2014-12-09 Planning & Organisation Committee Agenda

of 134

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                         AGENDA


  Planning & Organisation
    Committee Meeting


            Tuesday, 9 December 2014


                   commencing at 1.30pm
          Council Chambers, 9 Pelican Street, Tewantin



Committee: Crs Frank Wilkie (Chair), Noel Playford, Joe Jurisevic, Tony Wellington
Log in to download the original file

2014-12-09 Planning & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 85 (of 134)

Section 2

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA              9 DECEMBER 2014


TABLE OF CONTENTS

ITEM                                                                        PAGE
ATTENDANCE & APOLOGIES                                                         -
PRESENTATIONS                                                                  -
PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS                                   3
DA Planning & Environment                                                      3
1      DEVELOPMENT APPLICATION FOR RECONFIGURATION OF 3 LOTS INTO 17
       LOTS SITUATED AT 55 LAKE MACDONALD DRIVE, COOROY - REC13/0146           3
2      DEVELOPMENT APPLICATION FOR RECONFIGURATION OF 2 LOTS INTO 6
       LOTS SITUATED AT 1-11 WILGEE COURT COOROY - REC14/0008                 22
3      DEVELOPMENT APPLICATION FOR RECONFIGURATION OF 2 LOTS INTO 6
       LOTS PLUS 1 PARK LOT SITUATED AT 1 - 11 WILGEE COURT, COOROY -
       REC14/0009                                                             39
4      COMBINED DEVELOPMENT APPLICATION REC13/0148 & MCU13/0226 FOR
       RECONFIGURING A LOT (2 INTO 25 LOTS & PARK) AND A S242 PRELIMINARY
       APPROVAL FOR DETACHED HOUSING IN THE COMMUNITY SERVICES ZONE
       AT PEARSONS RD AND 55 LAKE MACDONALD DRIVE, COOROY                     57
5      DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR AN
       UNDEFINED USE - TEMPORARY SHORT-TERM SELF-CONTAINED RV STOP
       AT 154 HOLTS ROAD, COOROY - MCU14/0060                                 78
6      DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR AN
       INDUSTRIAL BUSINESS - TYPE 2 PRODUCTION, ALTERATION, REPACKAGING
       & REPAIRING (SOFT DRINK FACTORY) AT 271 LAKE MACDONALD DRIVE,
       LAKE MACDONALD - MCU14/0073                                            92
7      DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR OPEN
       SPACE TYPE 1 - SPORT & RECREATION (EXPANSION OF NOOSA PAR 3
       GOLF COURSE) AT 2 & 16 GOLDBERG COURT, NOOSAVILLE - MCU14/0068        114
CORPORATE SERVICES DEPARTMENT REPORTS                                        124
Procurement and Fleet                                                        124
8      INDICATIVE COST REDUCTION FOR STREETLIGHT NETWORK CHARGES             124
Property and Facilities                                                      126
9      FEES AND CHARGES UPDATE - NOOSA HOLIDAY PARKS                         126
EXECUTIVE OFFICE REPORTS                                                     130
Community Engagement                                                         130
10     COMMUNITY JURY PROJECT                                                130
Executive Support                                                            133
11     CHANGE OF VENUE FOR COUNCIL MEETINGS - 2015                           133
CLOSED SESSION                                                           -



                                                                   Page 2 of 134

Section 3

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                               9 DECEMBER 2014



PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS
(Planning & Development Sections only)

DA Planning & Environment
1                        DEVELOPMENT APPLICATION FOR RECONFIGURATION OF 3 LOTS INTO 17 LOTS
                         SITUATED AT 55 LAKE MACDONALD DRIVE, COOROY - REC13/0146
OCUMENT IN FOR MATI ON




Author                           Development Planner, Glen Conforti
                                 Planning & Infrastructure Department

Index                            ECM/ Application/ REC13/0146

Attachments                      1.   Proposal Plans



         APPLICATION DETAILS
                                             Valkev Pty Ltd
         Applicant
                                             Development Permit for Reconfiguration of a Lot (3 lots into 17)
         Proposal
                                             21 November 2013
         Properly Made Date
                                             18 December 2013
         Information Request Date
                                             6 June 2014
         Information Response Date
                                             18 December 2014
         Decision Due Date
                                             Not Applicable
         Number of Submissions


         PROPERTY DETAILS

         Property Address                    55 Lake Macdonald Drive, Cooroy

         RP Description                      Lot’s 136 & Lot 137 MCH 978 & Lot 2 RP 173883

         Land Area                           6.04ha (2.41ha, 2.02ha and 1.61ha)

         Existing Use of Land                Vacant


         STATUTORY DETAILS

         SEQRP Designation                   Urban Footprint
                                             Cooroy and Lake Macdonald
         Locality
                                             Detached Housing Zone
         Zone
                                             Biodiversity Overlay – Riparian Buffer
         Overlays
                                             Cooroy and Lake Macdonald
         Assessment Type



                                                                                                     Page 3 of 134

Section 4

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              9 DECEMBER 2014


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 9 December 2014 regarding Application No. REC13/0146 for a
Development Permit for Reconfiguration of a lot (3 lots into 17 lots) situated at 55 Lake
Macdonald Drive, Cooroy and:
A.   Grant a Preliminary Approval in accordance with the following conditions:
     PLANNING
     Preliminary Approval
     1.   Prior to the issue of a Development Permit a revised flood strategy must be provided.
          The flood strategy must demonstrate a non-worsening at the site’s boundaries for
          rain events up to and including the 1%AEP based on the following:
          a.    conventional bioretention/detention for the developed portion of the site. The
                flood strategy must not rely upon increasing floodplain roughness to achieve
                flood storage requirements
          b.    modified flood plain storage to offset any impacts created by vegetation
                rehabilitation and restoration of the western tributary
          c.    works in the tributary must not include extensive re-profiling and/or armouring of
                the existing watercourse.
     When Conditions Must Be Complied With
     2.   Unless otherwise stated, all works required by the conditions of this Decision Notice
          must be completed prior to Council endorsement of the Plan of Survey.
     Approved Plans
     3.   Development undertaken in accordance with this approval must generally comply
          with the approved plans of development. The approved plans are listed in the
          following table unless otherwise amended by these conditions.

           Plan No.          Rev.   Plan, prepared by                              Date
           10-3032AP5B              Plan of Lot Reconfiguration of Lot 5 on        02-07-14
                                    SP266731 & Parts of Lot 137 on MCH978 &
                                    Lot 2 on RP173883 (Stage 3)
           1225-89           A      Revegetation & Rehabilitation Management       1 October 2014
                                    Plan – Eastern Tributary Stage 5 & 6 and as
                                    annotated by Council
     4.   All lot numbering on the subdivision plan to be submitted to Council for compliance
          assessment must remain as shown on the Approved Plans.
     5.   The development must be undertaken and operated in a manner that causes no
          detrimental effect upon the amenity of the neighbourhood by reason of the creation of
          excessive noise, lighting nuisance or other emissions.
     Road & Park Names
     6.   The proposed names of roads and parks must be lodged with the application for a
          Development Permit for Operational Works. Names are to be:
          a.    Relevant to Australian, preferably local, history ,flora, fauna, culture, landscape
                or physical characteristics;




                                                                                    Page 4 of 134

Section 5

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014




          b.   If used, personal names should commemorate persons who have contributed
               significantly to the development of the region; demonstrated outstanding levels
               of civic service; or achieved role-model status in the wider community or
               donated property or funds for community benefit; and be recognised in
               memoriam;
          c.   Park names should be unique within the locality;
          d.   Approval will not be given to a name that may construed as advertising, is more
               than one word, understanding that a geographic relationship such as Cooroy
               Mountain is permissible; is insensitive to diverse cultures and does not accord
               with community standards; and is not concise, easy to pronounce and spell and
               be without accent marks, apostrophes or hyphens.
    7.    All street signs on new roads (public and private) and parks must be erected prior to
          works being accepted on maintenance.
    Boundary Encroachments
    8.    Certification must be submitted to Council from a Licensed Surveyor which certifies
          that:
          a.   all constructed access and roadworks (including associated fill batters and
               retaining walls) are fully contained within a dedicated reserve or registered
               easement
          b.   all utility services and connections (eg. electricity, telecommunications, water,
               sewerage) are wholly located within the lot they serve or alternatively included
               within an easement
          c.   all retaining walls and structures are fully contained within the lot they retain
          d.   any fill, including fill batters, are wholly contained within the subject site and not
               on adjacent properties
    Water & Sewer Connections
    9.    An underground connection to reticulated water and sewerage must be provided to
          each lot in accordance with the standards and requirements of Northern SEQ
          Distributor–Retailer Authority (Unitywater).
    10.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground connection to
          reticulated water and sewerage has been provided to each lot.
    Performance Bond
    11.   Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
          must be submitted to Council, to secure performance of all conditions of this
          approval, prior to the issue of a Development Permit for Operational Works. The cash
          bond or trading bank guarantee will be returned on performance of the conditions of
          approval less any costs incurred by Council in respect of enforcing performance of
          this permit. Council reserves the right to call upon the bond or guaranteed sum to
          effect compliance with conditions.
    Landscaping & Ecology
    12.   Landscaping and rehabilitation works must be undertaken in accordance with an
          Operational Works approval and Planning Scheme Policy - PSP 3 Landscaping
          Plants and Guidelines. An ecological rehabilitation and landscaping plan must be
          submitted, prepared by a suitably qualified person* and must include in particular:



                                                                                     Page 5 of 134

Section 6

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                9 DECEMBER 2014


          a.      Western Tributary - the area to be rehabilitated must be generally 10m from the
                  top of bank of the western tributary and the whole of The Noosa Plan’s mapped
                  Riparian Buffer area to the western side of the western tributary.
          b.      Eastern Tributary - the area to be rehabilitated must be generally in accordance
                  with the approved Revegetation & Rehabilitation Management Plan – Eastern
                  Tributary Stage 5 & 6
          c.      details of the treatment to all batters, armoury, plantings, weed treatment,
                  location of services/utilities and rehabilitation.
          d.      a maintenance period of no less than 3 years
          e.      a species palette and densities table incorporating the species selection of only
                  native indigenous species
          f.      measurable and achievable criteria on which the performance of the floristic
                  and structural component of the re-vegetation strategy can be assessed
                  annually over three years, including no weeds at the end of the re-vegetation
                  period
          g.      provision of 1 street tree with a minimum pot size of 100 litres planted within the
                  road reserve for every 8 metres of road frontage including around the cul de
                  sac’s
          h.      control of all weeds species listed in the following standards and legislation:
                  i.    declared plants under the Land Protection (Pest and Stock Route
                        Management) Act 2002 and sub-ordinate Regulation 2003
                  ii.   Council Listed Environmental Weeds, Exotic Grasses and other plants
                        identified in writing by Council (*refer to Advisory Note)
    13.   All rehabilitation and re-vegetation of the eastern tributary (waterway) must be
          completed prior to Council endorsement of the Plan of Survey.
    Dedication of Land as Reserve
    14.   The area identified as lot 100 Park must be dedicated to the Crown as a reserve for
          Park purposes. The land to be dedicated is “non-trunk infrastructure” for the purposes
          of the Sustainable Planning Act 2009.
    Active Park
    15.   Active park embellishments must be provided generally in accordance with drawing
          number 14/005-S01, titled Erindale Park, Cooroy Proposed Park Land Development
          Concept Plan, prepared by Play Environment Consulting dated 13.05.14 and 14/005-
          S01 and 14/005-S02, titled Erindale Park, Cooroy Proposed Park Land Development
          Concept Plan, prepared by Play Environment Consulting dated 17.11.14. All works to
          be dedicated are “non-trunk infrastructure” for the purposes of the Sustainable
          Planning Act 2009.
    Works within Protected Land
    16.   The following works must be undertaken within the land to be dedicated to the Crown
          as Park reserve:
          a.      footbridge and pathway
          b.      All rehabilitation and re-vegetation of the eastern and western tributaries
                  (watercourses)
          c.      Active Park embellishments in accordance with this Decision Notice.
          All works must be undertaken in accordance with an Operational Works approval.


                                                                                      Page 6 of 134

Section 7

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


    ENGINEERING
    External Works
    17.   A new intersection must be constructed joining Blue Wren Place with the new road.
          The works must be undertaken in accordance with an Operational Works approval,
          and must include in particular:
          a.   vehicle priority maintained to Blue Wren Place
          b.   provision of sight distances adequate for the design speed of the road
          c.   installation of street lighting
          All works to be dedicated are “non-trunk infrastructure” for the purposes of the
          Sustainable Planning Act 2009.
    New Roads
    18.   The new roads shown on the Approved Plans must be constructed in accordance
          with the conditions of this Decision Notice and dedicated as road reserve at no cost
          to Council. The works must be undertaken in accordance with an Operational Works
          approval and must include in particular:
          a.   a reserve width of 15 metres minimum widened where applicable to encompass
               the cul-de-sacs and the necessary verge areas
          b.   sealing, kerbing and channelling
          c.   an “Access Road” in accordance with Council’s Planning Scheme Policy 5 –
               Engineering Design Standards - Road, Drainage and Earthworks
          d.   construction of pedestrian footpaths in accordance with the conditions of this
               Decision Notice
          e.   installation of street lighting
          f.   modifications to existing services
          g.   cul-de-sacs in accordance with Council’s Planning Scheme Policy 5 –
               Engineering Design Standards - Road, Drainage and Earthworks
          h.   bollards or similar approved barriers on the western side of the new road that
               prevent vehicles from entering into the proposed bio-swale and park
        i.     flood immunity in accordance with QUDM
        All works to be dedicated are “non-trunk infrastructure” for the purposes of the
        Sustainable Planning Act 2009.
    Pedestrian and Bicycle Facilities
    19.   Pedestrian and bicycle facilities must be provided for the development. The works
          must be undertaken in accordance with an Operational Works approval and must
          include in particular:
          a.    a 2 metre wide footpath within the road verge on the eastern side of the new
                road extending to join with the existing pathway in Blue Wren Place
          b.   pram ramps on both sides of Blue Wren Place at the intersection with the new
               road
          c.   a 2 metre wide footpath within proposed Lot 100 extending to the pathway and
               footbridge as shown on plan number 1225-62A dated 9/14 prepared by
               Callaghan and Toth
          d.   a 2 metre wide footpath within the new road (between lots 25 & 26) and
               proposed Lot 100 connecting the cul-de-sac of the new road to the existing
               pathway network in Lake Macdonald Drive.
          All pedestrian and bicycle facilities to be dedicated are “non-trunk infrastructure” for
          the purposes of the Sustainable Planning Act 2009.


                                                                                   Page 7 of 134

Section 8

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


    Stormwater Drainage.
    20.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval, and must include in particular:
          a.   the drainage structures generally as shown on the Approved Plans
          b.   the provision of Level 2 inter-allotment drainage for proposed Lots 26-28
               including registration of drainage easements
          c.   provision of kerb adapters for all new lots that discharge into the new road
          d.   extension of the site stormwater system to accommodate stormwater from
               applicable areas external to the site, including registration of drainage
               easements
          e.   a maintenance path to any proposed bioretention basin that is suitable for
               Council’s maintenance vehicles
    21.   A stormwater quality treatment system must be provided for the development. The
          works must be undertaken in accordance with an Operational Works approval and
          the Bioretention Technical Design Guidelines (Water by Design) and must include in
          particular:
          a.   stormwater quality treatment devices generally in accordance with the
               Approved Plans
          b.   bioretention devices which:
               i.     are designed generally in accordance with IPWEQA Standard Drawing
                      No. WSUD-001
               ii.    are designed to ensure that flows which exceed the treatment capacity of
                      the device avoid damaging of the filter media or subjecting the filter media
                      to excessive sediment loads
               iii.   are provided with a free-draining outlet from the sub-soil drainage system
    22.   Where bio-retention devices (or similar) are required within a residential allotment the
          devices:
          a.   must be installed prior to the sealing of the Survey Plan
          b.   must be protected by a covenant.
          c.   a maintenance handbook, able to be provided to future owners, must be
               prepared for the system to outline how the system works and the level of
               maintenance that will be regularly required. The maintenance handbook must
               be submitted to Council for approval and for records purposes prior to the
               sealing of the Survey Plan.
    23.  Detailed life cycle costing must be prepared for the stormwater quality treatment
         system by a Registered Professional Engineer Queensland and submitted to Council
         prior to the issue of any Development Permit for Operational Works.Electricity and
    Telecommunication Services
    24.   Underground reticulated electricity and telecommunication services must be provided
          to each lot in accordance with an approval for Operational Works and the standards
          and requirements of the relevant service provider.
    25.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.


                                                                                   Page 8 of 134

Section 9

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


    26.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and
          all applicable legislation at the time of construction.
    Easements
    27.   Easements for inter-allotment drainage within Lots 26-28 which encompass the
          constructed drainage structures.
    28.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    29.   All easements must be designed in accordance with the planning scheme and
          granted at no cost to the Grantee. Where the Grantee is Council or a service
          authority, the easement documentation must be in accordance with the Grantee’s
          standard easement terms. Draft easement documentation must be submitted to
          Council for endorsement.
    30.   All works must be kept clear of any existing or proposed easements on the subject
          land, unless agreed otherwise in writing by the Grantee.
    Earthworks and Retaining Walls
    31.   All fill and associated batters must be undertaken in accordance with an Operational
          Works approval, and contained entirely within the subject site unless written
          permission from the respective landowner(s) is provided to Council.
          UNITYWATER
          The following Unitywater conditions are applied in accordance with the South East
          Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
          Connections Policy. The conditions below form part of a water connection aspect
          which are taken to be a water approval for a staged connection. Any future
          applications must be made to Unitywater under South East Queensland (Distribution
          and Retail) Restructuring Act 2009. Unitywater can be contacted as follows:
          Phone:     1300 0 Unity (1300 086 489)
          Email:     [email protected]
          Web:       www.unitywater.com
    32.   Reticulated water must be provided to each lot in the development. This must
          include:
          a.    Ensuring that internal water pipes are wholly contained within the lot they will
                serve.
          b.    An approved water meter for each lot in accordance with Unitywater and SEQ
                Standard Drawings.
          c.    Provision of a water service from the existing 100mm diameter water main to
                service located in Blue Wren Place to service each lot within the proposed
                subdivision in accordance with Unitywater and SEQ Standard Drawings.
          d.    Water meters must be located on alternative boundaries to electrical pillars
          e.    The fire-fighting demand on Unitywater’s water supply system from the
                development must not exceed 15 litres per second
    33.   Reticulated sewerage must be provided to each lot in the development. This must
          include:
          a.    Ensuring sewer house drains are wholly contained within the Lot they will serve.
          b.    Provision of sewerage infrastructure to within the property boundaries of each
                Lot within the proposed subdivision.

