Original source · versioned page text
Compiled Approved Plans - 51987.2885.3
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn WINTER SUN POSITION
9:00 AM 12:00 PM 4:00 PM
NOOSAVILLE NOOSAVILLE NOOSAVILLE
EXISTING SITE IMAGES July 1 July 1 July 1
TOW: 3.710
N
N
N
SUMMER SUN POSITION
EXISTING PAINTED TIMBER DECK
FSL: 2.000
TOW: 3.710 4:00 PM
7120
NOOSAVILLE
January 1
EXISTING 1710mm HIGH
RENDERED & PAINTED MASONRY
N
EXISTING POOL PUMP
BLOCKWORK WALL
1855 EXISTING FRAMELESS GLASS
POOL FENCE & GATE
12:00 PM
TBM: 2000 ASSUMED NOOSAVILLE
STEP 1
A/C A/C January 1
TIMBER BATTEN FENCE
-Batten Size: 40x19mm TOW: 3.740 FSL: 1.600
-Post Size: 70x90mm
STEP 1
EXISTING EXPOSED AGGREGATE
1105
RL: 1.750
CONCRETE STEP EXISTING 400x400mm
N
RL: 1.980 CONCRETE PAVERS
9:00 AM
RL: 2.120
NOOSAVILLE
EXISTING 2110mm HIGH January 1
EXISTING BENCH SEAT AND STORAGE
RENDERED & PAINTED MASONRY
TOW: 3.740 BLOCKWORK WALL
EXISTING GARDEN TOW: 3.710
FSL: 1.600
N
EXISTING 2100x2300mm IN-GROUND SPA
TO
W
:3
EXISTING 1900mm HIGH
.5
0 0
RENDERED & PAINTED MASONRY
BLOCKWORK WALL
DECORATIVE PEBBLE IN PAVEMENT
For Development Application Only
- Revision Description Date By. Project Address: Sheet:
Scale: 1:75
APPROVED PLAN 0418 425 231
1/15 Howard Street, Noosaville, QLD, 4566 L01 A
5987.2885.3 A.B.N. 45089234363
Suite 7/10 Thomas St,
Client Name: Design:
NOOSA COUNCIL
Noosaville, QLD, 4566
[email protected] Nicole Tooth
27 JANUARY 2022 www.templeoutdoor.com.au
Proud member of:
Landscape Queensland Date: 19/5/21 Project No: 000109 Drawing Stage: For D.A.
AILDM
Noosa Property Hub
A INITIAL SUBMISSION 21/5/21 JB Council: Noosa Drawn By: JB Project Revision:
This design is covered by copyright & may not be reproduced without written permission from the author. The drawing refers to the overall design intent and may require structural engineers certification for construction elements. Intent of work is only shown and these drawings do not imply tactic approval for their structural integrity. No responsibility can be taken for construction, therefore any construction
© 2020 TEMPLE outdoor design & living works must be approved by an engineer and or a registered building certifier. TEMPLE Outdoor Design & Living recommends to use only licensed contractors. Check all measurements onsite prior to quatation or construction. Dial before you dig www.1100.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.