Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail Response to Info Request (Stormwater Managerment plan) - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Very large file (13.4 MB): may take a few minutes to open.
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
GOOD SHEPHERD LUTHERAN COLLEGE Odyssey Consulting Group Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 Subject Site Figure 2: Aerial Photograph (modified from google maps.google.com.au) 2.2 Proposed Development The proposed development involves construction of a sealed carpark. Refer to the attached plans Burling Brown Architects, Site Plan (Ref: GSL06/SK02/P4), Carpark 1 (Ref: GSL06/SK03/P5) and Carpark 2 (Ref: GSL06/SK04/P4) in Appendix B. 3.0 SITE HYDROLOGY AND HYDRAULICS 3.1 Background The following sections define the parameters of the sites hydraulics. The Rational Method has been applied to define flow rates at and through the subject site. 3.2 Predevelopment 3.2.1 Catchment Definition and Lawful Point of Discharge The pre development scenario consists of an internal and small external catchment and small external catchment that conveys the stormwater to the south and west boundaries of the site where it discharges to the nature strip and into existing roadside kerb and channel along Eumundi Noosa Road and Walter Hay Drive, which represents the sites Lawful Point of Discharge (LPOD). The pre development catchments and LPOD are shown on ODC, Pre Development Catchment Plan (Ref: K4277/P005/B) in Appendix C. 3.2.2 Coefficient of Runoff A coefficient of runoff (Cy) was calculated for the site in accordance with the fraction impervious method from QUDM. A fraction impervious value of 0.00 was applied. With a 1 hour 10 year rainfall of 72.3 mm/hr and with reference to QUDM Table 4.05.3(a) the C10 coefficients of runoff was determined to be 0.70. With reference to QUDM Table 4.05.2, by applying the frequency factors for the standard storms of 2, 5, 10, 20, 50 and 100 years result in the following pre development coefficients of runoff as shown in Table 2. K4277-0002-C 05 November 2018 Page 3 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.