                                                                                   Page 9 of 134

Section 10

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


    34.   A minimum clearance of 1.5 metres must be maintained between Unitywater sewers
          and proposed building envelopes, buildings and other structures
    35.   Easements of between 3 and 10 metres must be provided over all Unitywater sewers
          located within property boundaries in accordance with the SEQ standards.
          Easements shall be centred over the pipe. Easement terms shall be the most current
          registered dealing held by the Department of Natural Resources & Mines and shall
          not be altered or amended.
    36.   Stormwater retention systems and gross pollutant traps must maintain a minimum
          clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure
    37.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
          Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
          Landscaping plants within these clearances must be low growing when mature and
          suitable Unitywater approved varieties.
    38.   Construction works undertaken in the vicinity of Unitywater water supply or sewerage
          infrastructure must not adversely affect the integrity of the infrastructure. All costs
          associated with repair, replacement or alteration of infrastructure must be met by the
          applicant.
    Advisory Notes
    Aboriginal Cultural Heritage Act 2003
    1.    There may be a requirement to establish a Cultural Heritage Management Plan
          and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH
          Act).
          The ACH Act establishes a cultural heritage duty of care which provides that: “A
          person who carries out an activity must take all reasonable and practicable measures
          to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to
          fail to comply with the duty of care. Substantial monetary penalties may apply to
          individuals or corporations breaching this duty of care. Injunctions may also be issued
          by the Land and Resources Tribunal, and the Minister administering the ACH Act can
          also issue stop orders for an activity that is harming or is likely to harm Aboriginal
          cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
          You should contact the Cultural Heritage Unit on 07 32476212 to discuss any
          obligations under the ACH Act 2003.
    Infrastructure Charges
    2.    This Development Permit will trigger an “Adopted Infrastructure Charge Notice” (if
          applicable) to be issued in accordance with Council’s “Adopted Infrastructure
          Charges Resolution” under the State Planning Regulatory Provision (Adopted
          Charges) and the Sustainable Planning Act 2009.
    Qualified Persons
    3.    For the purpose of preparing a Rehabilitation Plan, a qualified person is considered to
          be a landscape architect or ecologist with a minimum of 3 years current experience in
          the field of landscape design.
    Building and Construction Industry (Portable Long Service Leave) Levy
    4.    The QLeave levy must be paid prior to the issue of a development permit where it is
          required. Council will not be able to issue a Decision Notice without receipt of details
          that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
          6855.




                                                                                  Page 10 of 134

Section 11

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            9 DECEMBER 2014


    Co-ordination of Operational Works Assessment
    5.   Additional application fees apply to Operational Work applications where the different
         aspects of the works are lodged separately. Significant savings in application fees
         will result if all works are lodged in a single application.
    Preparation of a Preliminary Construction Management Plan
    6.   A preliminary Construction Management Plan must be submitted with the Operational
         Works application and must address the following:
         a.    traffic management during all aspects of the construction phase including:
               i.     a Traffic Management Control Plan in accordance with the Manual of
                      Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                      and traffic control measures prior to construction
               ii.    maintenance of safe pedestrian access for the areas affected by the
                      works during and after daily construction has ceased
               iii.   proposed fencing to the site during the construction phase of the
                      development
               iv.    approval of the Traffic Management Control Plan by the Department of
                      Transport and Main Roads (DTMR) for any works on State controlled
                      roads
               v.     provision for worker car parking
         b.    maintenance and protection of water quality and existing drainage lines through
               the construction site, through the implementation of appropriate erosion and
               sediment control measures
         c.    works programme identifying key components of the works and their respective
               durations
         d.    establishment of a communication protocol with the general public, adjoining
               owners, emergency services and local businesses to advise of agreed
               construction times, impacts on traffic, services and other relevant issues
         e.    identification of complaint management procedures including:
               i.     contact details for the on-site manager
               ii.    dispute resolution procedures
         f.    details on the location of external fill sites/sources, the haulage route, type of
               vehicle to be utilised during filling operations and frequency of usage. NB any
               damage to the existing road system as a result of haulage operations shall be
               fully repaired at the applicant’s expense
         g.    it is acknowledged that the preliminary Construction Management Plan will be a
               draft document requiring finalisation upon appointment of the Principal
               Contractor employed to construct the works and a final document will be
               required to be submitted at the Pre-Start Meeting for the project.
    UNITYWATER
    7.   Connection to the Unitywater live water supply and live sewerage system must be
         undertaken by Unitywater at the applicant’s cost.




                                                                                Page 11 of 134

Section 12

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              9 DECEMBER 2014


B.    Include the following property notes:
      REC13/0146 – Stormwater Treatment Device
      The following notation applies to approved lots 26, 27 and 28:
      “A private stormwater treatment device is located within this allotment and the owner is
      responsible for any maintenance”
      “This property contains a stormwater treatment device protected by a covenant, and a
      maintenance handbook is available under separate application which outlines the
      maintenance requirements.”



REPORT
1.    PROPOSAL
The proposal seeks to subdivide 3 lots into 17 lots, being 16 fully serviced residential lots and a
park lot. The residential lots range in size from 603m² to 990m² and the park lot is 2.884ha. A
playground is proposed within the park lot. The application is before Council because a
Preliminary Approval only is recommended rather than a Development Approval.

Access to the lots will be via 2 new cul de sac roads, as continuations of an unformed stub road
off Blue Wren Place. Figure 1 shows the proposed layout and is included as Attachment 1.




Figure 1 – Layout and stub road location



                                                                                   Page 12 of 134

Section 13

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   9 DECEMBER 2014


Stormwater runoff is to be treated through rain gardens within lots 26, 27, and 28 and rain gardens
within the road reserve for lots 21-25 inclusive. A bio retention swale along the western side of the
access road treats surface water in conjunction with run off from lots 17 -20 and Lots 29- 32.
The applicant proposes to rehabilitate a 10m wide corridor for the full length and both sides of the
waterways except for an area near the existing stub road. A footpath is proposed from the end of both
cul de sac’s connecting to the proposed footbridge and the existing pathway to the north. The foot
bridge proposed across the waterway is also part of the stormwater detention strategy for the
development.
The applicant seeks to provide a playground in lieu of the Park portion of the Infrastructure Charges
as provided for under the Sustainable Planning Act 2009. An Infrastructure Agreement is proposed to
secure the playground in lieu of the Park Charge or if the Park Charges is paid, a refund of the Park
Contribution amount paid. The draft Infrastructure Agreement is currently being reviewed.
2.     SITE DETAILS
2.1. Background
This application is essentially Stage 3 of a 6 staged development, with each stage being submitted as
individual applications. Stage’s 4 (MCU13/0226 & REC13/0148), 5 (REC14/0008) and 6
(REC14/0009) are before Council.
    Stage 1 has been approved creating Lots 1, 2, 3, and 4 fronting Lake Macdonald Drive
      (REC13/0015)
    Stage 2 has been approved creating Lot’s 5, 6 and 7 fronting Wilgee Court (REC13/0095).
    Stage 4 - MCU13/0226 & REC13/0148 is located adjoining Stage 3 and proposes 25 residential
      lots.
    Stage 5 – REC14/0008 proposes 5 residential lots and is before Council
    Stage 6 - REC14/0009 proposes 4 residential lots and is before Council
2.2.   Site Description
The site is traversed by two tributaries of Six Mile Creek, described as the eastern and western
tributaries. The location of the tributaries is shown in Figure 2 below. The western tributary runs from
south to north and the eastern tributary runs from the east to the north west corner of the land. The
land is pasture except for a narrow stand of riparian vegetation along the tributaries and a low lying
area to the southwest corner of the lot. The site slopes gently from the northern boundary toward the
tributaries.




                                                                         Figure 2 - Tributary location



                                                                                        Page 13 of 134

Section 14

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              9 DECEMBER 2014


2.3. Surrounding Land Uses
The land adjoins Lake Macdonald Drive to the east, detached housing lots to the north and
south, parkland and undeveloped Detached Housing zoned land to the west and Community
Services land subject to current development applications REC13/0148 and MCU13/0226. The
northern portion of land is subject to 2 current for subdivision applications, REC14/0008 and
REC14/0009. All applications are currently before Council. Figure 3 below shows the subject site
in relation to Cooroy and the surrounding land uses.




Figure 3 - Locality Plan

3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of the
following statutory planning instruments to the extent they are relevant to the development:
    State Planning Policies;
    the South East Queensland Regional Plan;
    State Planning Regulatory Provisions;
    any Structure Plan or Master Plan in place for declared areas;
    any Preliminary Approval Overriding the Planning Scheme for the land;


                                                                                 Page 14 of 134

Section 15

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                9 DECEMBER 2014


   the Planning Scheme for the local government area; and
    any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.

3.2. State and Other Statutory Instruments
State Planning Policy
The proposal meets the Integrated Development Assessment requirements of State Planning
Policy 2014.
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
State Planning Regulatory Provisions
The following State Planning Regulatory Provisions apply to the application:
    SEQ Regional Plan Regulatory Provisions
The proposal is for an urban activity within the Urban Footprint and is consistent with the SEQ
Regional Plan Regulatory Provisions


3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Cooroy and Lake Macdonald Locality and is zoned Detached
Housing. The proposed subdivision for detached housing is identified as consistent within the
zone and is required to follow a code assessable application process.
Locality Provisions
Cooroy and Lake Macdonald Locality Code
The proposal provides a low density housing estate that offers residential amenity consistent with
the developed character of Cooroy. The lots overlook, adjoin or are near a proposed park, with
pedestrian and bicycle pathways provided from the end of the new road to an existing pathway
which connects to the trunk pathway along Lake Macdonald Drive. The proposal complies with
the provisions of the Locality Code.
Land Use & Works Provisions
The following codes which regulate land use and design are most applicable to this application:
    Reconfiguring a Lot Code
    Landscaping Code
    Engineering Works Codes
The application has been assessed against each of the above applicable codes. The pertinent
issues arising out of the assessment against the codes are discussed below:
Reconfiguring a Lot Code
Lot layout, shape and size
The residential lots are fully serviced and range in size from 603m² to 990m² complying with the
minimum lot size of 600m² required by the Code. All lots are generally rectangular in shape and
have frontage to the new roads except for lot 18 which is a battle axe lot. Lot’s 25 to 32 adjoin the
proposed parkland while the other lots adjoin detached housing to the rear. In regard to lot
layout, shape and size, the proposal complies with the provisions of the Code.

                                                                                    Page 15 of 134

Section 16

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                9 DECEMBER 2014


Earthworks
The lots are proposed to be re-profiled to provide level building platforms, which results in
retaining walls up to 1 metre above the natural surface level on some lots. This is preferable as
the developer will undertake the cut and fill works rather than individual owners or builders, which
often results in inconsistent or sub-standard works and surface drainage issues. The fill is not for
flood immunity and will not adversely impact on the watercourses or riparian vegetation.
Open Space
The Code requires the development to provide open space in accordance with the following:
“Active Parkland or open space linkage to Active Parkland is provided in accordance with the
Priority Infrastructure Plan in Part 15;” or
“Park contributions are paid in accordance with the applicable infrastructure charging instrument.”
The applicant is seeking to provide active parkland (a playground) in lieu of the Park
Contributions for the following developments:
    REC13/0146 (subject application)
    REC13/0148 (1 into 26 lots)
    REC14/0008 (2 into 6 lots)
    REC14/0009 (2 into 6 lots)
Under the Sustainable Planning Act 2009, local parks and equipment may be considered as
trunk infrastructure and accordingly applicants are entitled to an offset in their infrastructure
charges.
The proposed playground is not trunk infrastructure as it is not currently identified in Council’s
Priority Infrastructure Plan (PIP). The PIP sets out trunk infrastructure planning throughout the
Noosa Shire.
Public recreational land east of the railway line is currently limited to drainage reserves, a natural
amenity reserve and small undeveloped local parks. Figure 4 below shows the location of these
parks and reserves.




Figure 4 - Parks and Reserves in the Cooroy area


                                                                                     Page 16 of 134

Section 17

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                9 DECEMBER 2014


Council’s Sport and Recreation and Strategic Planning Officers confirm that an active park would
benefit the development and the surrounding residents as there is no active park east of the
railway line. The Noosa Park Strategy 2006, the background document that informed the Priority
Infrastructure Plan, indicates that Cooroy has an oversupply of local parks. However, all active
parks are located on the western side of the railway line. The Noosa Park Strategy 2006
acknowledges the deficiency of local parks east of the railway and states:
“The existing town community is well serviced by existing local parks to the west of the railway
line although additional parks will be required as the town expands to the east and south east of
the rail corridor.”
Despite the acknowledged park deficiency east of the railway, no active park is identified in the
Priority Infrastructure Plan. The Noosa Parks Strategy 2006 also recommends a local park
should be provided to serve every 500 to 2500 people and be within 500m of their residences.
The closest active park east of the railway is the Botanical Gardens, approximately 2.5km from
the subject site. Apex Park, west of the railway, is approximately 1km from the subject site and
surrounding residences. The railway also acts a physical barrier to Apex Park for residents of
east Cooroy. Consequently, more than 1000 residents east of the railway line do not have an
active park within 500m of their residences.
Council’s Park Project Officer has provided an estimated cost of playground equipment as
proposed by the applicant. The proposed playground is determined to be generally equivalent to
the apportioned Park Contribution for the developments identified above.
The cost of the playground is proposed to directly offset the apportioned Park Contribution of the
Infrastructure Charges or, alternatively a refund of paid Park Contributions or a combination of
both. It has been confirmed by the Director of Corporate Services that amounts of up to $150,000
can be refunded in the December quarter of the following financial year after the completion of
works. Balance amounts of over $150,000 can be refunded in the December quarter in the
second financial year after completion of the works.
The Code requires either a Park Contribution be paid or an active Park provided in accordance
with the PIP. Given there is no active park (or planned) east of the railway, the applicants request
to provide an active park to offset the Park Contributions is supported.
The active Park can be delivered through an Infrastructure Agreement (IA) and Councils Priority
Infrastructure Plan as prescribed by the Sustainable Planning Act 2009. It is proposed the
majority of the Park embellishments will be provided prior to the sealing of the plans and the
remainder provided prior to sealing of the plans of the last subdivision of the 4 applications
identified above. As part of this subdivision the following embellishments will be provided:
    Natural play activity mound including the following equipment:
      o Slide
      o   Boulder steps
      o   Scramble wall
      o   Tyre steps
      o   Rope walk/climbing net
    Park signage and landscaping to the mound
    Raised meeting point
    Water connections
    Double swing
    Park shelters, settings and benches
Prior to the sealing of the last plan of subdivision the following embellishments will be provided:
    Flying fox
    Basket half court

                                                                                     Page 17 of 134

Section 18

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              9 DECEMBER 2014


An IA is currently in draft form and being reviewed. It is anticipated the Infrastructure Agreement
will be finalised through the Negotiated Decision process and subject to a further report to
Council.
The proposal complies with the Reconfiguring a Lot Code.
Overlay Provisions
The following overlay codes are applicable to this application:
   Biodiversity Overlay – Riparian Buffer
   Natural Hazards Overlay Code – Flood Hazard


Biodiversity Overlay Code
The Code seeks to avoid development in the riparian buffer to minimise edge effects of
development, maintain wildlife corridors and to help maintain water quality.
Approximately 40% of the site is affected by Riparian Buffer areas. The mapped buffers are not
centrally located over the watercourses and do not follow the meander of either tributary, but
range in width of up to 70m in the western tributary. The applicant proposes to rehabilitate most
of the riparian buffers and 10m from the top of bank for the full length and both sides of the
waterways, including the portion of the waterway not affected by the Riparian Buffer.
Both tributaries are identified as stream order 3 waterways. A 70m wide mapped buffer over the
western tributary is extreme for a stream order 3 waterway and is the result of the mapping
inconsistency. The Planning Scheme identifies a 10m buffer (5m each side of centre) for a
stream order 3 waterway when not affected by the Riparian Buffer Overlay.
Approximately half the playground, the access road and a bio-swale along the road is within the
riparian buffer. The location of the access road is governed by the existing stub road which was
provided as part of a previous subdivision assessed under the superseded planning scheme
which required a lesser buffer than that of The Noosa Plan.
To minimise infrastructure within the buffer, the road alignment moves eastward from the end of
the stub road upon entering the site, however, the majority of the road and bio-swale are still
within the riparian buffer. Very little vegetation is being removed for the road construction, and
the proposed 10m of vegetation rehabilitation between the road and the waterway is an adequate
buffer for a stream order 3 waterway. There is no other reasonable access to the site and, as a
whole including the western side of the western tributary; approximately 40m of riparian buffer
area is proposed to be rehabilitated adjacent the road. This will minimise edge effects, maintain
water quality and rehabilitate a current degraded area of the western tributary.
Natural Hazards Overlay – Flood Hazard Area
Approximately 50% of the land is flood affected being below the level of a Q100 event. The
applicant provided a Flood Assessment which considered the land areas subject to 4 current
development applications (being the subject application, REC13/0148, REC14/0008 and
REC14/0009). The proposed flood strategy is not a fully conventional detention system, using a
variety of storage methods to achieve a non-worsening at the site boundaries. The proposed
methods include deliberately “roughing” the flood ways by utilising riparian vegetation, excavating
side storage adjacent to the western tributary, channel re-profiling, and a restrictive footbridge
across the eastern tributary and 2 conventional bio basins. The applicants Flood Assessment
indicates that there is no risk to surrounding residences as there is a non-worsening at any flood
affected boundary in a Q100 event.




