATERPROOFING SYSTEM IS TO ALLOW FOR CREEP, EXPANSION
AS/NZS3500.3 STORMWATER DRAINAGE OR AS/NZS3500.5 STRESS GRADE JOINT GROUP GENERAL FOOTING WITH THE GROUND AROUND THE BUILDING CONCRETE COVER TO THE OUTER EDGE OF & CONTRACTION OF SUBSTRATE (AS3470:2010 S2.3) WD3.0 GROUND FLOOR WORKING DRAWINGS FOR CONSTRUCTION
DOMESTIC INSTALLATIONS S5 (NCC VOL2 P3.1.2.0) MGP 10/F5 JD5 (PINE WITH PITH-IN) ROOF TRUSSES TO BE DESIGNED & INSTALLED IN PERIMETER, INCLUDING THE UPHILL SIDE OF CUT AND FILL REINFORCEMENT:
MGP 12/F8 JD4 (PINE NO PITH-IN) SPECIFIED ACCORDANCE WITH AS4440:2004 INSTALLATION OF SITES MUST BE SLOPED AWAY FROM THE BUILDING AT 50mm * 40mm TO UNPROTECTED GROUND NOMINAL MINIMUM FIXINGS: WD4.0 UPPER FLOOR WORKING DRAWINGS FOR CONSTRUCTION
WORKERS ARE TO DETERMINE SAFE MANUAL & MGP 15/F11 JD4 (PINE NO PITH-IN) FOR ENGINEERED NAILPLATED TIMBER ROOF TRUSSES MINIMUM IN 1000mm (AS1870 S5.2.1) * 30mm TO A MEMBRANE IN CONTACT WITH THE
MECHANICAL HANDLING , LIFTING & INSTALLATION OF ITEMS LGL ENGINEERED WOOD PRODUCTS ARE GROUND UNLESS SPECIFIED OTHERWISE, USE NOMINAL FIXINGS: WD5.0 ELEVATIONS WORKING DRAWINGS FOR CONSTRUCTION
ARCHITECTURAL FIXTURES & COMPONENTS WHILE DESIGNED WITH CAMBER & THE BUILDER IS TO ENSURE STRESS GRADE JOINT GROUP GENERAL TERMITE RISK MANAGEMENT IS TO BE INSTALLED TO * 20mm TO AN INTERNAL SURFACE (AS1684.3, S9.5 & T9.4)
FOLLOWING WHS INSTRUCTIONS ON MANUFACTURER'S BEAMS ARE INSTALLED RIGHT WAY UP. CURVED MGP 10/F5 JD5 (PINE WITH PITH-IN) ENSURE CLASS 1 & 10 BUILDINGS TO HAVE 50 YEAR DESIGN * 40mm TO AN EXTERNAL SURFACE (NCC VOL 2 P3.2.3.3) * 3.05Ømm MIN FOR HARDWOOD & CYPRESS FRAMING WD5.1 ELEVATIONS WORKING DRAWINGS FOR CONSTRUCTION
DOCUMENTATION BUILDING WHS REPORT TO BE STORED MEMBERS ARE TO BE INSTALLED ACCORDING TO THE MGP 12/F8 JD4 (PINE NO PITH-IN) LIFE BY COMPLIANCE WITH AS3660.1 TERMITE MANAGEMENT * 3.33Ømm MIN FOR SOFTWOOD FRAMING
IN LINEN CP FOR EASY ACCESS DESIGN DRAWINGS MGP 15/F11 JD4 (PINE NO PITH-IN) FOR ENGINEERED - NEW WORK (NCC VOL2 P3.1.3.0) METHOD OF TERMITE RISK * PLASTIC POLYMER (GLUE) COATED 0R ANNULAR OR HELICAL WD6.0 SECTION WORKING DRAWINGS FOR CONSTRUCTION
ITEMS LGL ENGINEERED WOOD PRODUCTS ARE MANAGEMENT IS TO BE PROVIDED WITH AT LEAST 2 DEFORMED SHANK NAILS MACHINE DRIVEN NAILS:
TIMBER FLOORS TO MEET THE REQUIREMENTS OF THE BUILDER SHOULD PROVIDE TEMPORARY BRACING DESIGNED WITH CAMBER & THE BUILDER IS TO DURABLE PERMANENT NOTICES IN KITCHEN CUPBOARD & USE HOT DIPPED GALVANISED, STAINLESS STEEL OR MONEL METAL WD6.1 SECTION WORKING DRAWINGS FOR CONSTRUCTION
AS4786.2:2005 TIMBER FLOORING - SANDING & FINISHING TO SUPPORT WIND & CONSTRUCTION LOADS DURING ENSURE BEAMS ARE INSTALLED RIGHT WAY UP & TO MSB (NCC VOL2, P3.1.3.2) NAILS IN DAMP OR WEATHER EXPOSED JOINTS
CONSTRUCTION. THIS MAY BE PART OF THE PERMANENT MANUFACTURER'S SPECIFICATIONS KEEP * WHEN NOT SPECIFIED IN FOLLOWING TABLE, NAIL LENGTH WD7.0 POOL PLAN WORKING DRAWINGS FOR CONSTRUCTION
DAMP PROOF COURSES & FLASHINGS ARE TO COMPLY BRACING & MUST BE EQUAL TO 60% MINIMUM OF UNSEASONED TIMBER MEMBERS SEPARATED FROM VISUAL INSPECTION CLEARANCES FOR TERMITE IS TO BE 10 x NAILØ WHEN DRIVEN INTO SIDE GRAIN
WITH AS/NZS2905:1995 PROPOSED SEASONED TIMBER MEMBERS TO PREVENT MANAGEMENT ARE TO BE APPLIED TO THE BUILDING FABRIC * WHEN NOT SPECIFIED IN TABLE NEXT, NAIL LENGTH IS WD8.0 WINDOWS, DOORS, GATES & SCREENS WORKING DRAWINGS FOR CONSTRUCTION
