Approved Plans OPW21-0038
The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn -
NOOSA COUNCIL
APPROVED PLAN
OPW21/0038 30 APR 2021
DME
PROJECTS
Proposed Duplex Development
Operational Works Engineering Drawings
SCIC Developments
75 Southern Cross Parade
Sunrise Beach, QLD, 4567
Property Description
Lot 671 on RP 225123
Site Area = 847 m2
LGA: Noosa Council
Previous Approvals
MCU19/0118
Date: 5th March 2020
SCALE DRAWING STATUS
DME
APPROVED PROJECT DRAWING TITLE
DESIGN - DM AS SHOWN
Dale Martin - RPEQ 16845
FOR APPROVAL
HORIZONTAL DATUM DUPLEX DEVELOPMENT COVER PAGE DRAWING NUMBER
DRAWN - DM B MAR 21 IR RESPONSE DM
PROJECTS P.O. BOX 7481 00
A FEB 21 FOR APPROVAL DM - SIPPY DOWNS, QLD, 4556
Phone: 0438 157 612
75 SOUTHERN CROSS PARADE JOB NUMBER
APPROVED - DM 16/03/2021 ISSUE DATE DESCRIPTION BY
VERTICAL DATUM
Engineering - Design - Civil Project Services Email: [email protected] SUNRISE BEACH, QLD, 4567 200903
AHD ©DME Projects Pty. Ltd.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 23 pages
Page 2
-
NOOSA COUNCIL
N
APPROVED PLAN
OPW21/0038 30 APR 2021
W E
EXISTING INTER-ALLOTMENT
DRAINAGE
S
EXISTING SEWER
MANHOLE
34.80
35.20
35.60
35
.4
36.0
0
0
LEGEND
36.4
0
EXISTING
EXISTING STRUCTURES GULLY PIT
TBM
I.L. 33.82
(SCREW)
36.8 36 RL35.10
EXISTING DRIVEWAY 0 3366...4300
50
SURVEY CONTROL - TBM
37.
36.
20
80 TBM
(SCREW)
ELEC SERVICE
RL35.91
U/G TELSTRA SERVICE
37.60
EXISTING SEWER
38.00
37
EXISTING WATER MAIN .20
38.40
EXISTING U/G DRAINAGE
EXISTING CONTOURS 37.80
17.00
LOT BOUNDARIES EXISTING SEWER
MANHOLE TELSTRA PIT
EASEMENT BOUNDARIES
EXISTING FEATURES PLAN TBM (NAIL)
RL38.13
SCALE 1:200 @ A3
0 5 10
Meters
SCALE DRAWING STATUS
DME
APPROVED PROJECT DRAWING TITLE
DESIGN - DM AS SHOWN
Dale Martin - RPEQ 16845
FOR APROVAL
HORIZONTAL DATUM DUPLEX DEVELOPMENT EXISTING FEATURES DRAWING NUMBER
DRAWN - DM PROJECTS P.O. BOX 7481 01
A FEB 21 FOR APPROVAL DM - SIPPY DOWNS, QLD, 4556 75 SOUTHERN CROSS PARADE
APPROVED - DM 4/02/2021 ISSUE DATE DESCRIPTION BY
VERTICAL DATUM
Engineering - Design - Civil Project Services
Phone: 0438 157 612
Email: [email protected] SUNRISE BEACH, QLD, 4567 200903
JOB NUMBER
AHD ©DME Projects Pty. Ltd.
Page 3
SERVICES NOTE: N
+ 34.600 BOW 1- EXISTING SEWER CONNECTION TO BE USED FOR NEW DEVELOPMENT
+ 35.600 TOW 2 - WATER CONNECTION TO BE UPGRADED TO UW REQUIREMENTS ALL SURFACES TO DRAIN
+ 34.600 BOW 3 - ELECTRICAL AND TELECOMMUNICATIONS CONNECTIONS TO AUTHORITIES STANDARDS TO PITS WHERE SHOWN
NOMINAL SURFACE W E
GRADE 1%
+ 35.450
RET
AININ
GW DECKS AND PATIO S
MAX ALL
POOL
GRAD . 1.0m (FILL) SURFACE TO BUILDERS NO PARKING SIGNS 450SQ FIELD BIN STORAGE AREA
E 100mm HIGH BUND FORMED IN CONCRETE
SPECIFICATION TO ENSURE TURN INLET WITH
+ 34.960 BOW AREAS KEPT CLEAR ROOFWATER GULLY DRAIN CONNECTED TO SEWER IN
STUBS ACCORDANCE WITH HYDRAULICS PLANS AND
+ 35.350 TOW
RETAINING WALL (FILL)
FUTURE PLUMBING APPROVAL
PROVIDE HOSE COCK AND BACKFLOW
LOW RETAINING PREVENTION DEVICE WITHIN ENCLOSURE
MAX. 1.0m + 35.450 WALL/GARDEN
EDGING
GRAD CONCRETE FOOTPATH
E 2.0m WIDE - AS PER
35.150 + + 34.900 IPWEAQ STD DWG R-065
RETAINING W
ALL
APPROX. 1.0m
35.300 + + 34.580 KERB INVERT
+ 36.500 36.400 +
TRANSITION
E
AD
<1500mm DUE
UNIT 2
GR
TO 3.0m VERGE
+ 36.550 TOW DRIVEWAY OUT
0
RETAINING WALL CONTROL LINE
+ 35.600 BOW
36.300 +
14
35.700
37.100 TOW + + 37.100 + 35.750 + + 35.620
RETAINING WALL (CUT)
MAX. 1.5m
UNIT 1 NEW CONCRETE ACCESS
DRIVEWAY AS PER
14
GRADE
36.440 + + 36.400 IPWEAQ STD DWG RS-050
+ + 36.275
+ 36.800 TOW 36.355
0
POOL
DRIVEWAY IN
+ 36.500
CONTROL LINE
+ 37.050 BOW
GRADE
+ 38.450 TOW 36.900 + + 36.550
+ 38.375 TOW + 36.600 BOW
36.500 BOW + GRATED DRAIN
+ 37.700 TOW ACROSS DRIVEWAY
+ 37.700 TOW 200mm ACO OR
RETAINING WALL (CUT)
0 5 10 SIMILAR
MAX. 1.5m
Meters
300SQ FIELD 450SQ FIELD
INLET INLET WITH
DESIGN SURFACE
ROOFWATER
LEGEND + 110.80 STUBS
SPOT LEVEL
-
DECKS AND NO PARKING SIGNS
LANDSCAPING
PATIOS
DESIGN MAJ.