                                                                                   Page 18 of 134

Section 19

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   9 DECEMBER 2014


Council engaged an external hydrologist to conduct a peer review of the Flood Assessment. The
review confirmed the non-worsening to be accurate but raised concerns with the unconventional
flood strategy because approximately 50% of the flood storage is achieved by “roughness”
provided by flood plain vegetation of the western tributary. Notwithstanding Conventional flood
storage in the form of a bio retention basin and a restrictive footbridge across the eastern
tributary are sufficient to address flooding for development applications REC14/0008 and
REC14/0009. As is standard practice, a sensitivity test was provided that modelled uncontrolled
vegetation growth in the flood plain and a high blockage factor of the footbridge in a Q100 event,
which indicates that in this worst case scenario, there would be worsening at the Blue Wren
Place boundary. It is difficult to model and consider every possible flooding scenario, but the
Code seeks to ensure the development does not compromise the safety of people and property
from floods. Although the proposed lots are all above the worst case scenario flood levels, the
development has the potential to unreasonably impact on upstream residences.
It is not standard industry practice to use “roughness” of the flood plain for flood detention
storage and by doing so, poses a risk to Council in the long term to rely on riparian vegetation for
flood storage. Given the risk to surrounding residents, and to Council, the flood strategy is not
supported and should be amended to provide a conventional flood strategy.
4.     CONSULTATION
4.1. Referrals
The application was forwarded to Unitywater and the following internal Council specialists:
     Engineering Officer
     Ecologist
     Strategic Planning Officer
     Sport and Recreation Officer
     External peer review of flood the assessment by Hydrology & Water Management
       Consulting Pty Ltd.
Their assessment forms part of this report.
5.     CONCLUSION
The proposal complies with the provisions of the Planning Scheme in terms of layout, vegetation
rehabilitation and site works. However, the proposed unconventional flood detention strategy
raises concerns and poses unacceptable risks to surrounding residents and for Council in relying
upon vegetation for flood storage purposes. The Sustainable Planning Act 2009 permits the
assessment manager to issue a preliminary approval when an aspect of development does not
comply with the Planning Scheme and then to upgrade to a Development Permit as part of the
Negotiated Decision process. In this regard it is recommended a Preliminary Approval is granted
to allow the applicant to revise the flood strategy to meet the provisions of the Planning Scheme.
Departments/Sections Consulted:

     Community Services                        X   Planning & Infrastructure
     Disaster Management & Public Order            Building & Plumbing Services
     Waste & Environmental Health                  DA Planning
     Community Facilities                          Strategic Land Use Planning
     Cultural Facilities                           Asset Design & Investigations
                                                   Asset Planning
                                                   Civil Operations
                                                   Environment

     Executive Office                              Corporate Services
     Community Engagement                          Finance
     Customer Service                              ICT
     Executive Support                             Procurement & Fleet
     Governance                                    Property & Facilities
     Human Resources                               Revenue Services



                                                                                      Page 19 of 134

Section 20

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   9 DECEMBER 2014




                                                      Page 20 of 134

|               a BOTTOM                                                                                                         (3 STORMWATER GRATE
           =                                                                                                                      =)                 |mwa
                   actor                                                                                                          © srommaren usw
           ===                                                                                                                    Bf acomor snow
           = =                                               101                                                                  =
 N         —                                          7       or                     CORDWoop           b                         ° ere             MAX WATTERSON
                   SS                       Ben                 %                       oF               RIVE                       ee                 + ASSOCIATES
                   =                                ee           %                     is 2                                                           CONSULTING SURVEYORS
           ——D —— rane                        Sy
           ——                                                    gh                    ms                   :            mo                               & PLANNERS
           oe                                               a"       NN      wea PX,                                    igor? Re                    rosacea  "
            —————  renamed,                                ‘~    9, 68 ies Se Si is                                           ‘                         ‘ope sree
           _ =                                              WA           2p          w      ae L754                      j    P Nt                    ‘ooroy Qld 4563
           ts                              99                %                TOSI      NEN        sire     laczetasee ||     fl 198                 aes
                   aan                   RP881300         4 00.          N :                  Boon    =         ~      Satu ~~ j                     Email. [email protected]
                                                               \ \           \ {5% ate Developments 44,24 f                               AQ
   THE COMPLETION OF STAGES 5 & 6 AND                   2.884ha exc ay        iB 18K =,        z OY                1                    £           cient: VALKEV PTY
DEVELOPMENT TO BE COMPLETED FOLLOWING                      PARK ‘\            A AS   EP         0                                                      -
      REC13-0148 (Subject to approval)       fe     REC13-0096-& Stageed &6    Lone ©      e      a              RP173883              3                 LTD.
                                             “                      \\              STARE   Re       [                                 S
                                 8     YW \                          \S           ‘    .     > 732m   Jag OUI         ot
                                 A ee                                                  2      ag srade      LES           \Y                        PLAN OF PROPOSED
                        3        sa       i)) ¥        a                                  B M.2ha G97 pS                yy    os                    RECONFIGURATION
                      reitarss    Yh      i    ;     ge 32,           . \      se i\ SOE          ne 12 U8              OC     Prd                  OF LOT 5 ON SP266731
                              ey         rw                              AIT   (ERE      E\ Svat                83 5            Oo                  & PARTS OF LOT 137
                          a              Wy    BS                4        \                Oreo         ls                     ~                    ON MCH978 & LOT 2
                        ip              Ws / 2          em       8         WA                 RB    13)   ef               - oy                     ON RP173883.
         1735    _    Af            Bou al  Asaf      320, J           yee v\                       30.04          Y iy                             (STAGE 3).
        5%      38:                     “         reteete,                 LY.                 see                                                  ro
            Is        Sy                  "\~ Fgh) A        j         Or                               So
       636m?     oe                   j})    r   Or ae xy    102m* Tem  eS BC                / i  “     \     A      fo    9                        COUNTY: MARCH
     “aa |   34   ¢ fl               Mi)   U oe 3      ie]   ow | 92 1       ei wa            Ll .               a    5 “ —       —                 LOCAL GOVT: NOOSA SHIRE COUNCIL
      S TAGE 4k                i    If    f?    5     NEw     RO.      SBE           na       S a ez fee                                            LOCALITY: COOROY
     >                22: E     AN PA         KR   2a—F    <     AD    Z        LS                WU.            p rs —~
        7 | ke a                YY   |          % 20 »|    Pry                    > Sa   Vy          TE         |e
         f 56 2 Os /*            \l\    §    BR © 665m =         rrr,                a        = SY).          E                                    Scale: 1:1500  Plan 1 of 1
     55 el   Seam: * HE fF         \      2        a   |     A                     8     Wes            oe                                             .          Date: 2-07-14
     650m? |. Ta   y   .           ) |   ly IS  19          R          e                 a           9 oe"         Ne                              Datum: AHD
     7a |     of                   IY fy (F r   or   7                        ex                - 3            oF                                   oe Riso 8      Ref:
          lo 9402                  i               >  3                :     9             PATHWAY ET                                                  .
      pte                          j q" pS              ee            cE                     A oa                                                   Cenntosm   110-3032AP5:
                             5.99    Le    %               oy                LSS Aa o>          OL
                 eee               |  ¥   Ea pO                     B                SEZs,                                                                       :        B
       % 6 AN                00         a: Press]        be     a        Zs cr ~              wp?                                                  Th    has been for applicati
                         shere7s9 |||    |]          ares                    Lf             oO                                                      purposes only and maybe subject change.
            7           RESERVE OPEN SPACE |               ® cm 4        KOs            AY
                            »   /       |                       1”   @f             ae          100 INUNDATION LINE PLOTTED FROM STORMWATER         approximate only an subject to fel survey.
                                       |                           é                              DETENTION & FLOODING REPORT PREPARED BY
              8           LW                       fs             V                                  BRISBANE STORMWATER MANAGEMENT
             &                        ,
              "P25 9      p79,       oe, PLACE                         &                         Scale 1:1500 - Lengths are in Metres
                        ren OLS oe      10 / 2                      Cy        ful        [|  |    ft of    ft   tf |    ft  |
                                               1 1                   rT         16   0   15  30   45  60  75   90  105  120 135  150  165
                                        SP           12            Vv
                                               279 39

                                                                                                                                                            Page 20 of 134

Section 21

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   9 DECEMBER 2014




                                                      Page 21 of 134

x      .                      ,  |        j         |                 |    +   |         /       |         |
                        BOTANICAL NAME                                                   Va           STERN TREY ON             |          P|                |        |e                         |        Callaghan & Toth
                                                                                                                   —\i-         |                            |        |                 |    Th                -     .
                                                                                                                  wo Nona                                   |                  |        bY                  | Civil, Environmental &
                  |__Calochiaena dubia | Soft bracken        | -    | 2635                                                 a                                |        |                 |         |         }\\) Hydraulic Engineers
              | Dianetie coerula        | Cormman Flex tty} 25 | 50 | 50_|                                                              a         oe        _|                                  |          i           oa 298
                  |__Dodonea triquetra  |     Hop bush        | =            35                                pY                         CH          i                       |        |                  1)     ayer stOaSh HES 4567
                                                                                                                                          a             es       ee  |        }        i                   My
            [Gonna ospero              |    _Sowseage       —+(| - | 26 | 36 _|                -                                          BOS =                      Se eee                            SH     prone 5476908, Far 5474804
                [__Lemonara Hyertix     |   Creek Mat Russ   | 25 | 50 | 100_|                                              [stace 5]    ks hg                                           ee                     ee cheated con
              | tomanda longifolia [Mat Rush                   25    so     100                                           \               A She           8 J STAGE 5                         TL    esas |     aotarn ID OEE
                                                                                                  ’                   42)                Gis 0 OS                                             N | ferecrd for] ovigin (amy fe"
                                                                               |                        ZONE Cl             J STAGE 5    Ia    ie
                                                                                         PASSNE                                           i
             [“Wisnia coersies [Native Ginger                «dt - [27 |       |                                             1    5   |   AO                                                         oer
                                                                                        PARKLAND                               I          A     A            STAGE 5
              | Backhousia citriodora [Lemon Scented Myrtle   | 20 | 26  [40 |                    ttm SOM BANK TOP                        A                                                          MAX WATTERSION & ASSOCIATES
                  |__Backhousio myrtifolio | __— Cinnamon myrtle | - (| 26 | 40                        eS,                    "Gm FROM BANK TOPWSA RC                                RP173883        PHONE 54 426 121
              [Caticarpa penaunculata |      Native antona   | 20 | 26 | 0_|                                                  \            a      Ye                                             A   fore
             | Gordyfine rubra          [Red fruited palm ty [20 | 26 | 40 |                                                     STAGE 5 | SA WA          [stace 5                             ¢     PROPOSED 31 LOT SUBDIMSION
                                                                                                          >                                   5     {                                           -
              [-Homatonthus nutons |         Bleeding Heart ——~(| - | 26 | #0 _|             Greater    seback                               Cara        |                                 rh     || 88 UKE MocDONALD DRIVE
              [Hibiscus heterophylus |        wid Roselo     | - | 26 | «0 |                                                                  MAGA                                        E23      Tl cooroy
                       —                                                                 _ _   |Greater setbac!                               eh Ea,                                      mR
                [— Macaranga tenarivs | Bulocks Heart         [14 | 26 | #0 |           acTIMfrom top of bank.                    \           awa          10                                 ed
                [_ Weisleuco sieperi    | —=—=—S—S—SSS~d 1          | 26 | «0 |        —_PARKLASe@ Conditions                         me       ey    NO                  "                   Yale
                                                                                                       uo                         idm FROM BANK TOPS, (G9                                   wy
          [tomas SSSSS—S 8                                          ae | 400             685MREC 14/0008                                        a     By             re                      ATS     (cen
PT                                                                                                               7                                     ED        | STAGE 6 |                   yal
                                                                                           ——,                   \\               hn      “%,     eA    KZ,                                   “ALES
                  po        tReS                                                                — —               \                     NS      bx       SOD                                    Se) | VALKEV PTY LTD
                   a                                                                                     2X                  PONE        Se                aN                                  sf
                  |___Brachychiton discolour | _Kurrajong ||                                                  “4 Ne                           Y Bg         if                              ed
               [— Calistemen Salignus   | White bottle brush |     | #0   | #0 |                                   a\)                          WY          BB          12                     Ar
                [—corymbio gummitero   |      Pik Blodwoos    | 8 | 40    |  0 |                      .         \                gO               a                                      ©      |“   [REVEGETATION.& REHABILTATION
              | cryptocerye cbovate     | _Pepperberry Tree    18 | 40 | «0 |                                        "        ‘Ot        om       Urry              STAGE 6]    |               \\] | MANAGEMENT. PLAN” EASTERN
                  |__Gryptocarye triplinervis | Three-veined Crypocarya [|| 40 |                      —_              \            !       3           apes                         STAGE 2 | ° s    UIRIBUTARY STAGE 5 & 6
                 | _Elaecorpus grandis [Blue Quandong         |    |        40                            \           \\                                           13               OMPLETED]
                  |__EUcalyptus grandis |    Flooded Gum     | Tt                                           \          "                                                          A            he
              [Eucalyptus micracons |         Tallownoaa      [18 | #0 | #0 _|                                .         \             ;        et ae           orvars     ee
                                                                                                                 .                    §                                               5          | || LOT 136 on MCH978
            [Ficus coronata             | Greek Soncpiper Fig |    | #0 |   #0 _|               as                                    3        \                                             ar
             [Ficus macrophyla          |   Moreton Bay Fig   [18 | 40 | «0 |                 STAGE 3              we     \                                             =        _        “25))|     Parish of TEWANTIN
                  |___Flindersio schottiona [Bumpy Ash        |    |         40               (FUTURE)                SI                     re    aw           ~_—                “Sipe          || County of MARCH
              | Glochidion ferdinangi__ [Cheese tree         | Tt                            ,                         "        tL        ©.   EEE              REFER TO 1225-88        “<a       || SUNSHINE COAST COUNCIL
            [meine tint                 | _wnite beeen       |     |     |   #0_|             28                                in            B57         7100  (for a0 wasn ems            *9 +111  Locality of LAKE MacDONALD
                 [——Grevitea robusta | __Siky 0               [18 |      | «0 _|           on         FPARON_ NAPPING DOMTREAN  i                         ark                                  ti,
              | vogera pseudornus | Foambork                   | 440                            2      OF THIS POINT, STREAM BANK So         f                                                 wo
                                                                                             -  4       USED FOR START OF BUFFER   x        Zo        SOUTHERN EXTENT OF                         :
                  |__Lephostemen confertus [Brush box          || 4040                    pS                                                          [COUNCIL RIPARIAN OVERLAY
                 [—Welleuca tnarifaie  | ~Rar-leaved Poperbank [15  | 40] 0]              ae                                :                      SS                           Pin (Sm FROM CE
                      Melicope elleryana       Pink Euodio                | 40 |                                             \                      a       ~ WS                  OF CREEK EACH SIDE) ~~~] [0.510 1520 25 Mies 50
                [—Reponea voribiis | Wuttonwooa              +f    |     |   «0 _|                                           SS                      ZONE C                               —              :
                                                                                                                             hy                    f                                          )     = —=———_———_————__————————————————]}
                [__Sterculio quarto [Peanut tree             |     |     |  #0 _|                                              SS                            [EE                          Fe |] oe Rese are               me soe
              [Syneerpia glomulifera    |     Turpentine   +s | #0 | #0 _|                  SS                                      Ro                              ALN                  /                   Oo Sura Movs
               | syayaium australe      |     rush chery     |     | #0 |   #0 _|                                Sev WOE CLE AREA      “Ni                         Fh
                 [—Waterousia torbunde [Weeping Lily Paty     [18   | 40 |   +0_|                                 1         oe oe                                 ~                    /
         Poa                                                   50520        1000                                        Be      PO                             ;                                    Foed|_revison detas———SSSS—=* te
                                                                                                                24              Gf  OLA                                             ,               [A | ISSUED FOR APPROVAL i101
                                                                                                           A,               wot      BES                                      :       Sm woe oN Bom ]{{ [|
                                                                                                          ¢       4               Sc                          3                       sanks FROM cenTRe| Jf
                  LEGEND:                                                                                 g   3   :           LOR      oy       PN                      fi            UNE OF CREEK   pe
                               ZONE A ~ INFILL PLANTING ~ 1526m2                                           mt    ¢        Z        \      4           goes”       ;                                    —
                  |            INFILL PLANTING REQUIRED FOR 30% OF AREA TO ACHIEVE 1 PLANT/1.5m          23            ae:         A}             4 Ro BASIN      .                                  US
                               REMOVE WEEDS AS REQUIRED TO SECTION 5 OF PLAN 1225-90A                                - am         26 \  3           O,      ’
                                                                                                              #&      STAGE 1 |        Sey         ‘cs          a
                               ZONE 8 ~ INFILL PLANTING - 2163m2                                           a                          OR,       Z             2                                      ,       IRECTO
                  [OI          Rrra curren atea pair 70% OF aReas To                           ~       2        \   FCQMPLETED        C\b          pte                                             Foie WocDorad_Orive\Design\Curent_DWG-BASE
                               ACHIEVE PLANT DENSITY OF 1 PLANT / 1.5m2.                        RAL        :     \   ’      —          ae
                               REMOVE WEEDS AS REQUIRED.                                18 LOPE VAR       to     NE       APN        _e     ww                                                          FOR APPROVAL
                  [atone ¢ - Reveceranion puvtine - 2752m2                              ERASE PP            9       Nag     Oe         yor?
                               RIPARIAN BUFFER AREA PLANT AREA TO ACHIEVE                Rede           Ry          Mauger
                               PUNT DENSIY OF 1 / Sm, CURENTY                                          PA          al Ne
                               RIPARIAN AREA FROM TOP OF BANK LIMITED TO                  7} :      me           we ME woe                                                                                 drawing number
                               GRASS, NATIVE VEGETATION PRESENT ON BANKS OF              L218 7 2               Efe
                               WATERWAY, SPRAY GRASS.                                   [[°/99                  ww                                                                                        1225-89
                                                                                        ra,                     we,   #
                   = ==  ===   COUNCIL RIPARIAN BUFFER OVERLAY EXTENTS                 /!          1             AS wall                                                                                               A
                                                                                       /

Section 22

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                9 DECEMBER 2014



2                         DEVELOPMENT APPLICATION FOR RECONFIGURATION OF 2 LOTS INTO 6 LOTS
                          SITUATED AT 1-11 WILGEE COURT COOROY - REC14/0008
DOCUMENT IN FOR MATI ON




Author                            Development Planner, Glen Conforti
                                  Planning & Infrastructure Department

Index                             EMC/Application/REC14/0008

Attachments                       1.   Proposal Plans



         APPLICATION DETAILS

         Applicant                            Valkev Pty Ltd

         Proposal                             Development Permit for Reconfiguration of a Lot (2 lots into 6)

         Properly Made Date                   18 June 2014

         Information Request Date             17 July 2014

         Information Response Date            14 October 2014

         Decision Due Date                    18 December 2014

         Number of Submissions                Not Applicable


         PROPERTY DETAILS

         Property Address                     1 -11 Wilgee Court Cooroy

         RP Description                       Lot 2 SP266731 & Lot 137MCH 978

         Land Area                            3.642ha

         Existing Use of Land                 Vacant


         STATUTORY DETAILS

         SEQRP Designation                    Urban Footprint

         Locality                             Cooroy and Lake Macdonald

         Zone                                 Detached Housing Zone
                                              Biodiversity Overlay – Riparian Buffer Area
         Overlays
                                              Natural Hazards Overlay – Flood Hazard Area
                                              Natural Resources Overlay – Gas Pipeline Buffer Area
                                              Natural Resources Overlay – Extractive Resource Buffer Area
         Assessment Type                      Code Assessment




                                                                                                     Page 22 of 134

Section 23

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 9 December 2014 regarding Application No. REC14/0008 for a
Development Permit for Reconfiguration of a lot (2 lots into 6 lots) situated at 1 – 11 Wilgee Court
Cooroy and approve the application in accordance with the following conditions:
PLANNING
When Conditions Must Be Complied With
1.   Unless otherwise stated, all works required by the conditions of this Decision Notice must
     be completed prior to Council endorsement of the Plan of Survey.
Approved Plans
2.   Development undertaken in accordance with this approval must generally comply with the
     approved plans of development. The approved plans are listed in the following table unless
     otherwise amended by these conditions.
       Plan No.             Rev.   Plan, prepared by                              Date
       10-3032AP6B3                Plan of Proposed Reconfiguration of Lot 8 on   14-10-14
                                   SP266743 (being part of Lot 137 on MCH978
                                   & Lot 2 on RP173883) and as annotated by
                                   Council

       1225-89              A      Revegetation & Rehabilitation Management       1 October 2014
                                   Plan – Eastern Tributary Stage 5 & 6 and as
                                   annotated by Council

3.   All lot numbering on the subdivision plan to be submitted to Council for compliance
     assessment must remain as shown on the Approved Plans.
4.   The development must be undertaken and operated in a manner that causes no
     detrimental effect upon the amenity of the neighbourhood by reason of the creation of
     excessive noise, lighting nuisance or other emissions.
Road & Park Names
5.   The proposed names of roads and parks must be lodged with the application for a
     Development Permit for Operational Works. Names are to be:
     a.    Relevant to Australian, preferably local, history ,flora, fauna, culture, landscape or
           physical characteristics;
     b.    If used, personal names should commemorate persons who have contributed
           significantly to the development of the region; demonstrated outstanding levels of
           civic service; or achieved role-model status in the wider community or donated
           property or funds for community benefit; and be recognised in memoriam;
     c.    Park names should be unique within the locality;
     d.    Approval will not be given to a name that may construed as advertising, is more than
           one word, understanding that a geographic relationship such as Cooroy Mountain is
           permissible; is insensitive to diverse cultures and does not accord with community
           standards; and is not concise, easy to pronounce and spell and be without accent
           marks, apostrophes or hyphens.
6.   All street signs on new roads (public and private) and parks must be erected prior to works
     being accepted on maintenance.




