Stormwater Management Plan

Attached to the e-mail Response to Info Request (Stormwater Managerment plan) - MCU18/0097.

of 40

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (13.4 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 7, section 1. The text section number identifies this passage in the reader.

GOOD SHEPHERD LUTHERAN COLLEGE                                                                  Odyssey Consulting Group
Lot 30 on SP170751                                                               Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville                                                                     Project No: K4277




                                                                          Subject Site




         Figure 2:      Aerial Photograph (modified from google maps.google.com.au)

2.2      Proposed Development
         The proposed development involves construction of a sealed carpark. Refer to the attached plans
         Burling Brown Architects, Site Plan (Ref: GSL06/SK02/P4), Carpark 1 (Ref: GSL06/SK03/P5) and Carpark 2 (Ref:
         GSL06/SK04/P4) in Appendix B.



3.0 SITE HYDROLOGY AND HYDRAULICS
3.1      Background
         The following sections define the parameters of the sites hydraulics. The Rational Method has been
         applied to define flow rates at and through the subject site.

3.2      Predevelopment

3.2.1 Catchment Definition and Lawful Point of Discharge
         The pre development scenario consists of an internal and small external catchment and small external
         catchment that conveys the stormwater to the south and west boundaries of the site where it
         discharges to the nature strip and into existing roadside kerb and channel along Eumundi Noosa Road
         and Walter Hay Drive, which represents the sites Lawful Point of Discharge (LPOD).

         The pre development catchments and LPOD are shown on ODC, Pre Development Catchment Plan
         (Ref: K4277/P005/B) in Appendix C.

3.2.2 Coefficient of Runoff
         A coefficient of runoff (Cy) was calculated for the site in accordance with the fraction impervious
         method from QUDM. A fraction impervious value of 0.00 was applied. With a 1 hour 10 year rainfall
         of 72.3 mm/hr and with reference to QUDM Table 4.05.3(a) the C10 coefficients of runoff was
         determined to be 0.70.

         With reference to QUDM Table 4.05.2, by applying the frequency factors for the standard storms of 2,
         5, 10, 20, 50 and 100 years result in the following pre development coefficients of runoff as shown in
         Table 2.



K4277-0002-C                                       05 November 2018                                         Page 3 of 16
Log in to download the original file

Stormwater Management Plan.pdf · 13.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.