PROPOSED LAYOUT TO ENSURE TURN REFER TO STRUCTURAL NOOSA COUNCIL
CONTOURS
SCALE 1:150 @ A3 AREAS KEPT CLEAR ENGINEERS DRAWINGS FOR APPROVED PLAN
RETAINING WALL TYPE, DETAILS
OPW21/0038 30 APR 2021
PROPOSED DESIGN MIN.
CONCRETE AND FOOTING ARRANGEMENT
RETAINING CONTOURS
DRIVEWAY
WALLS
SCALE DRAWING STATUS
DME
APPROVED PROJECT DRAWING TITLE
DESIGN - DM AS SHOWN
Dale Martin - RPEQ 16845
FOR APPROVAL
HORIZONTAL DATUM DUPLEX DEVELOPMENT PROPOSED LAYOUT DRAWING NUMBER
DRAWN - DM B MAR 21 IR RESPONSE DM
PROJECTS P.O. BOX 7481 02
A FEB 21 FOR APPROVAL DM - SIPPY DOWNS, QLD, 4556
Phone: 0438 157 612
75 SOUTHERN CROSS PARADE JOB NUMBER
APPROVED - DM 16/03/2021 ISSUE DATE DESCRIPTION BY
VERTICAL DATUM
Engineering - Design - Civil Project Services Email: [email protected] SUNRISE BEACH, QLD, 4567 200903
AHD ©DME Projects Pty. Ltd.
Page 4
-
NOOSA COUNCIL
2.0m FOOTPATH
RP BOUNDARY
DESIGN DRIVEWAY
KERB INVERT
APPROVED PLAN SURFACE PROFILE
OPW21/0038 30 APR 2021
0.61% 4.72% 1.78%
-7.56% 1.33% 13.56%
-2.57% 11.74%
CHAINAGE
10
15
-5
0
5
UNIT 1 VEHICLE TURNING PATH
SCALE 1:200@ A3
DRIVEWAY IN VERTICAL CLEARANCE
SCALE 1:100@ A3
LOW CLEARANCE B85
VEHICLE TEMPLATE USED
DESIGN DRIVEWAY
SURFACE PROFILE
2.0m FOOTPATH
RP BOUNDARY
KERB INVERT
-1.60% -3.92% -0.50%
-14.25%
-2.09% -9.68% -2.24% -8.22%
-11.01%
UNIT 2 VEHICLE TURNING PATH
SCALE 1:200@ A3
CHAINAGE
10
15
-5
0
5
DRIVEWAY OUT VERTICAL CLEARANCE
SCALE 1:100@ A3
SCALE DRAWING STATUS
DME
APPROVED PROJECT DRAWING TITLE
DESIGN - DM AS SHOWN
Dale Martin - RPEQ 16845
FOR APPROVAL
HORIZONTAL DATUM DUPLEX DEVELOPMENT VEHICLE TRACKING DRAWING NUMBER
DRAWN - DM B MAR 21 IR RESPONSE DM
PROJECTS P.O. BOX 7481 03
A FEB 21 FOR APPROVAL DM - SIPPY DOWNS, QLD, 4556
Phone: 0438 157 612
75 SOUTHERN CROSS PARADE JOB NUMBER
APPROVED - DM 16/03/2021 ISSUE DATE DESCRIPTION BY
VERTICAL DATUM
Engineering - Design - Civil Project Services Email: [email protected] SUNRISE BEACH, QLD, 4567 200903
AHD ©DME Projects Pty. Ltd.
Page 5
A
-
NOOSA COUNCIL
APPROVED PLAN
OPW21/0038 30 APR 2021 N
W E
B
34.80
S
35.20
LEGEND
35.60
C
CUT AREAS
35
.4
0
36.0
0
FILL AREAS
36.4
EXISTING
0 17.00
CONTOURS
36.8
0 336.3
366..400
50
E
37.
D EARTHWORKS VOLUMES
20
36.
80
CUT FILL
122 m3 191 m3
VOLUMES ARE CALCULATED FROM
THE EXISTING SURFACE TO THE
FINSHED SURFACES
37.60
38.00
37
.20
38.40
37.80
0 5 10
EXTENT OF EARTHWORKS PLAN
Meters SCALE 1:150 @ A3
SCALE DRAWING STATUS
DME
APPROVED PROJECT DRAWING TITLE
DESIGN - DM AS SHOWN
Dale Martin - RPEQ 16845
FOR APPROVAL
HORIZONTAL DATUM DUPLEX DEVELOPMENT EXTENT OF DRAWING NUMBER
DRAWN - DM B MAR 21 IR RESPONSE DM
PROJECTS P.O. BOX 7481
EARTHWORKS 04
A FEB 21 FOR APPROVAL DM - SIPPY DOWNS, QLD, 4556
Phone: 0438 157 612
75 SOUTHERN CROSS PARADE JOB NUMBER
APPROVED - DM 16/03/2021 ISSUE DATE DESCRIPTION BY
VERTICAL DATUM
Engineering - Design - Civil Project Services Email: [email protected] SUNRISE BEACH, QLD, 4567 200903
AHD ©DME Projects Pty. Ltd.
Page 6
REFER TO STRUCTURAL
RETAINING WALLS
RP BOUNDARY
ENGINEERS DRAWINGS FOR EXISTING SURFACE
RETAINING WALL TYPE, DETAILS
AND FOOTING ARRANGEMENT
RP BOUNDARY
PROPOSED SURFACE
-
NOOSA COUNCIL
APPROVED PLAN
OPW21/0038 30 APR 2021
Datum 32.000
0.12
0.95
0.17
0.77
DEPTH CUT
0.60
FILL
35.500
35.500
35.500
37.130
37.150
CONTROL LINE LEVELS
34.904
35.620
36.454
37.300
37.916
EXISTING SURFACE
CHAINAGE
20
25
30
35
10
15
-5
0
5
SECTION A
SCALE 1:150 @ A3
RP BOUNDARY
PROPOSED BUILDING
RP BOUNDARY
Datum 32.000
0.66
DEPTH CUT
0.09
0.76
0.10
FILL
35.483
36.500
36.500
36.500
CONTROL LINE LEVELS
35.396
35.739
36.397
37.157
EXISTING SURFACE
CHAINAGE
20
25
30
35
10
15
-5
0
5
0 5 10
SECTION B
Meters SCALE 1:150 @ A3
SCALE DRAWING STATUS
DME
APPROVED PROJECT DRAWING TITLE
DESIGN - DM AS SHOWN
Dale Martin - RPEQ 16845
FOR APPROVAL
HORIZONTAL DATUM DUPLEX DEVELOPMENT EARTHWORKS DRAWING NUMBER
DRAWN - DM PROJECTS P.O. BOX 7481
SECTIONS 05
A FEB 21 FOR APPROVAL DM - SIPPY DOWNS, QLD, 4556
Phone: 0438 157 612
75 SOUTHERN CROSS PARADE JOB NUMBER
APPROVED - DM 4/02/2021 ISSUE DATE DESCRIPTION BY
VERTICAL DATUM
Engineering - Design - Civil Project Services Email: [email protected] SUNRISE BEACH, QLD, 4567 SHEET 1 OF 3 200903
AHD ©DME Projects Pty. Ltd.