                                                                                   Page 23 of 134

Section 24

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 9 DECEMBER 2014


Boundary Encroachments
7.    Certification must be submitted to Council from a Licensed Surveyor which certifies that:
      a.   all constructed access and roadworks (including associated fill batters and retaining
           walls) are fully contained within a dedicated reserve or registered easement
      b.   all utility services and connections (eg. electricity, telecommunications, water,
           sewerage) are wholly located within the lot they serve or alternatively included within
           an easement
      c.   all retaining walls and structures are fully contained within the lot they retain
      d.   any fill, including fill batters, are wholly contained within the subject site and not on
           adjacent properties
Water & Sewer Connections
8.    An underground connection to reticulated water and sewerage must be provided to each lot
      in accordance with the standards and requirements of Northern SEQ Distributor–Retailer
      Authority (Unitywater).
9.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
      (Unitywater) must be submitted to Council that certifies an underground connection to
      reticulated water and sewerage has been provided to each lot.
Performance Bond
10.   Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
      be submitted to Council, to secure performance of all conditions of this approval, prior to
      the issue of a Development Permit for Operational Works. The cash bond or trading bank
      guarantee will be returned on performance of the conditions of approval less any costs
      incurred by Council in respect of enforcing performance of this permit. Council reserves the
      right to call upon the bond or guaranteed sum to effect compliance with conditions.
Landscaping & Ecology
11.   Lot 15 must be removed from within the Riparian Buffer Overlay of The Noosa Plan and the
      boundary setback a minimum of 10 metres from the top of bank, whichever is the greater.
      The area removed from the lot must be rehabilitated in accordance with the conditions of
      this Decision Notice.
12.   Landscaping and rehabilitation works must be undertaken in accordance with an
      Operational Works approval and Planning Scheme Policy - PSP 3 Landscaping Plants and
      Guidelines and must include an ecological rehabilitation and landscaping plan, prepared by
      a suitably qualified person* and must include in particular:
      a.   the area to be rehabilitated and re-vegetated must be generally in accordance with
           the approved Revegetation & Rehabilitation Management Plan – Eastern Tributary
           Stage 5 & 6
      b.   details of the treatment to all batters, armoury, plantings, weed treatment, location of
           services/utilities and rehabilitation.
      c.   a maintenance period of no less than 3 years
      d.   a species palette and densities table incorporating the species selection of only
           native indigenous species
      e.   measurable and achievable criteria on which the performance of the floristic and
           structural component of the re-vegetation strategy can be assessed annually over
           three years, including no weeds at the end of the re-vegetation period
      f.   provision of 1 street tree with a minimum pot size of 100 litres planted within the road
           reserve for every 8 metres of road frontage including around the cul de sac


                                                                                      Page 24 of 134

Section 25

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


      g.   control of all weeds species listed in the following standards and legislation:
           i.    declared plants under the Land Protection (Pest and Stock Route Management)
                 Act 2002 and sub-ordinate Regulation 2003
           ii.   Council Listed Environmental Weeds, Exotic Grasses and other plants
                 identified in writing by Council (*refer to Advisory Note)
13.   All rehabilitation of the eastern tributary (waterway) including the construction of the
      footbridge must be completed prior to Council endorsement of the Plan of Survey.
ENGINEERING
External Works
14.   A new intersection must be constructed joining Cordwood Drive with the new road
      (Masonry Street). The works must be undertaken in accordance with an Operational Works
      approval, and must include in particular:
      a.   vehicle priority maintained to Cordwood Drive
      b.   provision of sight distances adequate for the design speed of the road
      c.   installation of street lighting
      All works to be dedicated are “non-trunk infrastructure” for the purposes of the Sustainable
      Planning Act 2009.
New Roads
15.   The new road (Masonry Street) shown on the Approved Plans must be constructed in
      accordance with the conditions of this Decision Notice and dedicated as road reserve at no
      cost to Council.
      The road to be dedicated is “non-trunk infrastructure” for the purposes of the Sustainable
      Planning Act 2009.
16.   The new road (Masonry Street) as shown on the Approved Plans must be constructed.
      The works must be undertaken in accordance with an Operational Works approval and
      must include in particular:
      a.   a reserve width of 15 metres minimum widened where applicable to encompass the
           cul-de-sac and the necessary verge areas
      b.   sealing, kerbing and channelling
      c.   an “Access Road” in accordance with Council’s Planning Scheme Policy 5 –
           Engineering Design Standards - Road, Drainage and Earthworks
      d.   construction of pedestrian footpaths in accordance with the conditions of this
           Decision Notice
      e.   installation of street lighting
      f.   modifications to existing services.
      g.   A cul-de-sac in accordance with Council’s Planning Scheme Policy 5 – Engineering
           Design Standards - Road, Drainage and Earthworks
      All works to be dedicated is “non-trunk infrastructure” for the purposes of the Sustainable
      Planning Act 2009.




                                                                                    Page 25 of 134

Section 26

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              9 DECEMBER 2014


Pedestrian and Bicycle Facilities
17.   Pedestrian and bicycle facilities must be provided for the development. The works must be
      undertaken in accordance with an Operational Works approval and must include in
      particular:
      a.   a 2 metre wide footpath within the road verge on the western side of “Masonry Street”
           extending to join with the existing pathway in Cordwood Drive
      b.   pram ramps on both sides of “Masonry Street” at the intersection with Cordwood
           Drive
      c.   the pathway and footbridge located generally as shown on plan number 1225-62A
           dated 9/14 prepared by Callaghan and Toth excepting that the pathway sections are
           to be a minimum 2 metres wide.
      The pathway and footbridge to be dedicated is “non-trunk infrastructure” for the purposes of
      the Sustainable Planning Act 2009.
Stormwater Drainage.
18.   The site must be provided with a stormwater drainage system connecting to a lawful point
      of discharge. The works must be undertaken in accordance with an Operational Works
      approval, and must include in particular:
      a.   The drainage structures generally as shown on the Approved Plans
      b.   The provision of Level 2 inter-allotment drainage for proposed Lots 14-16 including
           registration of drainage easements
      c.   provision of kerb adapters for all new lots that discharge into the new road
      d.   extension of the site stormwater system to accommodate stormwater from Lot 1
           RP173883 and other applicable areas external to the site, including registration of
           drainage easements.
      e.   A maintenance path to the bioretention basin that is suitable for Council’s
           maintenance vehicles
      All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of the
      Sustainable Planning Act 2009.
19.   The existing stormwater drainage system for Lots 5-7 on SP266743 must be modified to
      discharge into the bioretention basin.
20.   A stormwater quality treatment system must be provided for the development. The works
      must be undertaken in accordance with an Operational Works approval and the
      Bioretention Technical Design Guidelines (Water by Design) and must include in particular:
      a.   stormwater quality treatment devices generally in accordance with the Approved
           Plans
      b.   bioretention devices which:
           i.     are designed generally in accordance with IPWEQA Standard Drawing No.
                  WSUD-001
           ii.    are designed to ensure that flows which exceed the treatment capacity of the
                  device avoid damaging of the filter media or subjecting the filter media to
                  excessive sediment loads
           iii.   are provided with a free-draining outlet from the sub-soil drainage system
      All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of the
      Sustainable Planning Act 2009.



                                                                                  Page 26 of 134

Section 27

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


21.   Detailed life cycle costing must be prepared for the stormwater quality treatment system by
      a Registered Professional Engineer Queensland and submitted to Council prior to the issue
      of any Development Permit for Operational Works.Stormwater and Flood Management
22.   Stormwater and flood management for the development must be provided generally in
      accordance with the provisions identified for the eastern tributary in the Stormwater and
      Flooding Report prepared by BSM and dated 15 September 2014. The works must be
      undertaken in accordance with an Operational Works approval and must include in
      particular:
      a.    a non-worsening at the site boundaries
      b.    certification must be submitted to Council at the completion of works from an RPEQ
            which certifies that the development has met the stormwater and flooding
            requirements of this Decision Notice
Electricity and Telecommunication Services
23.   Underground reticulated electricity and telecommunication services must be provided to
      each lot in accordance with an approval for Operational Works and the standards and
      requirements of the relevant service provider.
24.   Unless otherwise stipulated by telecommunications legislation at the time of construction,
      the development must be provided with all necessary conduits, pits and pipes to
      accommodate the future connection of optic fibre technology telecommunications.
25.   Certification must be submitted to Council from all relevant service providers which certifies
      that the development has met the requirements of this Decision Notice and all applicable
      legislation at the time of construction.
Easements
26.   Easements for inter-allotment drainage must be provided within Lots 11, and 14-16 which
      encompass the constructed drainage structures.
27.   An easement for drainage purposes must be registered against the title of proposed Lot 10
      in favour of Council over the land area identified as the eastern portion of proposed Lot 10
      with extents defined as the full frontage to Wilgee Court to the east, Lot 5 SP266743 to the
      north, extending along the southern boundary of proposed Lot 13 in REC14/0009 and the
      road reserve boundary to the eastern boundary of proposed Lot 100 in REC14/0009, along
      the southern boundary of Lot 100 in REC14/0009, then perpendicular to the southern
      boundary of proposed Lot 10 and returning to Wilgee Court.                   Draft easement
      documentation must be submitted to Council for endorsement
28.   Unless otherwise agreed in writing by the relevant service provider, any public or third party
      infrastructure located on the subject site must be placed within an easement registered
      against the title of the property.
29.   All easements must be designed in accordance with the planning scheme and granted at
      no cost to the Grantee. Where the Grantee is Council or a service authority, the easement
      documentation must be in accordance with the Grantee’s standard easement terms. Draft
      easement documentation must be submitted to Council for endorsement.
30.   All works must be kept clear of any existing or proposed easements on the subject land,
      unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
31.   All fill and associated batters must be undertaken in accordance with an Operational Works
      approval, and contained entirely within the subject site.




                                                                                    Page 27 of 134

Section 28

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                9 DECEMBER 2014


Advisory Notes
Aboriginal Cultural Heritage Act 2003
1.   There may be a requirement to establish a Cultural Heritage Management Plan and/or
     obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
     The ACH Act establishes a cultural heritage duty of care which provides that: “A person
     who carries out an activity must take all reasonable and practicable measures to ensure
     the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with
     the duty of care. Substantial monetary penalties may apply to individuals or corporations
     breaching this duty of care. Injunctions may also be issued by the Land and Resources
     Tribunal, and the Minister administering the ACH Act can also issue stop orders for an
     activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural
     heritage value of Aboriginal cultural heritage.
     You should contact the Cultural Heritage Unit on 07 32476212 to discuss any obligations
     under the ACH Act.
Infrastructure Charges
2.   This Development Permit will trigger an “Adopted Infrastructure Charge Notice” (if
     applicable) to be issued in accordance with Council’s “Adopted Infrastructure Charges
     Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the
     Sustainable Planning Act 2009.
Qualified Persons
3.   For the purpose of preparing a Rehabilitation Plan, a qualified person is considered to be a
     landscape architect or ecologist with a minimum of 3 years current experience in the field of
     landscape design.
Building and Construction Industry (Portable Long Service Leave) Levy
4.   The QLeave levy must be paid prior to the issue of a development permit where it is
     required. Council will not be able to issue a Decision Notice without receipt of details that
     the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
Co-ordination of Operational Works Assessment
5.   Additional application fees apply to Operational Work applications where the different
     aspects of the works are lodged separately. Significant savings in application fees will
     result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
6.   A preliminary Construction Management Plan must be submitted with the Operational
     Works application and must address the following:
     a.    traffic management during all aspects of the construction phase including:
           i.     a Traffic Management Control Plan in accordance with the Manual of Uniform
                  Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                  control measures prior to construction
           ii.    maintenance of safe pedestrian access for the areas affected by the works
                  during and after daily construction has ceased
           iii.   proposed fencing to the site during the construction phase of the development
           iv.    approval of the Traffic Management Control Plan by the Department of
                  Transport and Main Roads (DTMR) for any works on State controlled roads
           v.     provision for worker car parking



                                                                                     Page 28 of 134

Section 29

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 9 DECEMBER 2014


      b.     maintenance and protection of water quality and existing drainage lines through the
             construction site, through the implementation of appropriate erosion and sediment
             control measures
      c.     works programme identifying key components of the works and their respective
             durations
      d.     establishment of a communication protocol with the general public, adjoining owners,
             emergency services and local businesses to advise of agreed construction times,
             impacts on traffic, services and other relevant issues
      e.     identification of complaint management procedures including:
             i.     contact details for the on-site manager
             ii.    dispute resolution procedures
      f.     details on the location of external fill sites/sources, the haulage route, type of vehicle
             to be utilised during filling operations and frequency of usage. NB any damage to the
             existing road system as a result of haulage operations shall be fully repaired at the
             applicant’s expense
      g.     it is acknowledged that the preliminary Construction Management Plan will be a draft
             document requiring finalisation upon appointment of the Principal Contractor
             employed to construct the works and a final document will be required to be
             submitted at the Pre-Start Meeting for the project.

REPORT
1.    PROPOSAL
The proposal seeks to subdivide 2 lots into 6 lots, being 5 fully serviced residential lots and a
balance lot. The residential lots range in size from 654m² to 849m² and the balance lot is
2.446ha. The lot layout is shown in Figure 1 below and is included as Attachment 1. A portion of
the balance lot is part of a 5 lot subdivision REC14/0009 and a 17 lot subdivision REC13/0146,
both of which are currently before Council. The application is before Council because of the
conflict with the Natural Resources Overlay.




Figure 1 - Lot Layout

                                                                                      Page 29 of 134

Section 30

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   9 DECEMBER 2014


Access to the lots will be via the new “Masonry Street” cul de sac, a continuation of an unformed stub
road off Cordwood Drive. Lot’s 14, 15 and 16 are sited on the western side of Masonry Street, adjoin
the balance lot and overlook a vegetated waterway. Lot’s 8 and 9 are sited on the eastern side of
Masonry Street, adjoin existing detached housing lots and have some views across to the waterway.
Lots 14, 15 and 16 have inter-allotment drainage and Lot’s 8 and 9 drains to the street, before being
treated in a bio-retention basin and released to the eastern tributary.
The applicant proposes to rehabilitate a 10m wide corridor for the full length and both sides of the
waterway except for an area that adjoins lot’s 15 and 16 where 7.5m and 20.5m is proposed.
A footpath is proposed from the end of the cul de sac across the waterway, connecting to the
adjoining proposed parkland as part of application REC13/0146. A foot bridge proposed across the
waterway also forms part of the stormwater retention strategy for the development.
The applicant is seeking to provide a playground within the park on neighbouring land in lieu of Park
Contributions for the development.
2.     SITE DETAILS
2.1. Background
This application is essentially Stage 5 of a 6 staged development, with each stage submitted in
individual applications. Stage 6, REC14/0009 is before Council and proposes 4 residential lots
accessed from the new ‘Masonry Road’ and proposed to be constructed concurrently should this
application be approved. Details of the other stages of developments are as follows:
    Stage 1(REC13/0015) has been approved creating Lots 1, 2, 3, and 4 fronting Lake Macdonald
      Drive
    Stage 2(REC13/0095) has been approved creating Lot’s 5, 6 and 7 fronting Wilgee Court.
    Stage 3 (REC13/0146) is before Council and proposes 16 residential lots accessed from Blue
      Wren Place.
    Stage 4 (MCU13/0226 & REC13/0148) proposes 25 residential lots, is before Council and
      adjoins Stage 3.
2.2.   Site Description
The site is traversed by two tributaries of Six Mile Creek, described as the eastern and western
tributaries. The location of the 2 tributaries is shown in Figure 2 below. Approximately 70% of the land
is flood affected, except for where some residential lots are proposed via REC13/0146 and
REC14/0009. The majority of the land is pasture except for a narrow stand of riparian vegetation
along the creek lines and to a low lying area to the southwest corner of the lot. The site slopes gently
from the northern boundary toward the waterways.




                                                                     Figure 2 - Tributary location


                                                                                        Page 30 of 134

Section 31

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           9 DECEMBER 2014


2.3. Surrounding Land Uses
The land adjoins Lake Macdonald Drive to the east, detached housing lots to the north, parkland
and undeveloped Detached Housing zoned land to the west and undeveloped Detached Housing
zoned land to the south. Figure 3 below shows the subject site in relation to Cooroy and
surrounding land uses.




Figure 3 - Locality Plan

3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of the
following statutory planning instruments to the extent they are relevant to the development:
    State Planning Policies;
    the South East Queensland Regional Plan;
    State Planning Regulatory Provisions;
    any Structure Plan or Master Plan in place for declared areas;
    any Preliminary Approval Overriding the Planning Scheme for the land;
    the Planning Scheme for the local government area; and
    any Temporary Local Planning Instrument in place for the local government area.


                                                                                Page 31 of 134

Section 32

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
State Planning Policy

The proposal meets the Integrated Development Assessment requirements of State Planning
Policy 2014.
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
State Planning Regulatory Provisions
The following State Planning Regulatory Provisions apply to the application:
   SEQ Regional Plan Regulatory Provisions
The proposal is for an urban activity within the Urban Footprint and is consistent with the SEQ
Regional Plan Regulatory Provisions
3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Cooroy and Lake Macdonald Locality and is zoned Detached
Housing. The proposed subdivision for detached housing is identified as consistent within the
zone and is required to follow a code assessable application process.
Locality Provisions
Cooroy and Lake Macdonald Locality Code
The proposal provides a low density housing estate that offers residential amenity consistent with
the developed character of Cooroy. The lots overlook, adjoin or are near a proposed park, with
pedestrian and bicycle pathways provided from the end of the new road to an existing pathway
which connects to the trunk pathway along Lake Macdonald Drive. The proposal complies with
the provisions of the Locality Code.
Land Use & Works Provisions
The following codes which regulate land use are most applicable to this application:
   Reconfiguring a Lot Code
   Landscaping Code
   Engineering Works Codes
The application has been assessed against each of the above codes. The pertinent issues
arising out of the assessment are discussed below:
Reconfiguring a Lot Code
Lot layout, Shape and Size
The residential lots are fully serviced and range in size from 654m² to 849m² complying with the
minimum lot size of 600m² required by the Code. The development offers a variety of lot sizes
and shapes in accordance with the provisions of the Code.
Earthworks
The lots are proposed to be re-profiled to provide level building platforms, which results in
retaining walls up to 1 metre above the natural surface level on some lots. This is preferable as
the developer will undertake the cut and fill works rather than individual owners or builders, which
often results in inconsistent or sub-standard works and surface drainage issues. The fill is not for
flood immunity and will not adversely impact on the waterway course or riparian vegetation.