PERMANENT BRACING (AS1684.3, S8.2) DIFFERENCES IN SHRINKAGE & TOLERANCES TO BE 15 x NAILØ WHEN DRIVEN INTO END GRAIN
AS4662 CERAMIC TILES - DEFINITIONS, CLASSIFICATION, (AS1684.3 S1.13) WHERE THE SLAB EDGE HAS <75mm ESPOSURE, A SUITABLE * MINIMUM 2 NAILS PER JOINT UNO WD8.1 WINDOWS, DOORS, GATES & SCREENS WORKING DRAWINGS FOR CONSTRUCTION
CHARACTERISTICS & MARKING REQUIRE CERAMIC TILES RECOMMENDED 12% AVERAGE MOISTURE CONTENT OF TERMITE PERIMETER BARRIER SHOULD BE INSTALLED HAND DRIVEN NAILS:
OF THE BEST COMMERCIAL QUALITY (FIRST QUALITY), TIMBER MEMBERS AT INSTALLATION (AS1884.3, T.E1) RECOMMENDED 12% AVERAGE MOISTURE CONTENT (AS3660.1:2000, S.4.4) * 3.15Ømm MIN FOR HARDWOOD & CYPRESS WD9.0 EXTERNAL DETAILS WORKING DRAWINGS FOR CONSTRUCTION
CERAMIC FLOOR TILES SHALL BE TESTED TO BUILDER IS TO COMPLY WITH GECA32-2007 RECYCLED & OF TIMBER MEMBERS AT INSTALLATION (AS1884.3, * 3.75Ømm MIN FOR SOFTWOOD & LOWER DENSITY TIMBERS
AS/NZS4586 TO MEET AUSTRALIAN STANDARDS FOR THE RECLAIMED TIMBER STANDARD &/ INTERIM INDUSTRY T.E1) LGL ROOF TRUSSES ENGINEERED TO AS1720.1 THE BUILDER IS RESPONSIBLE TO CHECK ALL EXISTING WD9.1 INTERNAL DETAILS WORKING DRAWINGS FOR CONSTRUCTION
FIRST QUALITY CERAMIC TILES STANDARD RECYCLED TIMBER VISUALLY STRESS (AS1684.3 S1.12) SERVICES PRIOR TO BEGINNING CONSTRUCTION HANDRAIL & BALUSTRADE NOTES
GRADED RECYCLED TIMBER FOR STRUCTURAL CONCRETE IS TO COMPLY WITH AS3600 & HAVE A 25MPa WD10.0 LIGHTING PLAN WORKING DRAWINGS FOR CONSTRUCTION
PROVIDE INSECT SCREENS TO ALL WINDOWS BUT NOT PURPOSES TO ENSURE ANY RECYCLED TIMBER IS FIT (N25 GRADE) STRENGTH AT 28 DAYS, 20mm NOMINAL HANDRAILS, BALUSTRADES & ALL STAIR
EXTERNAL DOORS FOR PURPOSE AGGREGATE SIZE & 100mm SLUMP (UNO) & SL72 MESH & BE MEMBERS & CONNECTIONS TO MEET WD10.1 LIGHTING PLAN WORKING DRAWINGS FOR CONSTRUCTION
MECHANICALLY VIBRATED AS1170.1
TOTAL INTERNAL FLOOR AREA INCLUDES ALL INTERNAL WD11.0 POWER PLAN WORKING DRAWINGS FOR CONSTRUCTION
& EXTERNAL WALLS
WD11.1 POWER PLAN WORKING DRAWINGS FOR CONSTRUCTION
WD12.0 RCP WORKING DRAWINGS FOR CONSTRUCTION
WD13.0 EXTERNAL COLOURS WORKING DRAWINGS FOR CONSTRUCTION
WD14.0 LOWER FLOOR SETOUT WORKING DRAWINGS FOR CONSTRUCTION
WD14.1 GROUND FLOOR SETOUT WORKING DRAWINGS FOR CONSTRUCTION
WD14.2 UPPER FLOOR SETOUT WORKING DRAWINGS FOR CONSTRUCTION
WD15.0 INTERNAL WALL FINISHES PLAN WORKING DRAWINGS FOR CONSTRUCTION
CLIENT: Judy & Michael KLOBAS PROJECT: PIPIS
www.chriscloutdesign.com.au GENERAL NOTES:
Use written dimensions only. DO NOT scale drawings. Contractors SITE ADDRESS: Lot 696 on SP279875 8 Stevens Street Sunshine Beach QLD 4567
PO BOX 135, NOOSAVILLE, QLD 4566 to verify all dimensions on site prior to commencing works. Site
E: [email protected] location in accordance with engineers details. These drawings are to DRAWING TITLE: COVER PAGE
P: (07) 54748 107 be read in conjunction with engineers design and details, the
DATE: 08/08/19 SCALE: 1 : 100 @ A2 DRAWN BY: C.CLOUT
F: (07) 54748 108 BSA LICENCE: 1127508
accompanying building specification and schedule of finishes. If in
doubt, please request clarification. DO NOT ASSUME. ISSUE: WORKING DRAWINGS FOR CONSTRUCTION
WD0.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa Council Amendment Request MCU18-0001.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 12.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.