3. 2. E R O S I O N A N D S E D I M E N T C O N T R O L M E A S U R E S
During construction, it is necessary to manage stormwater run-off to avoid potential
contamination of downstream waterways and infrastructure from sediments and other
pollutants from the site.
Best practice erosion and sediment controls shall be installed to minimise the discharge of
potential contaminants from the site, in accordance with the objectives of Appendix 2 of the
SPP (DERM, July 2017) shown below in Figure 3.4.
Figure 3.4 SPP 2017 Construction Phase Stormwater Management Design Objectives
Appendix A Proposed Development Plans contains the site-specific erosion and sediment
control (ESC) Plan proposed for the development. The measures suitable for the site
include:
1. Sediment fencing installed along the downstream boundaries of the site.
2. Diversion of upstream run-off around exposed earthworks through the
implementation of a catch drain around the work area until the stormwater drainage
line is installed
3. A shakedown area is to be installed at the construction site entry/exit points.
Page 6 of 9
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.