                                                                                   Page 32 of 134

Section 33

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


Open Space
The Code requires the development to provide open space in accordance with the following:
“Active Parkland or open space linkage to Active Parkland is provided in accordance with the
Priority Infrastructure Plan in Part 15;” or
“Park contributions are paid in accordance with the applicable infrastructure charging instrument.”
The applicant is seeking to provide a playground within the park on neighbouring land in lieu of
Park Contributions for the development. This is proposed to be delivered through an
Infrastructure Agreement as part of the REC13/0146 and Councils Priority Infrastructure Plan
(PIP). Under the Sustainable Planning Act 2009, local parks and equipment may be considered
as trunk infrastructure and accordingly applicants are entitled to an offset in their infrastructure
charges. It is anticipated this will be addressed through the Negotiated Decision process once
the Infrastructure Agreement is finalised.
Overlay Provisions
The following overlay codes are applicable to this application:
   Biodiversity Overlay Code – Riparian Buffer Area
   Natural Hazards Overlay Code – Flood Hazard Area
   Natural Resources Overlay Code – Extractive Resource Buffer Area
   Natural Resources Overlay Code – Gas Pipeline Buffer Area
Biodiversity Overlay Code
Approximately 50% of the site is affected by Riparian Buffer area. The mapped buffers are not
centrally located over the watercourses and do not follow the meander of either tributary, but
range in width from zero to 20m from the top of bank. The applicant proposes to rehabilitate most
of the riparian buffers and 10m from the top of bank for the full length and both sides of the
waterways, including the portion of the waterway not affected by the Riparian Buffer Overlay. A
portion of the riparian buffer on the south western side of the eastern tributary is not being
rehabilitated as a playground is proposed as part of the adjoining subdivision REC13/0146.
All lots are outside the riparian buffer except for a small western portion of lot’s 15 and 16. The
rear boundary of lot 15 is setback 7.5m from the top of bank which is not sufficient. To help
maintain water quality and provide sufficient area for maintenance activities a condition is
recommended to remove any portion of lot 15 from within the riparian buffer area. The location of
the riparian buffer on lot 16 is a result of the mapping inconsistency over the waterway, as there
is currently more than a 20m setback to the rear boundary of lot 16, which is sufficient for a
Stream Order 3 setback.
Provided lot 15 is removed from within the riparian buffer the proposal complies with the
provisions of the Biodiversity Overlay Code.
Natural Hazards Overlay – Flood hazard area
Approximately 70% of the land is flood affected, being below the flood level of a Q100 event. The
applicant provided a Flood Assessment that considers land areas subject to 4 current
development applications (being the subject application, REC13/0146, REC13/0148 and
REC14/0009). The proposed flood strategy is not a fully conventional detention system, using a
variety of storage methods to achieve a non-worsening at the site boundaries. The proposed
methods include deliberately “roughing” the flood ways by utilising riparian vegetation, excavating
side storage adjacent to the western tributary, channel re-profiling, and a restrictive footbridge
across the eastern tributary and 2 bio basins. The Flood Assessment strategy’s modelling
suggests that there is no risk to surrounding residences and a proposed non-worsening at any
flood affected boundary in a Q100 event.



                                                                                   Page 33 of 134

Section 34

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                9 DECEMBER 2014


An external peer review of the Flood Assessment confirmed the non-worsening to be accurate
but raised some concern with the unconventional flood strategy because approximately 50% of
the flood storage is achieved by “roughness” provided by flood plain vegetation of the western
tributary. This strategy is not supported as it poses too high a risk to rely on vegetation for flood
storage purposes. However, the flood strategy indicates that conventional flood storage in the
form of a bio retention basin and a restrictive footbridge across the eastern tributary are sufficient
to address flooding for this subdivision and the adjoining application REC14/0009. Given the
conventional flood strategy for this development, the applicant has sufficiently demonstrated
compliance with the Natural Hazards Overlay Code.
Natural Resources Overlay – Extractive Resources Buffer
The proposed residential lots are within the Extractive Resources Buffer Area. The clay mining
activities and associated haulage roads are restricted to Neales Pit, which is located more than
550m away from the proposed lots. Figure 4 below shows the location of Neales pit in relation to
the subject site.




Figure 4 - Location of Neales Pit in relation to the subject site

The area between the active pit and the proposed subdivision is elevated and naturally vegetated
with the hilly terrain providing a natural acoustic buffer for future residents.
The proposal will not limit the potential for the utilisation of the extractive resource given the
existing natural buffer.




                                                                                     Page 34 of 134

Section 35

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            9 DECEMBER 2014


Natural Resources Overlay – Gas Pipeline Buffer
The residential lots are within the 200 metre buffer area identified for the proposed Gatton to
Gympie Gas Pipeline. Figure 5 below shows the location of the gas pipeline easement in relation
to the subject site.




Figure 5 - Gas Pipeline easement

The Natural Resources Overlay requires adequate separation between the use and the gas
pipeline, with the Probable Solution seeking no increase to the number of people living or
congregating within 200m of the gas pipeline. The buffer area was adopted within the planning
scheme as a precautionary mechanism to trigger further investigation with the licence holder, and
is not a total exclusion zone within which no development can occur.
The gas pipeline is not yet established within the easement and advice from the pipeline licence
holder, APA Pty Ltd who own and operate the high-pressure gas pipelines, is that it is still
unknown whether a gas pipeline will be constructed. APA Pty Ltd has indicated that any future
pipeline can be designed to avoid dangers associated with the future construction and operation
of a gas pipeline. In this regard, APA Pty Ltd had no objection to the recent approval of an
adjoining 22 lot subdivision providing no lots were created within the gas pipeline easement.
There are no lots being created within the easement as part of this application.
The proposal does not meet the Probable Solution S14.1 of the code, which requires no increase
to the number of people living or congregating within 200m of the gas pipeline. However, the
proposal is consistent with the Overall Outcomes of the Natural Resources Overlay Code, which
seeks development to be located to ‘avoid dangers with the pipeline…’ and ‘not adversely affect
the operations of the pipeline…’
Given that the proposed lots will be within the gas pipeline buffer, a property note is
recommended advising future owners of the gas pipeline easement and contact details of the
licence holder.



                                                                                 Page 35 of 134

Section 36

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  9 DECEMBER 2014


4.     CONSULTATION
4.1. Referrals
The application was forwarded to Unitywater and the following internal Council specialists:
     Engineering Officer
     Ecologist
     External peer review of flood the assessment by Hydrology & Water Management
       Consulting Pty Ltd.
Their assessment forms part of this report.
5.     CONCLUSION
The proposed lots offer suitable residential amenity, having access to nearby parkland and
connectivity to the existing pedestrian network. The hilly terrain provides an adequate buffer
between the development and the extractive resource area and its location will not affect the
construction or operation of the gas pipeline. The proposal complies with the provisions of the
Planning Scheme and is recommended for approval, subject to conditions.

Departments/Sections Consulted:

     Community Services                       X   Planning & Infrastructure
     Disaster Management & Public Order           Building & Plumbing Services
     Waste & Environmental Health                 DA Planning
     Community Facilities                         Strategic Land Use Planning
     Cultural Facilities                          Asset Design & Investigations
                                                  Asset Planning
                                                  Civil Operations
                                                  Environment

     Executive Office                             Corporate Services
     Community Engagement                         Finance
     Customer Service                             ICT
     Executive Support                            Procurement & Fleet
     Governance                                   Property & Facilities
     Human Resources                              Revenue Services




                                                                                     Page 36 of 134

Section 37

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   9 DECEMBER 2014




                                                      Page 37 of 134

F                                                                           \         \,  EASTERN TREUTARY ;        }         |                 |    .      is            |
                BOTANICAL NANE                                                                        Na                       pros                                   oa                    Callaghan & Toth
            GROUND COVERS / GRASSES                                                                        \fe----—                                      }        |            oh.              Civil, Envi wtal &
-        [__Coiachiaena cubio   |     Sot brawn    [= [os |          |                                        So                                                                             \y) Hydraulic Engineers
         [__Dianetia eaeruio   |   Carman Flax tly  | 28 | 50] 50_|                                                          = 2                |                |                           Rennes tot 1308
         | —Dedenea triqetrs  | __Hop bush         =| - (| 6 | 35 _|                                 >                             rs:      a                                                Fy   ayy, sickens
                                                                                                                              ae    =        _ 4.
     [_Gahnia expera | Sawseage                    | -    | 25 | 36 _|               .                                        5                        I         L                | ||    te            e
                                                                                                                              Ex = he                         _          |        |             Phone 54749081, Fax 5474904
     | Lomanara Hyertix        |   Greek wat Rusn   | 28 | 0 | 100_|                                              STAGE 5]    BV SpA                          Ef                                  en aephrandaincon
          [_Lomonda longifeio | __Mot Rush          | 25 | 50   | 100_|                                                      Ba os               STAGE 5                I              ea eae           ee
          a                                                                                                                        ral                                               je                    "
                   TOTAL                              75   [228 | 356 _|                                  4D                 ead 2 Bo                                            N   | fbn fe    oii amy 6%
                                                                     SY                     ZONE C]             Astace 5 | ta      KX
                      eS                                                       pxssne                                         a                                                  I     Jfemwf
                                                                                                                              KA   Vo
          [___Npinio coeruieo  |    Nate Grnger_—*+[- [7 | #0 |               PARKLAND  \                        m5           OA   Oe            STAGE 5 I                             SNEED oF
      | Backhousia civiodora | Lemon Scented Myre   | 20 | 26  | 40 _|                    "                       ’           A                    A                                   MAK WATTERSION & ASSOCIATES
      | Backhovsia mytifolia | __—_—Crinamon myrtie (| -  (| 26 +| ~40_—|              "Om FROM, BANK TOP          10m FROM Bank TOPS 3                                 RP173883       PHONE S¢ 426 121
        | Gowicarpe penduncwata |   Notive iontono  | 20 | 26 | 40_|                                              \             A     Be                                             | [ret
     [_ceréyne tre                 Ret tts porn ny    20 [28 [00                                                     stace 5]    awa          [Stace 5                           © |] PROPOSED 31 LOT SUBDMSION
      | Henclettnus cutee |             seine ocr    a ete                    _ _ |Greater setback                                  AS                                       <4)     1] 55 LAKE MacDONALD DRIVE
      [Hibiscus neteroonyius |       wig Rosee     | -    | 26  | «0 |          -                                                 CLAS                                      fs          COOROY
          [__ Wacarenge tonorius | Qulocks Heart    [1   | 26 | 40 _|         ACTM from top of bank.                  scm Frou Baw TORR A     «10                             <=
        [__Meloleuco sieberi   | —=—=—SC~d 1              | 2  | 40 | —_ PARKLASee Conditions                             me       oy                       1        )         vy.
  [tora] S*d B28 |_|                                                          685m                                                  ve    es                                   1 NG    (coon
                           YO                                                                                                        oh               STAGE 6                   ye
  [mers]                               TCC            Cr Cd                          — __             \               =     NY       Be    RS                                     “4 | VALKEV PTY LTD
          |___Aphitonio excesa | _Redah             |    it     | =|                          sa                  YONE BE    SB                A                                  ff
      | Brocnyeniton aiscolour |     Kurang         |    |     | #0_|                              A                                BA          eA                          —— et
      | Catisternan Saigrus    | White bottle tran |      | #0 | 40_|                             \oN\                             a            es          12                      a
       | Corybia gummitera     |     Prk Bloodwood  [18 | #0 | «0 |                                      \           G0              os         by                         6      O\ NT itvecen              ATION
         [__Coptocorye obovate | __Pepperberry Tree [15 | #0 | 40_|                        ‘         \\            6                  Urn iy           [STAGE 6]                  Wa          RN     Rea
         [= Soptecarye Vpinenia | Tree-vened Copecena [|_| #0                                ‘                                +           ee                          Snr]         «| UtaBUTAey Srace''s a6
      | Eloecorpus grandia     |     Blue Quondong |     |     | 40 _|                         \                                                                    TcomPLeTeD|
         |     Eveatyptus grancis |  looses Gum     |    |      | 40 |                           \       ‘                                            's                          —f
       | Evcatyptus microcorys | __Tatownoos         15 | «0 | 40_|                                .                               mw ote         Psrcee]        -
       [Eucalyptus reshitera   |    Red Mohogony    [15 | #0   | 40_|                                 .      ON                                                         5           | |] Lor 136 on MCH978
       |__ Ficus caranate      | Greek Sonchiper Fig |    | 40 | +0 |                 ss                                           \                                               J
      [Ficus macrapnyia        | _wereten Bay fig   | 18 | 0 | 40 _|                STAGE 3             ~}                                                  :                “55/4     Parish of TEWANTIN
          [_Fiindersio schottiona | __Bumpy Ash    |     |     | 40 _|              (FUTURE)          Sf                              4             _                fmm! || County of MARCH
         |__Giochicion terdinenci__| Cheese tree    |    |     | #0 _|                                      q                              |      ae                                 11 SUNSHINE COAST COUNCIL
          [____Gmetina leienhorati, | White beech   |    |     | 40_|                                                             EF J 00 _ [for 30 BSN ota                    *9   || Locality of LAKE MacDONALD
          | —“crevttes robusta |    _Siy Oe         | 18 |     | «0 _|                     PARANA DOWNSTREMA                                 park                                td;
          |    vagera psevdornus |    Foombom      |      | #0 | 40 _|                      OF TS PONT, STEAM BANK               —<tae                                            Wie
        | Lephostemen confertus |    Brush box    —-|     | 40 | #0 _|                       USED FOR START OF SUFFER ~                  [Counc RPA OVRLAY|
      | Neisieuca inarifoia    | Flar-leaves Poperook | 15 | 40 | #0                                                                     SS                .        rom (im row cee]     HE
        | Weticape aeryona    | __Phk Euosio ————~+'1s |       | «0 |                                                                   a        =                   OF CREEK EXCH se) ~~] [SO
        | Rapanea variabiis   |    _Muttonwoos     |     |     | 40 _|                                                                “ZONE C
        | __Stereviia quaarifida |    Peanut wee   |     |     | #0 _|                                                g                          Ate                                |]   iy    PEP SRTe mee oe
          [___Sincorpio giomulfero | Turpentine     [18 _|     | #0_|             Ss                                   m                            a         oN                     >] L'a es
      | Syaygium australe      |      rush Oherry  |       «a   | «0_|                                iv WOE CLEAR ARE    .                            wrt”
      | Waterhousio torbunda |     weeping uly Ply  | 15 | «0 | 40 _|                                   QEAND LOTS FOR,”                             ~                                 [ress
 [orm                                 SSSCSCSC~CSCSCSCS~« BBO] 1000]                                                  aa                                               :              Foal recsen Geta ————————T te |
                                                                                                      ACCESS OR SERVICES], 4 Br
                                                                                                  __24         Se   Fe
                                                                                                ou                SY  ve   EF 7%                                 ‘       5m WOE ON BOTH J
                                                                            )                   d      ,              Sacee                       4                      BANKS FROM CENTRE PO
         LEGEND:                                                                               é                    a               ee                     ;            UNE OF CREEK   re
                       ZONE A RELL PLANTING — 15262                                             SY                             4        30 BSN”                                        ———————
          TE           irs puncte ecouren FOR 30% OF AREA TO ACHEVE 1 PLANT/1,5m              23            Pa            on,         ZN             }
                       REMOVE WEEDS AS REQUIRED TO SECTION 5 OF PLAN 1225-908                           or            ao  \            2,       .
                       ZONE B - INFILL PLANTING - 2163m2                                         -k        STAGE 1      ON Aen                 eal _
          [UII «Cirasun curren area pur 70% OF aRexs To                                      -       \     OMPLETED       FA3           nk      ph                                     RAJOBS\CT Projects in progress\ 1225 30 lots | ie
                       nar PAG, CONG Or | Pune Lo                                    and               Ot        .          ae         v ——                                            eke WocDenald_Orwve\ Design \Current OWG-BASE_|
                       REMOVE WEEDS AS REQURED.                               18 ATE eR        ONE           ae                                                                             FOR APPROVAL
          (OI) aon c - RevecETANON PLANTING - 2752m2                          PS SRS pp            Ff    Wes, VLA          yow™
                                                                               SFY      tf          ww           SAL        y
                       RIPARIAN BUFFER AREA PLANT AREA TO ACHIEVE             SON TBR        84    gy     eeu oat
                       PLANT DENSITY OF 1 / 1.5m. CURRENTLY                    Se              OPO             AS Ae
                       RIPARIAN AREA FROM TOP OF BANK LIMITED TO               72         See        we ae eae ore                                                                           Growing number
                       GRASS, NATIVE VEGETATION PRESENT ON BANKS OF             218739               fat                                                                                       ng
                       WATERWAY, SPRAY GRASS.                                  /      ,                 en                                                                                  1225-89
          = == om o= COUNCL RIPARIAN BUFFER OVERLAY EXTENTS                  , J        1              a ee?                                                                                             A
                                                                             .                                                                                                    Ks date ist octoarr 2014

                                                                                                                                                                                               Page 37 of 134

Section 38

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   9 DECEMBER 2014




                                                      Page 38 of 134

i           errors Uncen                                                                                                             S wremanrea cours
           ==                                                                                                                        =)                 |mwa
               EE  nro                                                                                                               © remmerewece
           “===                                                                                                                       eee wre
           SoS SS                                                                                                                    —
N          =<                                      neaou    |                          CORDWoop                                                         MAX WATTERSON
           =——                                en                                                          ORIVE                      SS                   + ASSOCIATES
           LAA                                  Sas.                                                                                                     CONSULTING SURVEYORS
           —e Sooo                                    ane          ;                                          18255                                           & PLANNERS
           —__—                                              4    we     2                                                     N
                   a                  Greater Setback        Serb,                                             16           | cove] &                    roaaeee
           —                          See Conditions vt                             3 \.          go    Lees              ft       19.                  Fo (7) suas
                = roee                from top of bank.                      Ba             Sehr                           18    RS                      Cooroy kd 4563
                  tn NCC                 RPEBT oS               os            * Bay  ed     R 849m"      s                Bigo-~~~ |                        ot  MWRSUTVeYS.COM.aU
     STAGE 5 TO BE COMPLETED PRIOR TO THE                          \         3              ,     -                                          AQ
     COMMENCEMENT OF REC13-0146 - STAGE 3.                  .      \             :     3)   Ea                        1                    £           ciien: YWALKEV PTY
                                                                    VAY          i     ~    ho                     RP173883
                                             Re          ha excluding \®       Lig 2ess AV   he     a om                                  Oo                LTD.
                                                       (RES 13/0095  AN         NE;                       Ss             -                ©
                                         4               ha including —\\S       Ne      Ao          ip rr              Pr
                                      A                 REC 13/0095    w\         Wy          \\                  SAA                                  Project:
                                    Z                                    iN           eM         eS                  7)     7                          PLAN OF PROPOSED
                        3        A                                       WY           Ye**— |                 ee        0)       Pros                  RECONFIGURATION
                      are                                               ‘\              Ye         Sy         ES scx onveiGeaien    wy                 OF LOT 8 ON
                             aS                                            WN              Ab,    Id          prePvcariw heccvey    oO                 SP266743 (being part
                              ¢                                            \\h              Woy               [i   6 u\ y
                          J “if                                             \ ‘\             Se              Dy         +t ly     —/                   of Lot 137 on MCH978
                          Z               p                                                                 of        -           ~
                       Z                 !                                  eh              i               f                   =                      & Lot 2 on RP173883).
                      a (s                                                   \ \                         aL      .      /
                     !                                        x           gue            CES               Al i                                        Coun MARC
                      Ry                                                      \ \        ay}               2   a                                       PARISH: TEWANTIN
         133                                                                   Sr                    >          3       Ona   :      a                 LOCALITY: COOROY
                                                                               A    mba == 4               Sy        qe.   Sy   —» =                   LOCAL GOVT: NOOSA SHIRE COUNCIL
      Meow                     1,    bf                                                  Ql    fou] Se
   MCUT3-0226 & RECIS-0148) |   \                  kpo Sat                             We                   Z JY                                       scale 4.1600  Pan tt
   (see development application | of 4                                              . SY So ,    eo               pyar    —
                   |                 jj          hace                               - eg               . Ae           we                               Datum: AHD    Date: 14-10-14
                                     i              REO13-0146)                 A   aA              Aa              ee                                 Origin; PM_ 178243
                                     ff                                    of          4        : a               v                                         RL 108.138  Ref:
         ae                         f                                    oF                Pe                                                          Contint osm 10-3032AP6B3
             -}~*                   E                                                     Se”     OL
          6                       uf                                 a)                    aa:                                                             7
       yg   mex?           100   a       _: Re                   {               a)              Pr                                                    rhs nhs ee propa apo
                7        SP218739; 3h   ff            ERE    SS               Lal         cre                                                          purposes only and may be subject to change.
            7                       LAG                   ofteme 1°      Ly                        Q100 INUNDATION LINE PLOTTED FROM STORMWATER        Dimensions and areas shown hereon are
                            a   /  hi                 3              £7 Z,           wr              DETENTION & FLOODING REPORT PREPARED BY           approximate only and subject to fina survey
              3              Wey,                   18739          os                                   BRISBANE STORMWATER MANAGEMENT
              hos, 9        100           a PLACE                       &                          Scale 1:1500 - Lengths are in Metres
                          SP218739         EI y                        +          luutual  |    |   |    |    |        I        |   |
                        RESERVE OPEN SPAGE 10  11 ~                 ¥             6%  oOo  1%  3    45  6    75   OO  105  120 135  4180 4165
                                        Sp            12
                                                27639

