Original source · versioned page text
Approved Plans OPW21-0038
The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn -
NOOSA COUNCIL
Notes: APPROVED PLAN REFER TO PLANTING PLANS FOR
Notes:
OPW21/0038 30 APR 2021
- Place the rootball on a firm base.
- Place the rootball on a firmed base to achieve required FSL. MULCH TYPE
- Thoroughly water the root ball immediately after planting.
- Thoroughly water the root ball immediately after planting. - Cultivate sides of excavated hole 50mm deep.
VARIES
- Number of stakes will vary with pot size. Refer plant schedule. - Do not disturb kerb, road pavement or road side drainage works. TOPSOIL AS SPECIFIED REFER TO PLANTING
- Cultivate sides of excavated hole 50mm. - Tease out roots on side of rootball when planting. PLANS FOR DEPTHS
- Ensure top of rootball is not buried; expose and set flush with finished level.
Set soil level at top of
200mm CULTIVATED SUBGRADE WHERE
200
rootball (at flare of trunk)
FALL PLANTING OCCURS ON GROUND
FALL
Pull away mulch 100mm CORRUGATED SLOTTED
from base of plant POLYETHYLENE PIPE WRAPPED IN
Hardwood Stake: FILTER CLOTH TO AS2439.1 CLOTH.
25x25x90mm Place 600mm FILTER CLOTH IS TO BE
50x50x2400 HW Timber stake: Form mulch berm NON-WOVEN NEEDLE-PUNCHED
into the ground. Do not FABRIC
Place 600mm into the ground. Do to the perimeter of
place through rootball.
not place through rootball. Secure the rootball 20MM DRAINAGE AGGREGATE AS
Secure with ties by looping PER SPECIFICATION. MINIMUM
in a figure eight pattern. with hessian ties by looping in a Install root barrier to 600mm 100MM DEPTH OF COVER OVER
figure eight pattern. depth where trees are within AGRICULTURAL PIPE.
Mulch: Pull away from 1m of hard infrastructure. GEOTEXTILE FABRIC TO
base of plant. SURROUND AND LINE TRENCH
Raise plant 20-30mm above Distance to local
Form an earthen basin top of kerb. authority
around base of plant. requirments - SUBSURFACE DRAINAGE
Do not excavate CD-200 1:10@A1, 1:20@A3
within 50mm of
edge restraint or
Topsoil blend pavement. 100
Top of Kerb
Fertiliser: Do not allow FSL Notes:
contact with roots. 1. Construction joints: Place at minimum 5m centres.
2. Tool joints: Make tool joint at equal distances from
50
300
Water retention additive both ends. Make joint at points of change in curvature/
2 direction. Joints to be at right angles to direction of
Topsoil blend 1 1 edge.
Mulch - refer to Specification.
1
- 140-300mm PLANTING Root barrier
Continuous extruded mowing
CD-200 1:10@A1, 1:20@A3 Bio-degradable Geo-fabric
strip. Profile as indicated
Water retention below.
additive
Turf - refer to Specification.
100mm drainage gravel in
Topsoil - refer to
heavy or poor draining soils. Connect drainage gravel Specification
to back of kerb, subsoil Cultivated subgrade - refer to
Incorporate slow release organic drainage where Specification.
fertilizer and water retention applicable
additives to backfill per Compacted subgrade to be
Manufacturer's recommendations Nom. 200mm thickness.
Existing subgrade
Notes:
- Place the rootball on a firm base.
- Thoroughly water the root ball immediately after planting.
- Cultivate sides of excavated hole 50mm deep.
- Do not disturb kerb, road pavement or road side drainage works.
- Tease out roots on side of rootball when planting.
- Ensure top of rootball is not buried; expose and set flush with finished level.
- STREET TREE PLANTING - EDGE TYPE 3 - EDGE TYPE 1
CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3
All trees to have 100% NATSPEC inspection prior to delivery to site Aluminium link garden edge In-situ concrete garden edge
FSL
Notes:
(X)
- All timber to be CCA pressure treated to
AS1604, Hazard 5, rough sawn pine. Timber edge
- All timber edges to be arissed to comply
Hardwood stake: Place 600mm with council standards.
into the ground. Do not place - All timber ends to have one coat of Stakes
through rootball. Secure with Cuprinol or equal prior to installation.
ties by looping in a figure eight - Stakes to be 400mm into ground at max.
1200mm centres, or as required to obtain Existing/compacted
pattern.
smooth curves. Top of stake to finish /subgrade/subase
Raise plant 50mm above 20mm below top of timber edge. Where
finished surface level. timber edges meet at corners provide
Mulch: Pull away from base double stakes.
of plant. - All fixings to be hot dipped galv.
Form an earthen basin - Leading edge is to be free of burrs and
around base of plant. FSL
splinters.
Mulch
- to 100mm depth
Turf as specified
TIMBER EDGE STAKES (X) = Height above
Topsoil blend Soil blend or site topsoil Topsoil 38 50 finished surface level FIXINGS
min 300
- to 300mm depth - to 100mm depth 50mm Bugle Headed
Water retention additive FLUSH
Batten Screws.
Cultivate subgrade
100
1 - to 150mm depth 20mm 75mm Bugle Headed
Fertiliser: Do not allow
fertiliser to come in 1 Cultivated subgrade Batten Screws.
Existing subgrade 100mm
- to 150mm depth 100mm Bugle Headed
contact with roots.
150mm Batten screws.
width (w) 100x38mm
10 - 20mm Drainage gravel
2xw
50x50mm
- 45-200ltr PLANTING - GARDEN BED PROFILE - TURF PROFILE - EDGE TYPE 2
CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3 CD-200 1:5@A1, 1:10@A3 CD-200 1:5@A1, 1:10@A3
Timber garden edge
Revision Date Amendment Drawn Checked
APPROVAL ONLY
CONSTRUCTION DETAILS NOT FOR CONSTRUCTION
A
B
2021.02.01
2021.03.18
For Approval
Request for Information Response
XL
XL
CS
CS
CD-200 scale as noted
DUPLEX - 75 SOUTHERN CROSS PARADE, SUNRISE BEACH
Project No. 16261 Client: BLACK AND WHITE PROJECTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.