40.   Prior to the commencement of use, provide certification from a suitably qualified person that
      all works have been undertaken in accordance with the Acid Sulfate Soil Management Plan.
      Preparation of a Preliminary Construction Management Plan
41.   A preliminary Construction Management Plan must be submitted with the Operational Works
      application and must address the following:
      a.   Traffic management during all aspects of the construction phase including:
            i.   Traffic Management Control Plan in accordance with the Manual of Uniform
                 Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                 control measures prior to construction.
      b.   Maintenance of safe pedestrian access for the areas affected by the works during and
           after daily construction has ceased.
      c.   Provision for worker car parking.
      d.   Maintenance and protection of water quality and existing drainage lines through the
           construction site, through the implementation of appropriate erosion and sediment
           control measures.
      e.   Works programme identifying key components of the works and their respective
           durations.
      f.   Include signage in prominent locations on the boundaries of the site advising of the
           proposed development, the expected time frames and the site contact details.
      g.   Identification of complaint management procedures including:
            i.   Contact details for the on-site manager.
      h.   Dispute resolution procedures.
      i.   If the proposed earthworks exceed 1000m3, provide details on the location of external
           fill sites/sources, the haulage route, type of vehicle to be utilised during filling
           operations and frequency of usage. NB any damage to the existing road system as a
           result of haulage operations shall be fully repaired at the applicant’s expense.
      j.   It is acknowledged that the preliminary Construction Management Plan will be a draft
           document requiring finalisation upon appointment of the Principal Contractor employed
           to construct the works and a final document will be required to be submitted at the Pre-
           Start Meeting for the project.
Log in to download the original file

ATTACHMENT 1 - MCU220051 – PROPOSED CONDITIONS.pdf · 101 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.