                                                                                                                                                                  Page 38 of 134

Section 39

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 9 DECEMBER 2014



3      DEVELOPMENT APPLICATION FOR RECONFIGURATION OF 2 LOTS INTO 6 LOTS
       PLUS 1 PARK LOT SITUATED AT 1 - 11 WILGEE COURT, COOROY - REC14/0009

Author             Development Planner, Glen Conforti
                   Planning & Infrastructure Department

Index              ECM/ Application/ REC14/0009

Attachments        1.   Proposal Plans



APPLICATION DETAILS
                               Valkev Pty Ltd
Applicant
                               Development Permit for Reconfiguration of a Lot (2 lots into 6)
Proposal
                               18 June 2014
Properly Made Date
                               17 July 2014
Information Request Date
                               14 October 2014
Information Response Date
                               18 December 2014
Decision Due Date
                               Not Applicable
Number of Submissions


PROPERTY DETAILS
                               1 -11 Wilgee Court Cooroy
Property Address
                               Lot 2 SP266731 & Lot 137MCH 978
RP Description
                               3.642ha
Land Area
                               Vacant
Existing Use of Land


STATUTORY DETAILS
                               Urban Footprint
SEQRP Designation
                               Cooroy and Lake Macdonald
Locality
                               Detached Housing Zone
Zone
                               Biodiversity Overlay – Riparian Buffer Area
Overlays
                               Natural Hazards Overlay – Flood Hazard Area
                               Natural Resources Overlay – Gas Pipeline Buffer Area
                               Natural Resources Overlay – Extractive Resource Buffer Area
                               Code Assessable
Assessment Type




                                                                                      Page 39 of 134

Section 40

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 9 December 2014 regarding Application No. REC14/0009 for a
Development Permit for Reconfiguration of a lot (2 lots into 6 lots) situated at 1 – 11 Wilgee Court
Cooroy and:
A.   Approve the application in accordance with the following conditions:
     PLANNING
     When Conditions Must Be Complied With
     1.    Unless otherwise stated, all works required by the conditions of this Decision Notice
           must be completed prior to Council endorsement of the Plan of Survey.
     Approved Plans
     2.    Development undertaken in accordance with this approval must generally comply
           with the approved plans of development. The approved plans are listed in the
           following table unless otherwise amended by these conditions.

             Plan No.             Rev.   Plan, prepared by                       Date

             10-3032AP7B4                Plan of Proposed Reconfiguration of     14-10-14
                                         Lot 8 on SP266743 (being part of
                                         Lot 137 on MCH978 & Lot 2 on
                                         RP173883)

             1225-89              A      Revegetation   &      Rehabilitation    1 October 2012
                                         Management Plan – Eastern Tributary
                                         Stage 5 & 6 and as annotated by
                                         Council

     3.    All lot numbering on the subdivision plan to be submitted to Council for compliance
           assessment must remain as shown on the Approved Plans.
     4.    The development must be undertaken and operated in a manner that causes no
           detrimental effect upon the amenity of the neighbourhood by reason of the creation of
           excessive noise, lighting nuisance or other emissions.
     Road & Park Names
     5.    The proposed names of roads and parks must be lodged with the application for a
           Development Permit for Operational Works. Names are to be:
           a.    Relevant to Australian, preferably local, history ,flora, fauna, culture, landscape
                 or physical characteristics;
           b.    If used, personal names should commemorate persons who have contributed
                 significantly to the development of the region; demonstrated outstanding levels
                 of civic service; or achieved role-model status in the wider community or
                 donated property or funds for community benefit; and be recognised in
                 memoriam;
           c.    Park names should be unique within the locality;
           d.    Approval will not be given to a name that may construed as advertising, is more
                 than one word, understanding that a geographic relationship such as Cooroy
                 Mountain is permissible; is insensitive to diverse cultures and does not accord
                 with community standards; and is not concise, easy to pronounce and spell and
                 be without accent marks, apostrophes or hyphens.



                                                                                   Page 40 of 134

Section 41

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


    6.    All street signs on new roads (public and private) and parks must be erected prior to
          works being accepted on maintenance.
    Boundary Encroachments
    7.    Certification must be submitted to Council from a Licensed Surveyor which certifies
          that:
          a.   all constructed access and roadworks (including associated fill batters and
               retaining walls) are fully contained within a dedicated reserve or registered
               easement
          b.   all utility services and connections (eg. electricity, telecommunications, water,
               sewerage) are wholly located within the lot they serve or alternatively included
               within an easement
          c.   all retaining walls and structures are fully contained within the lot they retain
          d.   any fill, including fill batters, are wholly contained within the subject site and not
               on adjacent properties
    Water & Sewer Connections
    8.    An underground connection to reticulated water and sewerage must be provided to
          each lot in accordance with the standards and requirements of Northern SEQ
          Distributor–Retailer Authority (Unitywater).
    9.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground connection to
          reticulated water and sewerage has been provided to each lot.
    Performance Bond
    10.   Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
          must be submitted to Council, to secure performance of all conditions of this
          approval, prior to the issue of a Development Permit for Operational Works. The cash
          bond or trading bank guarantee will be returned on performance of the conditions of
          approval less any costs incurred by Council in respect of enforcing performance of
          this permit. Council reserves the right to call upon the bond or guaranteed sum to
          effect compliance with conditions.
    Landscaping & Ecology
    11.   Landscaping and rehabilitation works must be undertaken in accordance with an
          Operational Works approval and Planning Scheme Policy - PSP 3 Landscaping
          Plants and Guidelines. An ecological rehabilitation and landscaping plan must be
          submitted, prepared by a suitably qualified person* and must include in particular:
          a.   the area to be rehabilitated and re-vegetated must be generally in accordance
               with the approved Revegetation & Rehabilitation Management Plan – Eastern
               Tributary Stage 5 & 6 and
          b.   details of the treatment to all batters, armoury, plantings, weed treatment,
               location of services/utilities and rehabilitation.
          c.   a maintenance period of no less than 3 years
          d.   a species palette and densities table incorporating the species selection of only
               native indigenous species
          e.   measurable and achievable criteria on which the performance of the floristic
               and structural component of the re-vegetation strategy can be assessed
               annually over three years, including no weeds at the end of the re-vegetation
               period.


                                                                                    Page 41 of 134

Section 42

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


          f.   provision of 1 street tree with a minimum pot size of 100 litres planted within the
               road reserve for every 8 metres of road frontage including around the cul de
               sac
          g.   control of all weeds species listed in the following standards and legislation:
               i.    declared plants under the Land Protection (Pest and Stock Route
                     Management) Act 2002 and sub-ordinate Regulation 2003
               ii.   Council Listed Environmental Weeds, Exotic Grasses and other plants
                     identified in writing by Council (*refer to Advisory Note)
    12.   All rehabilitation and re-vegetation of the eastern tributary (waterway) including works
          within the Park and the construction of the footbridge must be completed prior to
          Council endorsement of the Plan of Survey.
    Dedication of Land as Reserve
    13.   The area identified as lot 100 Park on the Approved Plans must be dedicated to the
          Crown as a reserve for Park purposes. The land to be dedicated is “non-trunk
          infrastructure” for the purposes of the Sustainable Planning Act 2009.
    Works within Protected Land
    14.   The following works must be undertaken within the land to be dedicated to the Crown
          as Park reserve:
          a.   footbridge and pathway
    ENGINEERING
    External Works
    15.   A new intersection must be constructed joining Cordwood Drive with the new road
          (Masonry Street). The works must be undertaken in accordance with an Operational
          Works approval, and must include in particular:
          a.   vehicle priority maintained to Cordwood Drive
          b.   provision of sight distances adequate for the design speed of the road
          c.   installation of street lighting
          All works to be dedicated are “non-trunk infrastructure” for the purposes of the
          Sustainable Planning Act 2009.
    New Roads
    16.   The new road (Masonry Street) shown on the Approved Plans must be constructed in
          accordance with the conditions of this Decision Notice and dedicated as road reserve
          at no cost to Council. The works must be undertaken in accordance with an
          Operational Works approval and must include in particular:
          a.   a reserve width of 15 metres minimum widened where applicable to encompass
               the cul-de-sac and the necessary verge areas
          b.   sealing, kerbing and channelling
          c.   An “Access Road” in accordance with Council’s Planning Scheme Policy 5 –
               Engineering Design Standards - Road, Drainage and Earthworks
          d.   construction of pedestrian footpaths in accordance with the conditions of this
               Decision Notice
          e.   installation of street lighting
          f.   modifications to existing services


                                                                                  Page 42 of 134

Section 43

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


          g.   A cul-de-sac in accordance with Council’s Planning Scheme Policy 5 –
               Engineering Design Standards - Road, Drainage and Earthworks.
          All works to be dedicated are “non-trunk infrastructure” for the purposes of the
          Sustainable Planning Act 2009.
    Pedestrian and Bicycle Facilities
    17.   Pedestrian and bicycle facilities must be provided for the development. The works
          must be undertaken in accordance with an Operational Works approval and must
          include in particular:
          a.   a 2 metre wide footpath within the road verge on the western side of “Masonry
               Street” extending to join with the existing pathway in Cordwood Drive
          b.   pram ramps on both sides of “Masonry Street” at the intersection with
               Cordwood Drive
          c.   the pathway and footbridge located generally as shown on plan number 1225-
               62A dated 9/14 prepared by Callaghan and Toth excepting that the pathway
               sections are to be a minimum 2 metres wide.
          The footpath and footbridge to be dedicated are “non-trunk infrastructure” for the
          purposes of the Sustainable Planning Act 2009.
    Stormwater Drainage.
    18.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval, and must include in particular:
          a.   The drainage structures generally as shown on the Approved Plans
          b.   provision of kerb adapters for all new lots that discharge into the new road
          c.   extension of the site stormwater system to accommodate stormwater from Lot 1
               RP173883 and other applicable areas external to the site, including registration
               of drainage easements
          d.   a maintenance path to the bioretention basin that is suitable for Council’s
               maintenance vehicles
          All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of the
          Sustainable Planning Act 2009.
    19.   The existing stormwater drainage system for Lots 5-7 on SP266743 must be modified
          to discharge into the bioretention basin.
    20.   A stormwater quality treatment system must be provided for the development. The
          works must be undertaken in accordance with an Operational Works approval and
          the Bioretention Technical Design Guidelines (Water by Design) and must include in
          particular:
          a.   stormwater quality treatment devices generally in accordance with the
               Approved Plans
          b.   bioretention devices which:
               i.     are designed generally in accordance with IPWEQA Standard Drawing
                      No. WSUD-001
               ii.    are designed to ensure that flows which exceed the treatment capacity of
                      the device avoid damaging of the filter media or subjecting the filter media
                      to excessive sediment loads
               iii.   are provided with a free-draining outlet from the sub-soil drainage system
          All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of the
          Sustainable Planning Act 2009.

                                                                                  Page 43 of 134

Section 44

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


    21.   Detailed life cycle costing must be prepared for the stormwater quality treatment
          system by a Registered Professional Engineer Queensland and submitted to Council
          prior to the issue of any Development Permit for Operational Works.Stormwater and
          Flood Management
    22.   Stormwater and flood management for the development must be provided generally
          in accordance with the provisions identified for the eastern tributary in the Stormwater
          and Flooding prepared by BSM and dated 15 September 2014. The works must be
          undertaken in accordance with an Operational Works approval and must include in
          particular:
          a.    a non-worsening at the site boundaries
          b.    certification must be submitted to Council at the completion of works from an
                RPEQ which certifies that the development has met the stormwater and
                flooding requirements of this Decision Notice
    Electricity and Telecommunication Services
    23.   Underground reticulated electricity and telecommunication services must be provided
          to each lot in accordance with an approval for Operational Works and the standards
          and requirements of the relevant service provider.
    24.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    25.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and
          all applicable legislation at the time of construction.
    Easements
    26.   An easement for inter-allotment drainage must be provided within Lot 11 which
          encompasses the constructed drainage structures.
    27.   An easement for drainage purposes must be registered against the title of proposed
          Lot 17 in favour of Council over the land area identified as the eastern portion of
          proposed Lot 17 with extents defined as the full frontage to Wilgee Court to the east,
          Lot 5 SP266743 to the north, extending along the southern boundary of proposed Lot
          13 and the road reserve boundary to the eastern boundary of proposed Lot 100,
          along the southern boundary of Lot 100, then perpendicular to the southern boundary
          of proposed Lot 17 and returning to Wilgee Court. Draft easement documentation
          must be submitted to Council for endorsement.
    28.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    29.   All easements must be designed in accordance with the planning scheme and
          granted at no cost to the Grantee. Where the Grantee is Council or a service
          authority, the easement documentation must be in accordance with the Grantee’s
          standard easement terms. Draft easement documentation must be submitted to
          Council for endorsement.
    30.   All works must be kept clear of any existing or proposed easements on the subject
          land, unless agreed otherwise in writing by the Grantee.
    Earthworks and Retaining Walls
    31.   All fill and associated batters must be undertaken in accordance with an Operational
          Works approval, and contained entirely within the subject site.


                                                                                  Page 44 of 134

Section 45

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            9 DECEMBER 2014


    Advisory Notes
    Aboriginal Cultural Heritage Act 2003
    1.   There may be a requirement to establish a Cultural Heritage Management Plan
         and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH
         Act).
         The ACH Act establishes a cultural heritage duty of care which provides that: “A
         person who carries out an activity must take all reasonable and practicable measures
         to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to
         fail to comply with the duty of care. Substantial monetary penalties may apply to
         individuals or corporations breaching this duty of care. Injunctions may also be issued
         by the Land and Resources Tribunal, and the Minister administering the ACH Act can
         also issue stop orders for an activity that is harming or is likely to harm Aboriginal
         cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
         You should contact the Cultural Heritage Unit on 07 32476212 to discuss any
         obligations under the ACH Act.
    Infrastructure Charges
    2.   This Development Permit will trigger an “Adopted Infrastructure Charge Notice” (if
         applicable) to be issued in accordance with Council’s “Adopted Infrastructure
         Charges Resolution” under the State Planning Regulatory Provision (Adopted
         Charges) and the Sustainable Planning Act 2009.
    Qualified Persons
    3.   For the purpose of preparing a Rehabilitation Plan, a qualified person is considered to
         be a landscape architect or ecologist with a minimum of 3 years current experience in
         the field of landscape design.
    Building and Construction Industry (Portable Long Service Leave) Levy
    4.   The QLeave levy must be paid prior to the issue of a development permit where it is
         required. Council will not be able to issue a Decision Notice without receipt of details
         that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
         6855.
    Co-ordination of Operational Works Assessment
    5.   Additional application fees apply to Operational Work applications where the different
         aspects of the works are lodged separately. Significant savings in application fees
         will result if all works are lodged in a single application.
    Preparation of a Preliminary Construction Management Plan
    6.   A preliminary Construction Management Plan must be submitted with the Operational
         Works application and must address the following:
         a.    traffic management during all aspects of the construction phase including:
               i.     a Traffic Management Control Plan in accordance with the Manual of
                      Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                      and traffic control measures prior to construction
               ii.    maintenance of safe pedestrian access for the areas affected by the
                      works during and after daily construction has ceased
               iii.   proposed fencing to the site during the construction phase of the
                      development
               iv.    approval of the Traffic Management Control Plan by the Department of
                      Transport and Main Roads (DTMR) for any works on State controlled
                      roads
               v.     provision for worker car parking

                                                                                Page 45 of 134

Section 46

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 9 DECEMBER 2014


            b.    maintenance and protection of water quality and existing drainage lines through
                  the construction site, through the implementation of appropriate erosion and
                  sediment control measures
            c.    works programme identifying key components of the works and their respective
                  durations
            d.    establishment of a communication protocol with the general public, adjoining
                  owners, emergency services and local businesses to advise of agreed
                  construction times, impacts on traffic, services and other relevant issues
            e.    identification of complaint management procedures including:
                  i.    contact details for the on-site manager
                  ii.   dispute resolution procedures
            f.    details on the location of external fill sites/sources, the haulage route, type of
                  vehicle to be utilised during filling operations and frequency of usage. NB any
                  damage to the existing road system as a result of haulage operations shall be
                  fully repaired at the applicant’s expense
            g.    it is acknowledged that the preliminary Construction Management Plan will be a
                  draft document requiring finalisation upon appointment of the Principal
                  Contractor employed to construct the works and a final document will be
                  required to be submitted at the Pre-Start Meeting for the project.
B.    Include the following property note:
      REC14/0009 – Gas Pipeline Buffer
      The following notation applies to approved lots 10, 11, 12, and 13:
      The allotment is within 200 metres of a gas pipeline easement. Enquiries regarding the
      future construction and operation of the pipeline should be directed to the gas pipeline
      licence holder - APA Group on 33236148 or PO Box 6569, Upper Mt Gravatt, QLD 4122.



REPORT
1.    PROPOSAL
The proposal seeks to subdivide 2 lots into 6 lots, being 4 fully serviced residential lots, a park lot
and a balance lot. The residential lots range in size from 701m² to 934m², the Park lot 6043m²
and the balance lot, 1.846ha. The balance lot encompasses 5 further residential lots proposed as
part of a separate application REC14/0008. A small area west of the eastern tributary is also
proposed to be subdivided for residential lots, via application REC13/0146. Both applications are
currently before Council. The lot layout is shown in Figure 1 below and included as
Attachment 1.




                                                                                      Page 46 of 134

Section 47

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                9 DECEMBER 2014




Figure 1 - Lot layout


Access to the lots will be via the new “Masonry Street” cul de sac, a continuation of an unformed
stub road off Cordwood Drive. All residential lots are sited on the eastern side of Masonry Street,
adjoin existing detached housing lots and have some views across to the park and to the eastern
and western tributaries.

The majority of the land is flood affected but all residential lots are Q100 immune. Stormwater
runoff from all lots drains to the street then is treated within a bio-retention system located in the
balance lot, before being released to the eastern tributary. The applicant proposes to rehabilitate
a 10m wide corridor for the full length and both sides of the waterway.

