Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail Response to Info Request (Stormwater Managerment plan) - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Very large file (13.4 MB): may take a few minutes to open.
Original PDF page 11, section 1. The text section number identifies this passage in the reader.
GOOD SHEPHERD LUTHERAN COLLEGE Odyssey Consulting Group Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 Table 9: External Catchment A Peak Flow Rates Average Recurrence Interval ARI 2 5 10 20 100 Coefficient of Runoff C 0.60 0.67 0.70 0.74 0.84 Area of Catchment (ha) A 0.042 0.042 0.042 0.042 0.042 Average Rainfall Intensity (mm/h) I 121.1 149.7 166.0 188.6 240.5 Peak Flow Rate (m3/s) Q 0.008 0.012 0.014 0.016 0.024 3.4.5 External Catchment Channel Conveyance External Catchment A External Catchment A currently discharges stormwater through the site. Flows from External Catchment A will be captured in a field inlet in the subject site’s north eastern corner and conveyed to Council stormwater infrastructure on the north eastern boundary. For details and locations of the proposed field inlet refer to Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/D) included as Appendix F. 4.0 STORMWATER DETENTION The development of land will potentially increase peak flow rates from the subject site due to increased impervious areas and a reduced critical time of concentration. The following section provides preliminary details of an onsite detention system ensuring there will be no adverse impacts associated with the increased runoff rate on downstream properties and infrastructure. 4.1 Objective In accordance with Urban Stormwater Quality Planning Guidelines 2010 (DERM USQG) the following objective has been set for stormwater discharge from the site and proposed development: No net increase in peak flows from the subject site for all events up to the Q100 storm event during the post developed condition. This objective shall be achieved by detaining site runoff within a detention tank located within the development. 4.2 Hydraulic Model A calculation of the required detention volume to mitigate any increase in total site discharge rates has been made using the DRAINS software programme. DRAINS modelling has been adopted at the preliminary planning stage to ensure that the detention tank volume is estimated with a higher degree of confidence. As finished site levels and internal pipe levels are still approximate, this initial calculation is an estimate but is accurate enough to progress the design with confidence. The DRAINS model comprised of two post development Catchments. Catchment A flows shall be directed towards existing stormwater infrastructure located in Eumundi Noosa Road via a detention basin. Catchment B flows shall be directed towards existing stormwater infrastructure located in Walter Hay Drive. The 2, 10 and 100 year ARI storm events were analysed for all standard durations ranging from 10 minutes to 180 minutes. It was determined that the 25 minute storm is the critical duration for the peak site discharge for both the pre development and post development scenarios. The combined peak discharge rates for the site calculated by the DRAINS model is shown below for both scenarios. K4277-0002-C 05 November 2018 Page 7 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.