Page 7
RP BOUNDARY
RETAINING WALL
PROPOSED BUILDING
PROPOSED SURFACE
EXISTING SURFACE
0.18
DEPTH CUT
0.42
0.47
0.43
0.95
FILL
35.500
36.000
36.000
36.000
36.500
CONTROL LINE LEVELS
35.534
35.552
35.683
35.578
35.568
35.496
35.273
EXISTING SURFACE
CHAINAGE
40
20
25
45
30
35
10
15
-5
0
5
SECTION C
SCALE 1:150 @ A3
PROPOSED BUILDING
RP BOUNDARY
Datum 34.000
DEPTH CUT
0.06
FILL
37.145
CONTROL LINE LEVELS
37.090
EXISTING SURFACE
-
CHAINAGE NOOSA COUNCIL
10
15
-5
0
5
APPROVED PLAN
0 5 10 OPW21/0038 30 APR 2021
Meters
SECTION D
SCALE 1:150 @ A3
SCALE DRAWING STATUS
DME
APPROVED PROJECT DRAWING TITLE
DESIGN - DM AS SHOWN
Dale Martin - RPEQ 16845
FOR APPROVAL
HORIZONTAL DATUM DUPLEX DEVELOPMENT EARTHWORKS DRAWING NUMBER
DRAWN - DM PROJECTS P.O. BOX 7481
SECTIONS 06
A FEB 21 FOR APPROVAL DM - SIPPY DOWNS, QLD, 4556
Phone: 0438 157 612
75 SOUTHERN CROSS PARADE JOB NUMBER
APPROVED - DM 4/02/2021 ISSUE DATE DESCRIPTION BY
VERTICAL DATUM
Engineering - Design - Civil Project Services Email: [email protected] SUNRISE BEACH, QLD, 4567 SHEET 2 OF 3 200903
AHD ©DME Projects Pty. Ltd.
Page 8
-
NOOSA COUNCIL
RP BOUNDARY
KERB INVERT
APPROVED PLAN
OPW21/0038 30 APR 2021
EXISTING SURFACE
PROPOSED BUILDING
PROPOSED SURFACE
Datum 32.000
0.22
0.20
DEPTH CUT
0.06
FILL
36.360
36.487
35.958
CONTROL LINE LEVELS
36.285
36.703
36.564
35.898
EXISTING SURFACE
CHAINAGE
20
25
10
15
-5
0
5
SECTION E
SCALE 1:150 @ A3
0 5 10
Meters
SCALE DRAWING STATUS
DME
APPROVED PROJECT DRAWING TITLE
DESIGN - DM AS SHOWN
Dale Martin - RPEQ 16845
FOR APPROVAL
HORIZONTAL DATUM DUPLEX DEVELOPMENT EARTHWORKS DRAWING NUMBER
DRAWN - DM PROJECTS P.O. BOX 7481
SECTIONS 07
A FEB 21 FOR APPROVAL DM - SIPPY DOWNS, QLD, 4556
Phone: 0438 157 612
75 SOUTHERN CROSS PARADE JOB NUMBER
APPROVED - DM 4/02/2021 ISSUE DATE DESCRIPTION BY
VERTICAL DATUM
Engineering - Design - Civil Project Services Email: [email protected] SUNRISE BEACH, QLD, 4567 SHEET 3 OF 3 200903
AHD ©DME Projects Pty. Ltd.
Page 9
-
NOOSA COUNCIL
APPROVED PLAN
OPW21/0038 30 APR 2021
SCALE DRAWING STATUS
DME
APPROVED PROJECT DRAWING TITLE
DESIGN - DM AS SHOWN
Dale Martin - RPEQ 16845
FOR APPROVAL
HORIZONTAL DATUM DUPLEX DEVELOPMENT NOTES DRAWING NUMBER
DRAWN - DM PROJECTS P.O. BOX 7481
SIPPY DOWNS, QLD, 4556 75 SOUTHERN CROSS PARADE (AS APPLICABLE) 09
A FEB 21 FOR APPROVAL DM
Phone: 0438 157 612 JOB NUMBER
APPROVED 4/02/2021 ISSUE DATE DESCRIPTION BY
VERTICAL DATUM
Engineering - Design - Civil Project Services Email: [email protected] SUNRISE BEACH, QLD, 4567 200903
AHD ©DME Projects Pty. Ltd.
Page 10
-
NOOSA COUNCIL
APPROVED PLAN
DRAWING SCHEDULE OPW21/0038 30 APR 2021
19261 CD-000 COVER SHEET
19261 CD-001 SPECIFICATION NOTES
19261 CD-101 LANDSCAPE PLAN
19261 CD-200 CONSTRUCTION DETAILS
A
B
UP
UP
C
UP
UP
E
UP
D
UP
Revision Date Amendment Drawn Checked
APPROVAL ONLY
COVER SHEET NOT FOR CONSTRUCTION
A
B
2021.02.01
2021.03.18
For Approval
Request for Information Response
XL
XL
CS
CS
CD-000 scale: 1:200@A1; 1:400@A3
DUPLEX - 75 SOUTHERN CROSS PARADE, SUNRISE BEACH
NORTH
Project No. 16261 Client: BLACK AND WHITE PROJECTS
Page 11
9. Services
LANDSCAPE NOTES Ensure sufficient supply of each species shown on the drawings is available to achieve the required layout and densities, and in the The location of all underground or overhead services shown on these drawings are indicative only. They have been
EXTENT OF WORKS event of supply for replacement stock due to failure, damage, unhealthy specimens or theft. Prior to plant stock arriving to site, a incorporated at the design or Council Approval stage for general information. The Landscape Contractor shall be
Nursery inspection including the Landscape Architect and Landscape Contractor is required. The plant supplier is to ensure all stock responsible for liaising with the Principal Contractor to determine where the 'As Constructed' location of all water,
Contractor shall allow to carry out items of landscaping as detailed on the Landscape Plans listed on 19261 Cover (or good selection of stock) is present during the inspection. It is also recommended that the Landscape Architect is on site to sewer, stormwater, electrical,communication or other existing services before commencing any excavation works.
Sheet CD-000. Contractor to ensure they have the latest issue of the documents prior to tendering and construction.
inspect plant stock and plant set out prior to planting.
