Figure 3.2 – DRAINS Pre-development catchments
Figure 3.3 – DRAINS Post-development catchments
The results of the modelling against the range of design storms for the development under
the existing and proposed development conditions are shown in Table 3.1 Existing and
proposed unmitigated site peak discharge rates.
Table 3.1 Existing and proposed unmitigated site peak discharge rates
27 Bottlebrush Avenue Total
A.E.P Qexisting Qproposed Qchange Qchange
(m³/s) (m³/s) (m³/s) (%)
1EY 0.011 0.015 0.004 36%
50% 0.013 0.017 0.004 31%
20% 0.019 0.024 0.005 26%
10% 0.023 0.028 0.005 22%
5% 0.029 0.033 0.004 14%
2% 0.033 0.039 0.006 18%
1% 0.036 0.043 0.007 19%
As the site has increased the total peak flows from the site, attenuation storage will be
required to mitigate the outflows to ensure that the development does not exceed the
predevelopment levels.
To determine the attenuation required, the model for the developed site was updated to
include a proposed detention tank to be provided for the development. An iterative sizing
process was used to determine both the sizing of the detention storage and the low flow
outlet orifice that would attain the required peak flow rates from the site. Based on this
Page 4 of 9
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.