Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail Response to Info Request (Stormwater Managerment plan) - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Very large file (13.4 MB): may take a few minutes to open.
Original PDF page 37, section 1. The text section number identifies this passage in the reader.
N
EUMU
NDI N
OOSA
ROAD
DSP
DSP
DSP DSP
MS1
LEGEND
SEDIMENT FENCE
SEP STABILISED ENTRY/EXIT POINT
MS1
WATER QUALITY MONITORING STATION
LOT 30
SP170751 DSP DRAINAGE STRUCTURE PROTECTION
WALTER HAY DRIVE
PROPOSED STORMWATER DRAINAGE
EXISTING STORMWATER PIPE
EXISTING TELSTRA
EXISTING WATER MAIN
EXISTING OVERHEAD ELECTRICAL
DSP
EXISTING SEWER MAIN
DSP
PROPOSED TREES
DSP
SEP TREES TO REMAIN
LOT 1
SP228052
REPORT ISSUE
NOT FOR CONSTRUCTION
CONTRACTOR TO CONFIRM AND
1:250 AT A1 0 5 10 15 20m LOCATE ALL EXISTING SERVICES PRIOR
1:500 AT A3
TO COMMENCEMENT OF WORKS
Rev. Date Revision Details Drn App.
Builders Name Client Name Project Details Drawing Title: Drawn
DKC
Signed Date Scale: Sheet Size
A1
Project Number
Odyssey Consulting Group Designed Signed Date
K4277
Structural and Civil Engineers PROPOSED CARPARK SEDIMENT AND EROSION JP
GOOD SHEPHERD
Odyssey Consulting Group ABN 81 246 994 126 Telephone: +61 7 5575 7744
LUTHERAN COLLEGE
115 EUMUNDI ROAD CONTROL PLAN Checked Signed Date
Suite 5 Corporate House
155 Varsity Parade Varsity Lakes Q 4227
Facsimile: +61 7 5641 7992
w:odcconsulting.com.au
NOOSAVILLE AT
PO Box 4579 Robina Town Centre Email: [email protected] Drawing No. Rev.
C 05-11-18 ISSUED FOR REPORT
Queensland Australia 4230
Approved Signed Date
B 19-10-18 ISSUED FOR REPORT DKC AT
A 14-03-18 ISSUED FOR REPORT DKC AT
AT P008 C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.