Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

20210041 27 Bottlebrush Ave Stormwater

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

                    •   The development will increase the impervious area by approximately 167m²
                        resulting in an increase to peak runoff from the site. This increase is to be mitigated
                        with the provision of a 5,000L underground stormwater detention tank with 60mm
                        low flow orifice outlet (refer Section 3.1).

                    •   The stormwater run-off from the site will be discharged into the kerb inlet pit located
                        in front of the site.




                                                                                                       Page 8 of 9
P +61 7 5211 1003            A 37 Mary St, Noosaville Qld 4566     E [email protected]        recorconsulting.com
Log in to download the original file

20210041 27 Bottlebrush Ave Stormwater.pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.