Contractor should also take full account of documentation of Architectural, Civil Engineering, Hydraulic Engineering 10. MAINTENANCE OF LANDSCAPE WORKS
and Electrical Engineering works which will be made available on site. Hard surface layout is to be at the discretion of
Plant stock notes:
the Project Manager. Where there is conflicting information, contact the Landscape Architect. Where directed by the Principal Contractor all must comply with soil and erosion control measures.
- Container sizes are noted as follows:-
- Pots in millimetres. The Landscape Contractor is to allow for topping up mulch, rectifying defects, top dressing sunken edges, replacing
Landscape works for this contract are to include the following: failed or under-performing plant stock at the end of the Maintenance Period. All Council controlled works to be
- Bags in litres.
inclusive of a twelve (12) month maintenance program.
1. Co-ordination with other Trades and conduit installation - Stock may be rejected if plants are:-
2. Excavation and Drainage of planting areas - Undersized proportional to specified container size or if the root system is underdeveloped.
Maintenance and Inspection Program
3. Topsoil - Supply and incorporation - Oversized proportional to specified container size or severely root bound. Responsibility Weeks after practical completion Maintenance Inspection
4. Edging to planting areas where not already supplied - Unbalanced or uncharacteristic of normal or specified growth pattern for the species. Frequency
5. Shaping of garden areas - Not suitably acclimatised for the specific environment. Contractor 0-2 3 per week
6. Containerised Plant Material - Supply and installation - Diseased, infested with pests or suffering from other form of significant stress. Contractor 3-4 2 per week
7. Garden Mulch - Supply and Spread - Have poor root development or root defects. Contractor 5 - 13 1 per week
8. Turf - Supply and lay - Substitution of specified plant species only by written instruction from Landscape Architect. Contractor 14 - onwards As per established maintenance regime
9. Services
10. Maintenance of landscape works (12 months) Implementation notes: Maintenance Program General Notes
11. Tree protection Ensure all planting procedures result in healthy plant species within the prevailing soil, climatic and management environment of - Maintenance inspection frequencies are minimum.
this project. The following minimum is expected: - Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture
1. Co-ordination with other trades - Excavate a hole for each plant twice the diameter of the rootball and 100mm deeper than the root ball. Break up the base of levels are critical during early establishment. Avoid over irrigating planting areas.
Contractor is to make full allowance for the reasonable activities of other trades. the hole to a further depth of 100mm and loosen the sides of the hole. - Mow turf every 2 weeks.
Contractor shall allow for the installation of electrical services for landscape lighting at the appropriate time in the - Remove the plant from the container with minimum disturbance to the root ball, place in final position, ensure it is central - Prune and shape all shrubs and trees on a monthly basis as required.
construction program. Contractor shall pay due consideration to installation of irrigation lines so as to minimise - Remove all stakes at 90 day inspection, or after satisfactory establishment.
and plumb. Ensure the root ball is level with the finished surface of the soil surrounding the hole or bed.
disturbance to planted areas. The coordination of appropriate conduit lines forms part of this contract. - Fertilise all garden beds and street trees at 3 months.
- Ensure correct placement of fertiliser requirements such as Nutri-Tech Solutions 'Life-Force Gold' + Life Force Carbon is
- Contractor shall maintain an up to date written log book to record inspection observations and actions.
ameliorated into existing or imported topsoil and that any water retention additive and the above fertilisers are installed as
Contractor shall take due care with any machinery to site. Particular care is to be taken with newly poured concrete - The log will be made available to the site superintendent, upon request, at any time for examination.
per the manufactures specification.
curbing and with newly laid A.C. road surfacing. Any damage to existing structures or services will be rectified at the - Thoroughly water plants immediately after planting with sea change KFF and at such times during the contract period Inspection Plan
contractors expense. Any disputes will be settled by the site Superintendent. as required. All large stock will require a minimum of 10ltrs of water and smaller stock 5ltrs of water at the time of planting. The Contractor shall co-ordinate the following inspections with the site superintendent.
- Backfill with topsoil as specified. Lightly tamp and water thoroughly to eliminate any air pockets. Ensure that - "Pre-start" - prior to commencement of works, for setout approval and construction timetable
Removal of Debris topsoil is not placed over the top of the rootball. confirmation.
Site is to be cleared and is to remain clear of any deleterious material prior to commencement and throughout
- Excavation inspection - at completion of excavation and drainage works and prior to topsoil addition.
construction of landscape works. Planting areas are to contain planting and selected drainage materials only and are All tree stock within the landscape works must be healthy, true to form and free of defects:
- Pre-planting inspection - at commencement of placement of advanced plant material.
not to contain any building material waste. - Setout inspection - at first setout of containerised plant stock.
- Roots should be of good form and free from circling, girdling, J-rooting or other defects/abnormalities. Contractor
to tease out roots and prune as required to encourage healthy root development. Contractor is not to accept trees - "On Maintenance" - at practical completion.
2. Excavation and drainage of planting areas
which are not of a high quality or grown to best horticultural practice. - "Off Maintenance" - 365 days after practical completion.
Break up and remove any asphalt, roadbase material or excess concrete slurry from kerbing works to achieve
- All tree stock to be inspected at unloading and prior to planting. Trees that fail to meet the above criteria are not be
required planting depths. Excavate site soil as required to ensure consistent high quality planting material. Break up
existing subgrade to a depth of 300mm. Any excavated planting areas are to be scarified at sides to provide
planted and are to be returned to the Nursery/Supplier. 11. Tree protection
anchorage for future root development. Additional excavation works will be required in areas of advanced plant - Collect all empty plant containers daily during planting operations, remove from site and return for nursery to re-use.
- Do not vary the plant locations from those specified on the drawings unless otherwise directed by the Tree protection fencing (TPZ) is to consist of 1.8m high ATF fencing erected around the tree protection zone as per council conditions and
material. Drainage is to be incorporated to all planting areas that are enclosed by hard edging and not otherwise as directed by project arborist. Fix 'Construction No Go Zone' sign at top section of fence at 25m intervals. Ensure that no storage or
drained. Contractor should allow for drainage to all garden areas. Superintendent. Should it be necessary to vary the locations and spacing for any reason, immediately apply for placement of bulk and/or harmful materials occurs under protected tree drip-lines; do not store or manoeuvre heavy machinery under or
directions by the Superintendent. Replace failed or damaged plants. This does not include vandalised or stolen plant within the drip-line of protected tree canopies; do not attach guys or stays to any protected trees; and any excavation within the tree
3. Topsoil - supply and incorporation material - this will be replaced prior to practical completion. drip-line is to be done by hand methods to prevent damage to root systems. Ensure suitable storm water measures/devices are
implemented to prevent contamination due to erosion of disturbed areas.
