Original source · versioned page text
Transport management plan
Attached to the e-mail FW MCU220086 - Council information request.msg.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn The following pinch points have been identified along this section of the route:
Pinch Points Procedures
Left turn from Hay Street onto Gympie Street - Pilot 1 & 2 to guide the movement
from the front and rear respectively.
- Pilot 2 will guide the movement from
behind ensuring that there is sufficient
height clearance between the load
and the power lines.
- First Pilot and Officer to hold up traffic
while load turns left onto Gympie
Street. Once load has passed pilot to
follow after. Traffic will be able to flow
again.
- Sign has been noted as a hazard. It
can be removed and reinstanted by
QHR back up vehicle. Spotters to
ensure no damage to signs or load.
Roundabout turning left onto Moorindil Street - Movement will travel at a height of
1.7m high if necessary, this will allow
load to travel safety.
- Median strip/signs are noted as a
hazard, movement will proceed with
caution when passing. If necessary,
sign can be removed for load to pass
through safely.
- QHR backup vehicle will assist with
the load travelling through to ensure
no obstruction to signs.
- First Pilot and Officer to hold up traffic
while load turns left onto Moorindil
Street. Once load has passed pilot to
follow after. Traffic will be able to flow
again.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.