Original source · versioned page text
20210041 27 Bottlebrush Ave Stormwater
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
• The development will increase the impervious area by approximately 167m²
resulting in an increase to peak runoff from the site. This increase is to be mitigated
with the provision of a 5,000L underground stormwater detention tank with 60mm
low flow orifice outlet (refer Section 3.1).
• The stormwater run-off from the site will be discharged into the kerb inlet pit located
in front of the site.
Page 8 of 9
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.