All soils are to comply with AS 4419 Table 1 (both site topsoil and imported topsoil)
Topsoil for garden areas should be a minimum 300mm depth. Where available maximise the use of soil from on site. Establishment notes:
All debris such as plastics, building materials and other dumped vegetative matter is to be disposed of appropriately and at regular
Top soils are to be tested for horticultural suitability and receive appropriate amelioration if required. All topsoil must The Establishment Period commences at the date of Practical Completion of Works. During the Establishment Period maintain best intervals and not stockpiled on site unless written instructions from Superintendent.
be free from noxious weeds, rocks, roots, nut grass, rubbish or any other deleterious material. horticultural pratices including (but not limited to) the following items where required: watering, weeding, fertilising, pest and
Place all topsoil in the areas directed and specified. Ensure that the topsoil is spread and graded evenly to prevent disease control, mulching, pruning, rubbish removal and keeping the site neat and tidy. Rectify defects that become apparent in the Existing trees marked to be retained must be protected from damage to ensure that the tree health is maintained with appropriate fences
any ponding. Prevent excess compaction by construction plant. Stripped site topsoil needs to be stored in piles no works under normal use. and signage. The following is the minimum excepted:
- Do not store or place bulk and/or harmful materials under or within the drip line of trees.
greater than 2m high x 3m wide. Topsoil storage piles for storage greater than 4 months should be seeded with a
- Do not store or maneuver heavy machinery under or within the drip line of the tree canopy.
suitable grass mix. Eradicate weeds using environmentally acceptable methods Project Urban discourages the use of 7. Garden mulch - supply and spread - Prevent wind blown materials such as cement from harming the tree.
Glyphosate and is happy to discuss alternative options with the Landscape Contractor. Noxious weeds need to be All mulch is to be free of deleterious or extraneous matter such as soil, weeds, rocks, and twigs. The finish level of the mulch is to be - Prevent damage to tree bark. Do not attach stays, guys or like to the trees.
screened out of the topsoil prior to placement. level with the finish level of all adjacent surfaces after settlement allowances of the topsoil and mulch. Ensure all mulch is placed - Any excavation within the tree drip line is to be done by hand methods to prevent damage to root systems.
clear of plant stems to avoid rotting at ground level. Mulch is to be coarse chipped forest mulch (a combination of wood, leaves and
4. Edging to planting areas bark) with no more than 10% fines nominal 25-50mm size or approved equal. Mulch shall be to a predominant depth of 100mm as Refer to the SCC LIM Section 4 - Planning for Tree Protection on Construction and Development Sites.
All planting areas adjoining turf are to be edged as specified on the landscape plans or detail sheets. Edging should described above. Mulch is to be formed to avoid placement against green plant stems and overflow from purpose formed edges,
finish flush with adjoining finished levels and hard pavements. Round / Ease all edges where applicable. kerbs and pathways. Samples of all mulch types to be provided to Landscape Architect for approval prior to installation.
5. Shaping of garden areas 8. Turf - supply and lay
Planting areas are to be finished in a well mounded fashion to facilitate drainage of excess water and to show Obtain turf from a specialist grower of cultivated turf.
planting to best advantage. Mounds to be generally of 1:3 max and 1:5 minimum at time of practical completion. Turf notes:
- "A" Grade turf as per Material Schedule with a minimum sod depth of 25 mm
6. Containerised plant material - supply and installation - Turf to be laid within 24 hours of being cut and on day of delivery.
All planting is to be carried out in a manner consistent with good horticultural practice. All plant stock is to be in - Grade turf areas evenly with falls to drains.
accordance with the scheduled nomenclature, well formed, hardened off nursery stock. They are to be container - Allow for ground preparation and placement of 100mm topsoil to specification requirements.
grown in potting mixture with a healthy root system and not pot bound. All pots shall be free of weeds and plant
- Apply 'turf starter' fertiliser prior to laying (as per Manufacturer's specifications).
stock is to be free from living insects, pests and disease. All plants are to be fully sun or shade hardened-off to suit
- Lay turf parallel to slope contours with staggered, close-butted joints so that the finished turf surface is flush with
their on-site growing position for a minimum period of 6 weeks. Contractor shall be responsible for replacing failed
adjacent finished surfaces.
plant stock within the 12 month maintenance period. It is therefore recommended that the Contractor does not
- Turf to be laid 10mm proud of adjoining surfaces to allow for settling of topsoil and to ensure there is a flush finish at at
accept below Standard stock from the Nursery/Supplier.
the end of the maintenance period.
- Water in well and roll after laying to remove undulations - ensure all joins are gap-free. Top-dress any gaps or
undulations with coarse washed sand. -
- Keep lawn moist until established and rooted in. Install temporary
NOOSA COUNCIL
barriers (flagging tape) to ensure walking and driving on turf
areas is prevented and avoided. APPROVED PLAN
- Replace failed turf and relay with new turf. OPW21/0038 30 APR 2021
Revision Date Amendment Drawn Checked
APPROVAL ONLY
SPECIFICATION NOTES NOT FOR CONSTRUCTION
A
B
2021.02.01
2021.03.18
For Approval
Request for Information Response
XL
XL
CS
CS
CD-001 scale: N/A
DUPLEX - 75 SOUTHERN CROSS PARADE, SUNRISE BEACH
NORTH
Project No. 16261 Client: BLACK AND WHITE PROJECTS
Page 12
LEGEND
EXTERNAL WORKS PLANTING DEMOLITION LEGEND
SOFTSCAPE GROUNDCOVERS
EG-1 EG-1 Concrete Edge
- Refer To Schedule EXISTING TREE TO BE
SHRUBS/GRASS RETAINED
EG-2 EG-2 Timber Edge
- Refer To Schedule
EXISTING TREE TO BE
8 SYZ SN EG-3 EG-3 Aluminium Link Edge
- Refer To Schedule HEDGES REMOVED
6 MET tho
RETAINING WALL TURF - A Grade Buffalo
REFER TO ARCHITECT T1 Sir Walter
3 ARC ale DRAWING TREES
EXISTING TREE TO BE RETAINED TURF - NewTurf Nature Strip
5 ALP cae T2 A Grade Couch Wintergreen
12 SYZ SN 3 RHA exc
EG-3
5 MET tho 7 ASP aus GRAVEL Type 1
4 ALP cae - Refer To Schedule PALMS
14 LIR JR
GB1 - Garden Type 1
GB1 - Refer To Schedule
EG-1 AG - Subsurface Drainage
AG
T1
2 ASP aus UP GB1
G1
10 ACA ste
2 AJU rep MATERIALS & FINISHES SCHEDULE
CODE / ITEM REQUIREMENTS
AG UP
1 ASP aus FENCING SPECIFIED EXISTING KERB DRAINAGE
12 LOM SHA 2 RHA exe BY 'ZEST' EG-2
3 VIO hed FENCING SPECIFIED BY 'ZEST' Garden Edge Type 1 190mm wide Concrete garden bed edge as a continuation of retaining wall.