A footpath is proposed from the end of the cul de sac across the eastern tributary, connecting to
the adjoining proposed parkland which is part of a separate subdivision application REC13/0146.
A foot bridge proposed across the waterway within the park lot (Lot 100) is also forms part of the
stormwater detention strategy.

The applicant seeks to off-set the Park Infrastructure Contribution of this development by
providing a playground on adjoining land subject to development application REC13/0146 as
provided for under the Sustainable Planning Act 2009. An Infrastructure Agreement is proposed
to secure the playground in lieu of the Park Contribution.



                                                                                     Page 47 of 134

Section 48

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


2.    SITE DETAILS
2.1. Background
This application is essentially Stage 6 of a 6 staged development, with each stage submitted as
individual applications. Stage 5 (REC14/0008) is before Council and proposes 5 residential lots
accessed from the new ‘Masonry Road’ and is to be constructed concurrently, should this
application be approved. Details of the other stages are as follows:
    Stage 1 has been approved creating Lots 1, 2, 3, and 4 fronting Lake Macdonald Drive
      (REC13/0015)
    Stage 2 has been approved creating Lot’s 5, 6 and 7 fronting Wilgee Court (REC13/0095).
    Stage 3 (REC13/0146) is before Council and proposes 16 residential lots accessed from
      Blue Wren Place.
    Stage 4 (MCU13/0226 & REC13/0148) proposes 25 residential lots, is before Council and
      adjoins Stage 3.
2.2. Site Description
The site is traversed by two tributaries of Six Mile Creek, described as the eastern and western
tributaries. The location of the 2 tributaries is identified in Figure 2 below. Approximately 70% of
the land is flood affected, except for an area where a playground and some residential lots are
proposed as part of Stage 3, REC13/0146. The majority of the land is pasture except for a
narrow stand of riparian vegetation along the creek lines and a low lying area to the southwest
corner of the lot. The site slopes gently from the northern boundary toward the waterways.




Figure 2 - Tributary location




                                                                                   Page 48 of 134

Section 49

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           9 DECEMBER 2014


2.3. Surrounding Land Uses
The land adjoins Lake Macdonald Drive to the east, detached housing lots to the north, parkland
and undeveloped Detached Housing zoned land to the west and undeveloped Detached Housing
zoned land to the south. The land to the south is subject of a current subdivision application
REC13/0146. Figure 3 below shows the subject site and the surrounding land uses.




Figure 3 - Locality Plan



3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of the
following statutory planning instruments to the extent they are relevant to the development:
    State Planning Policies;
    the South East Queensland Regional Plan;
    State Planning Regulatory Provisions;
    any Structure Plan or Master Plan in place for declared areas;


                                                                               Page 49 of 134

Section 50

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


    any Preliminary Approval Overriding the Planning Scheme for the land;
    the Planning Scheme for the local government area; and
    any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
State Planning Policy

The proposal meets the Integrated Development Assessment requirements of State Planning
Policy 2014.
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
State Planning Regulatory Provisions
The following State Planning Regulatory Provisions apply to the application:
   SEQ Regional Plan Regulatory Provisions
The proposal is for an urban activity within the Urban Footprint and is consistent with the SEQ
Regional Plan Regulatory Provisions
3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Cooroy and Lake Macdonald Locality and is zoned Detached
Housing. The proposed subdivision for detached housing is identified as consistent within the
zone and is required to follow a code assessable application process.
Locality Provisions
Cooroy and Lake Macdonald Locality Code
The proposal provides a low density housing estate that offers residential amenity consistent with
the developed character of Cooroy. The lots overlook, adjoin or are near a proposed park, with
pedestrian and bicycle pathways provided from the end of the new road to an existing pathway
which connects to the trunk pathway along Lake Macdonald Drive. The proposal complies with
the provision of the Locality Code.
Land Use & Works Provisions
The following codes which regulate land use and design are most applicable to this application:
   Reconfiguring a Lot Code
   Landscaping Code
   Engineering Works Codes
The application has been assessed against each of the above codes. The pertinent issues
arising out of the assessment are discussed below:
Reconfiguring a Lot Code
Lot layout, Shape and Size
The residential lots are fully serviced and range in size from 654m² to 849m², complying with the
minimum lot size of 600m² required by the Code. The development offers a variety of lot sizes
and shapes in accordance with the provisions of the Code.




                                                                                  Page 50 of 134

Section 51

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                9 DECEMBER 2014


Earthworks
The lots are proposed to be re-profiled to provide level building platforms, which results in
retaining walls up to 1 metre above the natural surface level on some lots. This is preferable, as
the developer will undertake the cut and fill works rather than individual owners or builders, which
often results in inconsistent or sub-standard works and surface drainage issues. The fill is not for
flood immunity and will not adversely impact on the waterway course or riparian vegetation.
Open Space
The Code requires the development to provide open space in accordance with the following:
“Active Parkland or open space linkage to Active Parkland is provided in accordance with the
Priority Infrastructure Plan in Part 15;” or
“Park contributions are paid in accordance with the applicable infrastructure charging instrument.”
The applicant is providing passive parkland and is seeking to provide a playground within the
park on neighbouring land in lieu of Park Contributions for the development. This is proposed to
be delivered through an Infrastructure Agreement as part of the REC13/0146 and Councils
Priority Infrastructure Plan (PIP). Under the Sustainable Planning Act 2009, local parks and
equipment may be considered as trunk infrastructure and accordingly applicants are entitled to
an offset in their infrastructure charges. It is anticipated this will be addressed through the
Negotiated Decision process once the Infrastructure Agreement is finalised.
The proposal complies with the Reconfiguring a Lot Code.
Overlay Provisions
The following overlay codes are applicable to this application:
The following overlay codes are applicable to this application:
    Biodiversity Overlay Code – Riparian Buffer Area
    Natural Hazards Overlay Code – Flood Hazard Area
    Natural Resources Overlay Code – Extractive Resource Buffer Area
    Natural Resources Overlay Code – Gas Pipeline Buffer Area
Biodiversity Overlay Code
Approximately 50% of the site is affected by Riparian Buffer areas. The mapped buffers are not
centrally located over the watercourses and do not follow the meander of either tributary, but
range in width from zero to 20m from the top of bank from the eastern side of the eastern
tributary and up to 70m elsewhere. The applicant proposes to rehabilitate most of the riparian
buffers and 10m from the top of bank for the full length and both sides of the waterways,
including the portion of the waterway not affected by the Riparian Buffer.
A portion of the riparian buffer on the south western side of the eastern tributary is not being
rehabilitated, as a playground is proposed as part of the adjoining subdivision REC13/0146. All
lots are outside the riparian buffer and combined with the rehabilitation of the waterway, the
proposal complies with the provisions of the Biodiversity Overlay Code.
Natural Hazards Overlay – Flood Hazard area
Approximately 70% of the land is flood affected being below the level of a Q100 event. The
applicant provided a Flood Assessment that considers land areas subject to 4 current
development applications (being the subject application, REC13/0146, REC13/0148 and
REC14/0008). The proposed flood strategy is not a fully conventional detention system, using a
variety of storage methods to achieve a non-worsening at the site boundaries. The proposed
methods include deliberately “roughing” the flood ways by utilising riparian vegetation, excavating
side storage adjacent to the western tributary, a restrictive footbridge across the eastern tributary
and 2 bio basins. The Flood Assessment strategy’s modelling suggests that there is no risk to
surrounding residences and a proposed non-worsening at any flood affected boundary in a Q100
event.

                                                                                    Page 51 of 134

Section 52

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              9 DECEMBER 2014


An external peer review of the Flood Assessment confirmed the non-worsening to be accurate;
however, the peer review raised concerns with the unconventional flood strategy because
approximately 50% of the flood storage is achieved by “roughness” provided by flood plain
vegetation in the western tributary. This strategy is not supported as it poses too high a risk to
rely on vegetation for flood storage purposes. However, the flood strategy indicates that
conventional flood storage in the form of a bio retention basin and a restrictive footbridge across
the eastern tributary are sufficient to address the flooding requirements of this subdivision and
the adjoining application REC14/0008. Given the conventional flood strategy for this
development, the applicant has sufficiently demonstrated compliance with the Natural Hazards
Overlay Code.
Natural Resources Overlay – Extractive Resources Buffer
The proposed residential lots are within the Extractive Resources Buffer Area. The clay mining
activities and associated haulage roads are restricted to Neales Pit, which is located more than
550m away from the proposed lots. Figure 4 below identifies the location of Neales Pit in relation
to the subject site.




Figure 4 - Location of extractive resource



The area between the active pit and the proposed subdivision is elevated and naturally
vegetated. The hilly terrain provides a natural acoustic buffer for future residents.
The proposal will not limit the potential for the utilisation of the extractive resource given the
existing natural buffer.


                                                                                   Page 52 of 134

Section 53

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            9 DECEMBER 2014


Natural Resources Overlay – Gas Pipeline Buffer
The residential lots are within the 200 metre buffer area identified for the proposed Gatton to
Gympie Gas Pipeline. Figure 5 below shows the subject site in relation to the Gas Pipeline
easement.




Figure 5 - Gas Pipeline easement

The Natural Resources Overlay requires adequate separation between the use and the gas
pipeline, with the Probable Solution seeking no increase to the number of people living or
congregating within 200m of the gas pipeline. The buffer area was adopted within the planning
scheme as a precautionary mechanism to trigger further investigation with the licence holder, and
is not a total exclusion zone within which no development can occur.
The gas pipeline is not yet established within the easement and advice from the pipeline licence
holder, APA Pty Ltd who own and operate the high-pressure gas pipelines, is that it is still
unknown whether a gas pipeline will be constructed. APA Pty Ltd have indicated that any future
pipeline can be designed to avoid dangers associated with the future construction and operation
of a gas pipeline. In this regard, APA Pty Ltd had no objection to the recent approval of an
adjoining 22 lot subdivision providing no lots were created within the gas pipeline easement.
There are no lots being created within the easement as part of this application.
The proposal does not meet the Probable Solution S14.1 of the code, which requires no increase
to the number of people living or congregating within 200m of the gas pipeline. However, the
proposal is consistent with the Overall Outcomes of the Natural Resources Overlay Code, which
seeks development to be located to ‘avoid dangers with the pipeline…’ and ‘not adversely affect
the operations of the pipeline…’.
Given the proposed lots will be within the gas pipeline buffer, a property note is recommended
advising future owners of the gas pipeline easement and contact details of the licence holder.




                                                                                 Page 53 of 134

Section 54

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  9 DECEMBER 2014


4.     CONSULTATION
4.1. Referral
The application was forwarded to Unitywater and the following internal Council specialists:
     Engineering Officer
     Ecologist
     External peer review of the flood assessment by Hydrology & Water Management
       Consulting Pty Ltd.
Their assessment forms part of this report.
5.     CONCLUSION
The proposed lots offer suitable residential amenity having access to nearby parkland and
connectivity to the existing pedestrian network. The hilly terrain provides an adequate buffer
between the development and the extractive resource area and the location will not affect the
construction or operation of the gas pipeline. The proposal complies with the provisions of the
Planning Scheme and is recommended for approval subject to conditions.


Departments/Sections Consulted:

     Community Services                       X   Planning & Infrastructure
     Disaster Management & Public Order           Building & Plumbing Services
     Waste & Environmental Health                 DA Planning
     Community Facilities                         Strategic Land Use Planning
     Cultural Facilities                          Asset Design & Investigations
                                                  Asset Planning
                                                  Civil Operations
                                                  Environment

     Executive Office                             Corporate Services
     Community Engagement                         Finance
     Customer Service                             ICT
     Executive Support                            Procurement & Fleet
     Governance                                   Property & Facilities
     Human Resources                              Revenue Services




                                                                                     Page 54 of 134

Section 55

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   9 DECEMBER 2014
                                                                     ATTACHMENT 1




                                                                        Page 55 of 134

ATTACHMENT 1
            LUNETYPE LEGEND.                                                                                                                    [STORMWATER GRATE                                   —
            ene ng                                                                                                                            : ome ann           Prev
           -_————— BanKecTTON                                                                                                                 © STORMWATER MANHOLE
                    1                                                                                                                         a.
           —~ + ie                                                                                                                            @ roman
N                   cs                                 wie \                                 CORDWoop                                         —                   MAX WATTERSON
           —_——_ see                                               PARK                                                                        USHT Pour
           ——                                  Sy,                                                               DRIVE                          i                    + ASSOCIATES
           a                                       Se.                                                                                                              CONSULTING SURVEYORS
           ais es                                      Se               ,                                            4                                                   & PLANNERS
           = ee                                                  R      G     2                                                      pss
           Gananenes von:                                        é     BI                                                            !   Nw
           =a                                                  BOON                                                                 | cova[i*e>                    reeseeste
           See oe                                            ;   \e          .          :     Ww   Cire                            18     Nay                      Cooroy Qld 4563
                    as                                            Oy          \   \D  16     4 = \ 8    SOG Ears                    i     §  os                    Ph. (07) 54426121
           —— | Heeoaoee                      99                   rN          Rah   554d    SF NBO      G     re     a     sel     |     4 19                     Fox. (07) 54425125
           siinimictanciien SON             RP881300                x            el =   soe7   ®       849n)*   ]                 it~ ~~ j                         Email. [email protected]
     STAGE 6 TO BE COMPLETED PRIOR TO THE                            \\\          \     45 \a\5%        a                                              =
     COMMENCEMENT OF REC13-0146 - STAGE 3.                                 « 100)   eh 7azm28| < ENS                          1                       &           cient: WVALKEV PTY
                                                lk                       a \, 6043   mH \ \  \A    \ >         |           RP173883                  SS                LTD.
                                                 3                        3   ark    ef   645 \O   KS     6    mh                                    oO
                                               NMELORRA                   SIO              Wigtoe                                                  é
                                            wm                          .                       i     ©       Vo  B03            Se
                                              A j                            ‘i        Ng reine    ON       ky   1      Sep           .                           Project:
                                        <                                      4       Ne SRN       Baio   iff            ¥
                                      A       ) 3                             STAGE, a8 e\        SG      J.    24m"  {             \Y                            PLAN OF PROPOSED
                                     zs                       oo.                »         N             <0     GE39
                                   A                      ~                      Ml)    &    C3          Xe gen I,                  \     -                       RECONFIGURATION
                       retisnss§—/7f         Ht                                           \    Yh          3         oki sez DevEtormesit_/  wy                   OF 8 ON SP266743
                                S&S          j                    47           \      Pao       NAb    \ BEF   7 tm  ee         eT           oO                   (Being part of Lot 137
                               é            /                                   Weg               SS             ~a   ! i      uy   f
                            ie             i         /           1.846ha 9                          Ae               Hy            /       A]                     ON MCH978 & Lot 2
                         Z                 i                                      oh                    B           ¥           Wy        tS                      on RP173883).
                       4                   if                                     \ \             SAN ae          4y— ~       Lf q
                      é                          (                        224       WLI?       Uhr                   Leg ZAR    é      9                          COUNTY: MARCH
                                                                                     \ are ee                     ae        w      _ 7 a                          LOCAL GOVT: NOOSA SHIRE COUNCIL
         135                                                                         \\ Sy                  raise                 A    a_i                        LOCALITY: COOROY
   a                             A                                                     Sea
          ,           “                                                              SX        C        Ny     P=          a ora                                        .
   (see                              Vad                                                   SS    ss     Zt    Em           Z
  MCU13-0226 & REC13-0148)        Ki                      5                                  wh    PrN     J      SS     LG                                           38         Plan 1 of 1
                     ”            wh                   $P266734                              SS   SS                 A                                            Seales 1800
                    |                   fi        (see development application             ge         :          Zang         Je                                 piaZARD         Date: 14-10-14
                                        i             REC13-0146)                    A                           me         a                                      _.  PM 178243
                    a                  |                                             a    <                Z 4a           9                                       Origin: Rr 108.138
      ‘                               fi                                        oe                    a Se 7                                                      Cont.int: 0.5m   Ref:
        Sa]                            f                                           Kad          ae         1                                                                   10-3032AP7B4
       w  6     )                   ZF     L,                                                a"             YP                                                    NOTE:
              -7-#                    ;                                       S               ec ex     OL
       <     EmtkF)                e   j   [Pa                                        sp              waP                                                         This plan has been prepared for application
                         RESERVE OPEN SPACE: } ]          —     ip      3         gE .          cv?                                                               purposes only and may be subject to change.
            £                         t   AW                     oma fo          ao           pe          Q100 INUNDATION LINE PLOTTED FROM STORMWATER            Danene one ane. acves snow perenne
                             a   /    HY   if                            & CR       /      w                DETENTION & FLOODING REPORT PREPARED BY               —_ ee
              g                 Wey       {            fy                ts                                    BRISBANE STORMWATER MANAGEMENT
              “hs, 9        oh 00      oe PLACE                              vv                           Scale 1:1500 - Lengths are in Metres
                                             ;    ~ ER                                   tut    | of      |     {|   [|  |     {|  | | _{__J
                          RESETVE CORN ENCE 10    1 1,                                 168  O    1    30   45   60   75   90  105  120  135 + «4150 +~° 4165
                                           Sp            12              JS
                                                   279 39

