Original source · versioned page text
20210041 27 Bottlebrush Ave Stormwater
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
Figure 2.1 - Site Locality Plan (Noosa Council Intramaps, 2021)
2. 2. E X I S T I N G D R A I N A G E P A T T E R N S
Data obtained from the detailed survey and Council’s interactive mapping indicates that the
nearest stormwater drainage is a kerb inlet pit immediately in front of the subject site.
No other stormwater infrastructure has been identified in the site detailed survey and no
kerb adaptors are present within the road frontage of the property. It is expected that both
roof water and surface run-off from the site flow overland toward the road collection system
where it is conveyed via the kerb and gutter into the inlet pit
Due to the sloping nature of the lot, surface run-off from upstream catchments is expected
to flow through the site and eventually be collected within the Bottlebrush Avenue street
drainage system.
Page 2 of 9
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.