AG
4 SYZ RES EG-3 8 AJU rep
AG
9 VIO hed (EG-1)
7 BAN SEN 6 PHI xan
5 LIR JR Garden Edge Type 2 100x38mm Treated pine garden edging surround with 500x38x38mm treated pine
T1
UP
10 ACA ste 8 NEO she 1 BAN int (EG-2) pegs at Nom.1200mm centres. Refer to detail and specification.
AG
5 AJU rep 1 ASP aus EXISTING TREE TO BE REMOVED Garden Edge Type 3 Aluminium Link Edge
15 DIC SF 8 VIO hed EXISTING TREE TO BE REMOVED (EG-3)
a ALC vin GRAVEL Type 1 (G1) 10-20mm dia Mary River Peble laid 150mm thick on compacted sub grade for
SERVICE AREAUP decking access to pool.
3 BAN BC Turf Type 1 (T1) A-Grade Buffalo 'Sir Walter' Laid as per detail shown on CD-201.
2 ALP cae
200 x 200 LANDSCAPE Turf Type 2 (T2) A-Grade Couch 'Wintergreen' Laid as per detail shown on CD-201.
SERVICE AREA PIT CONNECTED TO
STORM WATER Garden Bed Type 1 Internal grade typical, 300mm depth amended site or imported topsoil to
2 BAN BC UP
(GB1) specification, cover with 100mm thick Organic Forest Chip Mulch, refer to detail
T1
1 PAN tec CD-201.
10 CAR cla
PLANTING SCHEDULE
EG-2
5 SYZ RES
7 BAN SEN
MULCH TYPE 1 REFER TO SHCEDULE
AG
1 BAN int
UP
EXISTING TREE TO BE RETAINED
AG EG-3 EG-3 9 ASP aus
EG-3 G1 6 ALP cae
GB1
T2
7 DIC rep 6 ALP cae
RETAINING WALL
REFER TO ARCHITECT 16 SYZ RES 3 RHA exc 9 ACM AM 9 ACM AM 3 KNI RHP 3 SYZ RES
DRAWING 9 ALP cae 1 CYA coo 3 KNI RHP 3 KNI RHP 4 LIR JR
NOTE: Provide Subsurface drainage where indicated, and to rear of all retaining wall and any garden areas likely to hold water, connect
subsurface drainage to storm water.
-
NOOSA COUNCIL
APPROVED PLAN Revision Date Amendment Drawn Checked
APPROVAL ONLY
LANDSCAPE PLAN OPW21/0038 30 APR 2021 NOT FOR CONSTRUCTION
A
B
2021.02.01
2021.03.18
For Approval
Request for Information Response
XL
XL
CS
CS
CD-101 scale: 1:100@A1; 1:200@A3
DUPLEX - 75 SOUTHERN CROSS PARADE, SUNRISE BEACH
NORTH
Project No. 16261 Client: BLACK AND WHITE PROJECTS
Page 13
-
NOOSA COUNCIL
Notes: APPROVED PLAN REFER TO PLANTING PLANS FOR
Notes:
OPW21/0038 30 APR 2021
- Place the rootball on a firm base.
- Place the rootball on a firmed base to achieve required FSL. MULCH TYPE
- Thoroughly water the root ball immediately after planting.
- Thoroughly water the root ball immediately after planting. - Cultivate sides of excavated hole 50mm deep.
VARIES
- Number of stakes will vary with pot size. Refer plant schedule. - Do not disturb kerb, road pavement or road side drainage works. TOPSOIL AS SPECIFIED REFER TO PLANTING
- Cultivate sides of excavated hole 50mm. - Tease out roots on side of rootball when planting. PLANS FOR DEPTHS
- Ensure top of rootball is not buried; expose and set flush with finished level.
Set soil level at top of
200mm CULTIVATED SUBGRADE WHERE
200
rootball (at flare of trunk)
FALL PLANTING OCCURS ON GROUND
FALL
Pull away mulch 100mm CORRUGATED SLOTTED
from base of plant POLYETHYLENE PIPE WRAPPED IN
Hardwood Stake: FILTER CLOTH TO AS2439.1 CLOTH.
25x25x90mm Place 600mm FILTER CLOTH IS TO BE
50x50x2400 HW Timber stake: Form mulch berm NON-WOVEN NEEDLE-PUNCHED
into the ground. Do not FABRIC
Place 600mm into the ground. Do to the perimeter of
place through rootball.
not place through rootball. Secure the rootball 20MM DRAINAGE AGGREGATE AS
Secure with ties by looping PER SPECIFICATION. MINIMUM
in a figure eight pattern. with hessian ties by looping in a Install root barrier to 600mm 100MM DEPTH OF COVER OVER
figure eight pattern. depth where trees are within AGRICULTURAL PIPE.
Mulch: Pull away from 1m of hard infrastructure. GEOTEXTILE FABRIC TO
base of plant. SURROUND AND LINE TRENCH
Raise plant 20-30mm above Distance to local
Form an earthen basin top of kerb. authority
around base of plant. requirments - SUBSURFACE DRAINAGE
Do not excavate CD-200 1:10@A1, 1:20@A3
within 50mm of
edge restraint or
Topsoil blend pavement. 100
Top of Kerb
Fertiliser: Do not allow FSL Notes:
contact with roots. 1. Construction joints: Place at minimum 5m centres.
2. Tool joints: Make tool joint at equal distances from
50
300
Water retention additive both ends. Make joint at points of change in curvature/
2 direction. Joints to be at right angles to direction of
Topsoil blend 1 1 edge.
Mulch - refer to Specification.
1
- 140-300mm PLANTING Root barrier
Continuous extruded mowing
CD-200 1:10@A1, 1:20@A3 Bio-degradable Geo-fabric
strip. Profile as indicated
Water retention below.
additive
Turf - refer to Specification.
100mm drainage gravel in
Topsoil - refer to
heavy or poor draining soils. Connect drainage gravel Specification
to back of kerb, subsoil Cultivated subgrade - refer to
Incorporate slow release organic drainage where Specification.
fertilizer and water retention applicable
additives to backfill per Compacted subgrade to be
Manufacturer's recommendations Nom. 200mm thickness.
Existing subgrade
Notes:
- Place the rootball on a firm base.
