Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Transport management plan

Attached to the e-mail FW MCU220086 - Council information request.msg.

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Left turn from Butler Street onto McKinnon Drive       -       Movement will travel at a height of
                                                               1.7m high if necessary, this will allow
                                                               load to travel safety.

                                                       -       Median strip/signs are noted as a
                                                               hazard, movement will proceed with
                                                               caution when passing. If necessary,
                                                               sign can be removed for load to pass
                                                               through safely.

                                                       -       QHR backup vehicle will assist with
                                                               the load travelling through to ensure
                                                               no obstruction to signs.

                                                           -    First Pilot and Officer to hold up
                                                                traffic while load turns left onto
                                                                McKinnon Drive. Once load has
                                                                passed pilot to follow after. Traffic will
                                                                be able to flow again.
Left turn from McKinnon Drive onto Louis Bazzo Drive   -       Pilot 1 & 2 to guide the movement
                                                               from the front and rear respectively.

                                                       -       Pilot 2 will guide the movement from
                                                               behind ensuring that there is sufficient
                                                               height clearance between the load
                                                               and the power lines.

                                                       -       First Pilot and Officer to hold up traffic
                                                               while load turns left onto Louis Bazzo
                                                               Drive. Once load has passed pilot to
                                                               follow after. Traffic will be able to flow
                                                               again.




Right turn from Louis Bazzo Drive onto McCabes Road    -       Pilot 1 & 2 to guide the movement
                                                               from the front and rear respectively.

                                                       -       Pilot 2 will guide the movement from
                                                               behind ensuring that there is sufficient
                                                               height clearance between the load
                                                               and the power lines.

                                                       -       First Pilot and Officer to hold up traffic
                                                               while load turns right onto McCabes
                                                               Road. Once load has passed pilot to
                                                               follow after. Traffic will be able to flow
                                                               again.
Log in to download the original file

Transport management plan.pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.