- Thoroughly water the root ball immediately after planting.
- Cultivate sides of excavated hole 50mm deep.
- Do not disturb kerb, road pavement or road side drainage works.
- Tease out roots on side of rootball when planting.
- Ensure top of rootball is not buried; expose and set flush with finished level.
- STREET TREE PLANTING - EDGE TYPE 3 - EDGE TYPE 1
CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3
All trees to have 100% NATSPEC inspection prior to delivery to site Aluminium link garden edge In-situ concrete garden edge
FSL
Notes:
(X)
- All timber to be CCA pressure treated to
AS1604, Hazard 5, rough sawn pine. Timber edge
- All timber edges to be arissed to comply
Hardwood stake: Place 600mm with council standards.
into the ground. Do not place - All timber ends to have one coat of Stakes
through rootball. Secure with Cuprinol or equal prior to installation.
ties by looping in a figure eight - Stakes to be 400mm into ground at max.
1200mm centres, or as required to obtain Existing/compacted
pattern.
smooth curves. Top of stake to finish /subgrade/subase
Raise plant 50mm above 20mm below top of timber edge. Where
finished surface level. timber edges meet at corners provide
Mulch: Pull away from base double stakes.
of plant. - All fixings to be hot dipped galv.
Form an earthen basin - Leading edge is to be free of burrs and
around base of plant. FSL
splinters.
Mulch
- to 100mm depth
Turf as specified
TIMBER EDGE STAKES (X) = Height above
Topsoil blend Soil blend or site topsoil Topsoil 38 50 finished surface level FIXINGS
min 300
- to 300mm depth - to 100mm depth 50mm Bugle Headed
Water retention additive FLUSH
Batten Screws.
Cultivate subgrade
100
1 - to 150mm depth 20mm 75mm Bugle Headed
Fertiliser: Do not allow
fertiliser to come in 1 Cultivated subgrade Batten Screws.
Existing subgrade 100mm
- to 150mm depth 100mm Bugle Headed
contact with roots.
150mm Batten screws.
width (w) 100x38mm
10 - 20mm Drainage gravel
2xw
50x50mm
- 45-200ltr PLANTING - GARDEN BED PROFILE - TURF PROFILE - EDGE TYPE 2
CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3 CD-200 1:5@A1, 1:10@A3 CD-200 1:5@A1, 1:10@A3
Timber garden edge
Revision Date Amendment Drawn Checked
APPROVAL ONLY
CONSTRUCTION DETAILS NOT FOR CONSTRUCTION
A
B
2021.02.01
2021.03.18
For Approval
Request for Information Response
XL
XL
CS
CS
CD-200 scale as noted
DUPLEX - 75 SOUTHERN CROSS PARADE, SUNRISE BEACH
Project No. 16261 Client: BLACK AND WHITE PROJECTS
Page 14
-
NOOSA COUNCIL
APPROVED DOCUMENT
OPW21/0038 30 APR 2021
ARBORICULTURAL REPORT
75 Southern Cross Parade, Sunrise Beach
Commissioned by Jason Baron (Black & White Projects)
Prepared by Brendan Martin
Director/Principal Consulting Arborist
March 18, 2021
PO BOX 304 EUDLO Q 4554
Ph: 7 54 459921 Mobile: 0412 586131 Fax: 7 54 789160
[email protected] www.treesolutions.com.au
Dip.Arb/Hort, MAA, MISA, MQAA
Page 15
TABLE OF CONTENTS
1. 1. Copyright Page 3
2. Brief Page 4
3. 3. Findings Page 5
4. 4. Images Page 5 - 7
5. 5. Tree Protection Page 8 - 9
6. Disclaimer Page 10
7. Bibliography Page 11
Page 2 of 11
Page 16
1. COPYRIGHT
Produced by: Tree Solutions Australia P/L
Prepared by: Brendan Martin (Dip.Arb/Hort, MAA, MISA, MQAA)
Commercial in Confidence
All the information contained in this document is provided in strict commercial confidence. It
shall not be disclosed to any third party or reproduced in any way without the express written
consent of Tree Solutions Australia.
Copyright
© Tree Solutions Australia P/L
Page 3 of 11
Page 17
2. BRIEF
Terms of Reference
Request by Jason Baron (Director – Black & White Projects) to provide an Arboricultural Report as per
Council conditions as detailed below.
Provide an arborist report that addresses the retention of the existing trees (suggest
addressing the relocation of existing palms also) The report must be site specific and
include recommendations for the works and methodology.
Procedure
A ground site assessment was conducted on March 11, 2021.
2.0 Site Map
Lillypilly
Alexandra
Palms
Page 4 of 11
Page 18
3. FINDINGS
3.0 Site trees for protection are two young “Alexandra Palms” (Arcontophoenix aleaxandrae) and a
young “Weeping Lillypilly” (Syzygium luehmannii) both are in excellent condition.
3.1 All other vegetation will be compromised with construction plans and will require removal. There
are no trees of significance that require removal.
3.2 The calculated TPZ for the “Alexandra Palms” is approx. 2 metres and the TPZ for the “Lillypilly” is
approx. 2.5 metres. This means that no works of any kind can be undertaken within this zone
unless the Project Arborist is involved.
3.3 TPZ’s should be determined and clearly marked out prior to any tree removal or site works. ATF
fencing or similar should be set out to limit root damage of the protected tree.
Tree removals must be undertaken with care and root balls should be stump ground when close
to protected trees. Any works within TPZ’s should be supervised by the Project Arborist.
3.4 All retained trees require mulching of the TPZ’s using good quality forest mulch. Root pruning
using Air spade or a vacuum excavation process is recommended for any works within 1 metre of
TPZ’s.
4. IMAGES
Page 5 of 11
Page 19
Alexandra
Palms
Page 6 of 11
[OCR of page images]
Alexandra
Palms
Page 6 of 11
Page 20
Lillypilly
Page 7 of 11
[OCR of page images]
Page 7 of 11
Page 21
5. TREE PROTECTION
TREE PROTECTION – AS4970 -2009 ‘Protection of trees on development sites’
The tree protection zone (TPZ) is the principal method of protecting trees on development sites. It is an
area set aside from disturbance from construction works, enabling sufficient parts of a tree and its
growing environment to be undisturbed, so that the tree will remain stable and viable.
Root protection zone (RPZ)
A specified area below ground and at a given distance from the trunk set aside for the protection of tree
roots to provide for the viability and stability of a tree to be retained where it is potentially subject to
damage by development.
NOTE: Establishment of these areas may include root investigation and mapping, root pruning and
installation of root barriers or other protection measures at the edge of the RPZ to prevent conflict
between roots and works.
Structural root zone (SRZ)
The area around the base of a tree required for the tree’s stability in the ground. The woody root
growth and soil cohesion in this area are necessary to hold the tree upright, so the entire profile (depth)
of the root zone is included in the structural root zone. The SRZ is nominally circular with the trunk at its
centre and is expressed by its radius in metres.
This zone considers a tree’s structural stability only, not the root zone required for a tree’s vigour and
long-term viability, which will usually be a much larger area.
Tree
Long lived woody perennial plant greater than (or usually greater than) 3 m in height with one or
relatively few main stems or trunks.
Tree protection zone (TPZ)
The combined area of the root protection zone (RPZ) and crown protection zone (CPZ) as an area set
aside for the protection of a tree.
DETERMINING THE TREE PROTECTION ZONE
Trees should be physically protected at all stages of development. The tree protection zone (TPZ) is
determined by a combination of the areas of primarily the root protection zone (RPZ) and to a lesser
extent, the crown protection zone (CPZ) considering the proposed construction methods and structures.
These zones are illustrated in Figure 1.
The determination of the tree protection zone should involve—
(a) Identifying an area of ground around the tree that should remain undisturbed (root protection zone)
and ensuring that it is feasible to maintain protective measures undisturbed around all such areas
throughout the construction period (see Clause 1.4.6); and
(b) Identifying an area around the tree crown that should remain undisturbed (crown protection zone)
and ensuring that it is feasible to maintain protective measures undisturbed around all such areas
throughout the construction period (see Clause 1.4.1).
The TPZ is plotted to include the RPZ and CPZ.
A site plan showing TPZs should be prepared.
Page 8 of 11
Page 22
DETERMINING THE ROOT PROTECTION ZONE
The purpose of the RPZ is to protect the area of roots required to maintain the tree’s vigour and stability
during the development process and into the long term. The RPZ is calculated for each tree based on its
age class and vigour class. Each tree may be fenced off to form an enclosure with the tree at the centre,
or an existing structure may be utilized, being retained such as a wall or fence.
Table 2 provides the means for determining RPZ based on the age and vigour of the tree, as assessed by
the project arborist.
The minimum radius of the RPZ is determined by multiplying the DBH, in metres, by the appropriate
multiplier, given in Column 3 of Table 2.
TABLE 2
CALCULATING THE MINIMUM RPZ
(EXCEPT FOR PALMS, CYCADS AND TREE FERNS)
Tree Age Tree Vigour RPZ radius (M)
Young trees (age less than 20% of life Good Vigour 6 x DBH
expectancy in situ)
Poor Vigour 9 x DBH
Mature trees (age between 20% and Good Vigour 9 x DBH
80% of life expectancy in situ)
Poor Vigour 12 x DBH
Over mature trees (age greater than Good Vigour 12 x DBH
80% of life expectancy in
situ) Poor Vigour 15 x DBH
NOTES:
1. Radial distances are measured from the centre of the stem at ground level.
2. The RPZ distances in this table are based on a good species tolerance to site disturbance. There
are no scientific data of tree tolerances for Australian conditions.
3. No tree should have RPZ less than 2 m or greater than 15 m. The RPZ of palms and other
monocots, cycads and tree ferns must be 1 m outside the dripline edge of the crown.
Page 9 of 11
Page 23
6. DISCLAIMER
This information contained in this report has been prepared on an independent basis, free of any bias and
represents the honest opinion of the consulting arborist. All data is based on visual inspection of the tree/s and
its/their location at the time of writing, unless otherwise stated, and contains opinions, advice and
recommendations based on information and data gathered from site inspections carried out by the author and
information supplied by the Client. All information received from the Client shall be deemed to be true, accurate
and up to date.
To the extent permitted by law, you agree Tree Solutions Australia Pty Ltd is not liable to you or any person or
entity for any loss of or damage caused or alleged to have been caused (including loss or damage resulting from
negligence) either directly or indirectly, by your use of the information made available in this report. In no event
will the author be liable to you for any lost revenue or profits, or for special, indirect, consequential or incidental
damage (however caused and regardless of the theory of liability) arising out of or related to your use of that
information, even if the author has been advised of the possibility of such a loss or damage.
This report is subject to copyright laws and no part may be reproduced or used without the written permission of
Tree Solutions Australia Pty Ltd nor will any responsibility be accepted for unauthorised or partial use of this
report.
Unless otherwise stated this report cannot be used within a court of law or any legal situation without the prior
consent of Tree Solutions Australia Pty Ltd. The author shall not be required to give testimony or to attend court
by reason of this report unless subsequent contractual arrangements have been made.
The information contained in this report refers only to the trees that were inspected as per request and reflects
the condition of the trees at the time of the inspection. There is no warranty or guarantee, expressed or implied,
that the problems or deficiencies of the plants or property in question may not arise in the future. Likewise,
remedial treatments cannot be guaranteed.
Arboriculturalists cannot detect every condition that could possibly lead to the structural failure of a tree. Trees
are living organisms that fail in ways we do not fully understand. Conditions are often hidden within trees and
below ground.
This report does not take into consideration the possibility of extreme weather or other events over which Tree
Solutions Australia Pty Ltd has no control.
Treatment, pruning and removal of trees may involve considerations beyond the scope of the Arboriculturalists
services, such as property boundaries and ownership, disputes between neighbours, sight lines, landlord-tenant
matters and other related issues. Such issues cannot be taken into account unless complete and accurate
information is given nor can any responsibility be accepted for the authorization or non-authorization of any
recommended treatment or remedial measure.
Arboriculturalists are tree specialists who use their education, knowledge, training and experience to examine
trees, recommend measures to enhance the beauty and health of trees and attempt to reduce the risk of living
near trees. Safety, the trees survival requirements and wildlife habitat needs are criteria considered. Trees can be
managed, but they cannot be controlled. To live or work near a tree involves some degree of risk. The only way to
eliminate all risks associated with a tree is to eliminate the tree.
Page 10 of 11
Page 24
7. BIBLIOGRAPHY
VTA (Visual Tree Assessment – Prof. Dr. Claus Mattheck 1994) based on
‘The Body Language of Trees’.
An Evaluation of Hazard Trees (ISA – Matheny & Clark 1994).
Dictionary for Managing Trees in Urban Environments – Danny B Draper and
Peter A Richards
Modern Arboriculture and a New Tree Biology by Dr Alex Shigo.
Arboriculture ‘Integrated Management of Landscape trees, shrubs and vines –
Richard W. Harris
AS 4373 – 2007 (Australian Standards – Pruning Of Amenity Trees)
AS 4970 – 2009 (Australian Standards – Protection of Trees on Development
Sites)
Page 11 of 11