                                                                                                                                                                                  Page 55 of 134

Section 56

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   9 DECEMBER 2014




                                                                     Page 56 of 134

\    LAA                       if                     j                  |    t   {        |         |        |
                BOTANICAL NAWE                                                    Va            EASTERN TRBUTIRY I |                   pion]                       f   1    fag      |                  Callaghan & Toth
                                                                                                                   oof                                   |        |                       a              _ ) Civil, Environmental &
                                                                                                            - ae he         |                  }         }         |        |        J     7   }               7    .
         |_____Calochlaeno dubia] Soft brocken        | =    | 26    35 _ |                                    \      = > —_—                            }        |        |         |        i          \| Hydraulic Engineers       —
     | Dienetle cserulo         | Common Flex tly     | 28 | 80 | 50_|                                                             mt                   |                                     !          i            0 BO 2305
         [_Dedones triquetra   | ___ Hop tush     ——=«d| -   | 26 | 35 _|                                a                           BA    Bx        ae of}                |                 | |)       TAI!   aves ster Seah Rone
         [_—sornio espero | Sowseage              ——*+t -    | 26 | 36 |                 :                                          Ba =                               wep                   FL]    SI      eran Sranosy Fx 547044
    [Temendra Hyertix           |   Creek Mot Russ    + | 28 | 80 | 100 |                                               [STAGE 5]    KIS pF                             ee ee |                                we count  comes
     [tomonde tengifefin        |    _—Mat Rush ——*| 28 | 80 | 100 |                                                 \              BASS                  STAGE 5                            UE a a oe
                                                                                                                 42                  Gg 3 OS                                                N   | [Gere Pe    ovgn (omy £4"
                   OO                                                                            ZONE C]                 STAGE 5b A        Bs                                               |
                                                                                   BASSE                                             i     BS                                                      cxoromd
         [___Ainie coersieo     |    Note Ginger     —*[- [27 | #0 |               i                                    A,    8       A    Ow             STACE 5 I                                SUNETED oY
      | Beckhousia citriodora | Lemon Scented Myre    | 20 | 26 | #0 |                      ttm SY eux To?                            A     ke                                                     WAX WATTERSION & ASSOCIATES
      | Boekrousio mytifolic |        Cinnamon myrtle | -   | 26 | #0 |                          48                      1am FROM eank TorlesA                                     RP173883        PHONE Se 426 121
         [__Breyrio obiongitoia |    Native Coffee    | -   | 26 | #0 |                                                                Ke    A
                                                                                                      ,                     STAGE 5]    WAWWA         [sTAGE 5                                 || PROPOSED 31 LOT SUBDMSION
         [___Homelonthus mutons |    Bleeding Heart __—|                                                                                 CAs         |                                  po                 ocDONALD
               Homolanthus_nutons     Bleeding Hear   [- |                         __ Greater setback                             7      Ba BO                                         oA          55 LAKE            ORIVE
     [Hibiscus heterophylus |          Wid Reselo     | -   | 26 | #0 |                                                      .            SN\S\e:                                      ©   5.   41 cooroy
                                                                                   AcTIMfrom top of bank.                     ‘om Frou aan Tore  WR    «10                              TK
     [ Welcleuce sibei | —SsSSSCSCSC~TOC*dt BC                                   PARKLA'See Conditions                           “         ey                        4                     ar
                                                                                                  iti                                      ®      S                                      we     ‘
          Po       tora                                  ae    28     400          685m REC 14/0008                                         Ke                  STAGE 6                    fe Fe [ cient
          a                                                                                                I                         :       SS                STAGE 6]                    ake
                                                                                     —,                     \\               Lo       »,     re      SRP                                    AEE
          a                                                                                    a             \                      ON       A       CR                                      Sa) | VALKEV PTY LTD
         [__‘Aphitonio excess —«|~SSC~CiR eA    SSCSC~*iSC“‘(WSOOC#CSCOO                            eA                  ZONE BS             BS         eA                      pH           /ES
       | Brachyehiton discolour | __Kurraiong         «i SSC«dY| SSC’ CS                                 “4,  Me                            Kg           oO                              A
      | Catistemon Solignus     | White bottle oush   |      | #0  |  #0 |                              EN                                 ms            es           12                     "a
                                                                                                                \             see             oR        bs                    :       5      ON
                    i     i             it                                                                     \                             ie           y                           6      s\ Sy
                                                                                                .          a             D5          -                69        TSace el     |               ~\°] | REVEGETATION, & REHABILTATION
         [_Crptocorye cbowte    | __Pepperberry Tree  | 15 | 40 |     #0 _|                                                         on         Ph                                             so} | MANAGEMENT. PLAN — EASTERN
      | Gryptocarye trplinervis | Three-veined Crpocora |   |      ‘| #0 _|                                                   \                    $                             STAGE 2 | © »|    UIRIBUTARY STAGE 5 & 6
                        ——               =                                                         \             \            i      .           LE OK                                        A
                                                                                                                                                               13                OMPLETED]
      | Evcotyptus grondis      |     Flooded um      +t    +t    «| ~   |                             ‘          ;                                                            :             ~
                                                                                                         N         \              Ki      10m FROM BANK TOP | STAGE 6 |
                                                                                       a                   .       NN            j                         Stace oy                5           | |} Lor 136 on wcH978
         [___Fieus coronote     | Greek Sondpiner Fig  |_——*(t 4040                              5            .     &                      \                                             ceed N|      pee
     [Ficus mocrophyla | Moreten Boy Fig              | 15 | 40 | #0 |                  STAGE 3                  .                                                  =          -        <325))|    Parish of TEWANTIN
       [—Frindersio schottions | __Bumpy Asn ||| ~#0_|                                  (FUTURE)                   }                    oo                                                  Seg] || County of MARCH
     | Goochidion ferdinondi    |     Cheese vee      +f    +t ——«dY~S   |                                        \        1,        CME                     REFER 10 1205-68         ~ Ss) | /| | SUNSHINE COAST COUNCIL
    [Gmelin teichherati         |      white beech    |__|         | #0 _|                28                               i              SST         P99    |For 10 BASN DETALS          eM  /        Wty of LAKE MocDONALD
                   °                                                                                                       ry             er ierhne                                               Loca ty
         [__— Grevites robust   |     _Siky Ook       +418 |      |   #0 _|          cone        FIPARDN WPPNG DOWNSTRENN  i                          PARK                                  a6
      | Jogera pseudornus |            Foombone       + |__| #0    |  #0 _|               :       OF THS PONT, STREAM BANK| RRS. +       ,              a                                    a
       | Lophostemon confertus |       Brush box      «4 ——=«dt |_|                 oe                                                       ~—_ [eounoe RPARAN OVERLAY                    |
             li                                                4                       .  3       USED FOR START OF BUFFER \ =          yo                                                     -
                                                                                     eet                              ;                     ——[—_                            F 10m (Sm FROM CENTRE
         [__Welicope eleryona   |     ‘Pink fvosio    «dt 18 | SAO                    ——                                                        i           a                                 ee | aD
        | Ropones veriebiis    |    _Nuttonwooa       |__|         | #0 _|          Se,                          —\                           “"ZONEC                   SS
                                                                                  --                   .                \,                     Jf                         —~\.                   a a a      a               et
      [_Sterculio quodrifge |‘ Peonut wee             «4  ——S«dSCSCSC~‘idC |     -                         a              Se                              Aen                wr          eed | ty BLES me
                    ~     7                                                                                                                                                           ee               f
    [Syzygium oustrale          |     Brush Chery     |     +f 40 |   #0 _|            iw             Te         TER EO                                       y                       f
                                                                                            SET           | ee eS oe oe                                       .                      |
[orm                                                 —~* 80520] 000 |                                     04        a     OP                                                     :               Pe Son for RGA            07
                                                                                                     oan                Reo")    GOON                                      a       ‘5m WIDE ON BOTH pop
                                                                                 )                   ¢       5               “Gc    3                      3                       BANKS FROM CENTRE} | [oT
              ND:                                                                                   §    3   5            LOK,                  ae        :          a             UNE OF CREEK   J
                       ZONE A — INFILL PLANTING ~ 1526m2                                           23°      a        Z         \ernn   A         Beas”        4                                   SD
          hs INFILL PLANTING REQUIRED FOR 30% OF AREA TO ACHIEVE 1 PLANT/1.5m.                           ee          ee?           ee)        oN   4
                       REMOVE WEEDS AS REQUIRED TO SECTION 5 OF PLAN 1225-90A                                 Ka    \        25  \  3          CO}      ’
                                                                                                        4        STAGE 1         2 Toe                        -_                                  TcOWPUTER DIRECTORY. ~*~=“‘*‘*~*
                                                                                                         Ze                  ~ te                  a   _
                       ZONE 8 — INFILL PLANTING — 2163m2                                             “    \                       ee \ y   —     ~        AN)                                      X:\YOBS\CT Projects it \1225 30 lots
          [III]        Riparian BUFFER AREA PLANT 70% OF AREAS TO                         ~       .        .   FCOMPLETED)        Ler          we        ©                                        fcke WacDonold Drive\Design\Current OWG-BASE |
                       ACHIEVE PLANT DENSITY OF 1 PLANT / 1.5m2.                       ORL            A     \   ¢      SN          Seer    Q
                       REMOVE WEEDS AS REQUIRED.                                  1B.    FE LAR        OB    NE     ohh,         a        Ww
                                                                                   BR a                   el      pep                   oN                                                              FOR APPROVAL
          [III         «zone c = Revecetarion puanine - 27522                      PE rh               8 £3    We §    5 ae       yor
                       RIPARIAN BUFFER AREA PLANT AREA TO ACHIEVE                  eu       LS -Pth            3 ie. eA Pp &
                       PLANT DENSITY OF 1 / 1.5m2. CURRENTLY                       oe        Sw PM            SN                                                                                         Sheet 30 of 35 sheets
                       RIPARIAN AREA FROM TOP OF BANK LIMITED TO                   7h          Se          Pe oe Us                                                                                      Growing number
                       GRASS, NATIVE VEGETATION PRESENT ON BANKS OF                11218739                fo i?
                       WATERWAY, SPRAY GRASS.                                     //     ~~                uy “30                                                                                       1225-89
                                                                                  he         .             Nha
          =  ==  =  == COUNCIL RIPARIAN BUFFER OVERLAY EXTENTS                   /'                         x mont                                                                                                    A
                                                                                 /

Section 57

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                            9 DECEMBER 2014


4                      COMBINED DEVELOPMENT APPLICATION REC13/0148 & MCU13/0226 FOR
                       RECONFIGURING A LOT (2 INTO 25 LOTS & PARK) AND A S242 PRELIMINARY
                       APPROVAL FOR DETACHED HOUSING IN THE COMMUNITY SERVICES ZONE AT
                       PEARSONS RD AND 55 LAKE MACDONALD DRIVE, COOROY
CUMENT IN FORMA TION




Author                         Development Planner, Jack Lewis
                               Planning & Infrastructure Department

Index                          ECM / Application / REC13/0148 & MCU13/0226

Attachments                    Nil



         APPLICATION DETAILS

         Applicant                         Valkev Pty Ltd C/- Max Watterson & Associates

         Owner                             The State of Queensland

         Proposal                          Combined application for Development Permit for Reconfiguring a Lot
                                           (2 into 25 and Park); and Preliminary Approval for Material Change of
                                           Use under Section 242 of the Sustainable Planning Act 2009 for
                                           development to be carried out in accordance with the Detached
                                           Housing Zone on Lot 135 on MCH978

         Properly Made Date                22 November 2013

         Information Request Date          13 December 2013

         Information Response Date         5 June 2014

         Decision Due Date                 18 December 2014

         Number of Submissions             20 Properly Made Submissions


         PROPERTY DETAILS

         Property Address                  Pearsons Rd & 55 Lake Macdonald Dr COOROY

         RP Description                    Lot 135 on MCH 978 & part of lot 5 on SP266731 (previously 136 on
                                           MCH 978 at the time of lodgement)

         Land Area                         2.02ha

         Existing Use of Land              Vacant


         STATUTORY DETAILS

         SEQRP Designation                 Urban Footprint

         Locality                          Cooroy & Lake Macdonald

         Zone                              Community Services and Detached Housing



                                                                                                 Page 57 of 134

Section 58

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   9 DECEMBER 2014



 Overlays                         Biodiversity – Riparian Buffer Area
                                  Natural Hazards – Flood Hazard

 Assessment Type                  Impact Assessable


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 9 December 2014 regarding Combined Application No. REC13/0148 &
MCU13/0226 for a Development Permit for Reconfiguring a Lot (3 into 27); and Preliminary
Approval for Material Change of Use under Section 242 of the Sustainable Planning Act 2009 for
development to be carried out in accordance with the Detached House zone, situated at
Pearsons Rd & 55 Lake Macdonald Dr Cooroy, and
A.   Approve the application in accordance with the following conditions:
     Preliminary Approval for Material Change of Use under Section 242 of the
     Sustainable Planning Act 2009 for development to be carried out in accordance with
     the Detached Housing Zone on Lot 135 on MCH978
     When Conditions must be Complied With
     1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with
            prior to the use commencing, and then compliance maintained at all times while the
            use continues.
     Approved Plans
     2.     Development undertaken in accordance with this approval must generally comply
            with the approved plans of development. The approved plans are listed in the
            following table and may be amended by these conditions.
             Plan No.              Rev.      Plan/Document Name                               Date
             10-3032AZ1A           -         Plan of Proposed Reconfiguration of Lot 135 on   06/05/2014
                                             MCH978 drawn by Max Watterson & Associates

     Nature and Extent of Approved Use
     3.     This approval overrides the planning scheme pursuant to s242 of the Sustainable
            Planning Act 2009 for the life of the approval to the extent that development on the
            site must comply with the development provisions for the Detached Housing zone
            within the Cooroy & Lake Macdonald Locality under The Noosa Plan.
     Development Permit for Reconfiguring a Lot (2 into 25 and Park)
     When Conditions Must Be Complied With
     1.     Unless otherwise stated, all works required by the conditions of this Decision Notice
            must be completed prior to submission of the subdivision plan to Council for
            compliance assessment.
     Approved Plans
     2.     Development undertaken in accordance with this approval must generally comply
            with the approved plans of development. The approved plans are listed in the
            following table unless otherwise amended by these conditions.
             Plan No.         Rev.        Plan/Document Name                               Date
             10-3032AZ1A      -           Plan of Proposed Reconfiguration of Lot 135 on   06/05/2014
                                          MCH978 drawn by Max Watterson & Associates



                                                                                       Page 58 of 134

Section 59

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              9 DECEMBER 2014


    3.   All lot numbering on the subdivision plan to be submitted to Council for compliance
         assessment must remain as shown on the Approved Plans.
    4.   The development must be undertaken and operated in a manner that causes no
         detrimental effect upon the amenity of the neighbourhood by reason of the creation of
         excessive noise, lighting nuisance or other emissions.
    Road & Park Names
    5.   The proposed names of roads and parks must be lodged with the application for a
         Development Permit for Operational Works. Names are to be:
         a.   Relevant to Australian, preferably local, history ,flora, fauna, culture, landscape
              or physical characteristics;
         b.   If used, personal names should commemorate persons who have contributed
              significantly to the development of the region; demonstrated outstanding levels
              of civic service; or achieved role-model status in the wider community or
              donated property or funds for community benefit; and be recognised in
              memoriam;
         c.   Park names should be unique within the locality;
         d.   Approval will not be given to a name that may construed as advertising, is more
              than one word, understanding that a geographic relationship such as Cooroy
              Mountain is permissible; is insensitive to diverse cultures and does not accord
              with community standards; and is not concise, easy to pronounce and spell and
              be without accent marks, apostrophes or hyphens.
    6.   All street signs on new roads (public and private) and parks shall be erected prior to
         works being accepted on maintenance.
    Security Bond
    7.   Security in the form of a cash bonds or trading bank guarantees to the sum of
         $20,000 must be submitted, to secure performance of all conditions of this approval,
         prior to the issue of a Development Permit for Operational Works. The cash bond or
         trading bank guarantee will be returned on performance of the conditions of approval
         less any costs incurred by Council in respect of enforcing performance of this permit.
    Boundary Encroachments
    8.   Certification must be submitted to Council from a Licensed Surveyor which certifies
         that:
         a.   All constructed access and roadworks (including associated fill batters and
              retaining walls) are fully contained within a dedicated reserve or registered
              easement.
         b.   All utility services and connections (eg. electricity, telecommunications, water,
              sewerage) are wholly located within the lot they serve or alternatively included
              within an easement.
         c.   All retaining walls and structures are fully contained within the lot they retain.
         d.   Any fill, including fill batters, are wholly contained within the subject site and not
              on adjacent properties.




                                                                                   Page 59 of 134

Section 60

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           9 DECEMBER 2014


    Landscaping
    9.    Landscaping in the road reserve is to be in accordance with PSP03 – Landscaping
          Plants & Guidelines and a properly prepared landscape plan, prepared by a suitably
          qualified Landscape Architect or Horticulturalist. The landscape plans are to be
          submitted and approved as part of the Operational Works incorporating landscaping.
          Where other permits for Operational Works for roads, drainage or access are
          required, the landscaping layout shall be based on approved drawings for those
          Operational Works.
    10.   The landscaping plans shall include:
          a.   A minimum 2m wide landscaping buffer along the Elm Street frontage, including
               a 2m truncation of the western property boundaries of lots 44-47 with Elm
               Street to establish screening vegetation on the site.
          b.   The densely planted buffer shall be located so as to allow for adequate sight
               lines, be clear of existing and proposed services within the road reserve,
               including the footpath, power lines (using appropriate species where
               applicable), bus stop design and to provide shade to pedestrians.
          c.   Retention of existing local origin trees located within the proposed parks, which
               are not required to be removed for the bioretention basin. An arborist must
               inspect the trees before and after works, to confirm they are not affected by any
               earthworks;
          d.   New roads are to be landscaped with a minimum of 1 street tree with a
               minimum pot size of 100 litres planted within the road reserve for every 8
               metres of road frontage including around the cul de sac, which provide a good-
               sized canopy to allow good shade once fully mature. Further to the native street
               trees recommended for planting within PSP03, Council also recommends the
               planting of 100 litre appropriate edible fruit tree species as part of the road
               reserve plantings and located at the end of each property boundary, to
               minimise impacts from construction and future driveways.
          e.   Tree plantings must maintain a minimum horizontal clearance a minimum
               distance of:
               i.     2m from stormwater catchpits;
               ii.    4m from overhead lighting; and
               iii.   Landscaping plants within these clearances must be low growing when
                      mature and suitable Council approved varieties.
    11.   Landscaping of the road reserve is to be completed in accordance with the approved
          landscaping plan prior to acceptance of the development ‘On Maintenance’ and
          maintained thereafter for a three (3) year period to the reasonable satisfaction of
          Council.
    Vegetation Protection & Weed Removal
    12.   Prior to issue of a Development Permit for Operational Works, an Ecological
          Restoration Plan and Specifications for the proposed park shall be approved by
          Council. The restoration plan shall include the following:
          a.   A plan indicating revegetation, including a species palette incorporating the
               species selection of only native indigenous species;
          b.   Measurable and achievable criteria on which the performance of the floristic
               and structural component of the re-vegetation strategy can be assessed
               annually over 3 years, including no weeds in the park area for all of the annual
               assessments and at the end of the re-vegetation period.


                                                                                Page 60 of 134

Section 61

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


          c.   Control of all weed species listed in the following standards and legislation:
               i.    Declared plants under the Land Protection (Pest and Stock Route
                     Management) Act 2002 and sub-ordinate Regulation 2003.
               ii.   Council listed Environmental Weeds, exotic grasses and other plants
                     identified in writing by Council.
          d.   All rehabilitation and revegetation must be completed prior to Council
               endorsement of the Plan of Survey.
          e.   The area identified as Park on the Approved Plans must be dedicated to the
               Crown as a reserve for Park purposes.
               The land to be dedicated is “non-trunk infrastructure” for the purposes of the
               Sustainable Planning Act 2009.
    ENGINEERING
    External Works
    13.   Elm Street must be upgraded for the length of its frontage to the subject site. The
          works must be undertaken in accordance with an Operational Works approval and
          must include in particular:
          a.   construction of kerb and channelling (OR table drain) and underground
               stormwater drainage for the full frontage of the development site;
          b.   installation of street, pathway and bus stop lighting; and
          c.   widening and sealing of the existing road pavement to include the bus stop and
               the entry and departure tapers.
               The Elm St pathway infrastructure is imposed pursuant to s646 of the
               Sustainable Planning Act 2009 being necessary trunk infrastructure identified
               by Council’s LGIP to service the development. All other infrastructure is
               imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-
               trunk infrastructure.
    14.   The new road must join smoothly with the existing formation of Blue Wren Court. The
          works must be undertaken in accordance with an Operational Works approval and be
          designed and constructed in accordance with Council’s Planning Scheme Policy 5 –
          Engineering Design Standards - Roads, Drainage and Earthworks. The works must
          include in particular:
          a.   provision of sight distances adequate for the design speed of the road;
          b.   relocation of the existing footpath, services and property accesses; and
          c.   retention of all existing parking facilities on Blue Wren Court.
          This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
          being non-trunk infrastructure.
    Bus Stop
    15.   The developer must design and construct a bus stop on the Elm Street frontage of
          the site. The works must be undertaken in accordance with an Operational Works
          approval and must include in particular:
          a.   The proposed bus stop is to be “Indented” and be in accordance with the
               current TransLink Public Transport Infrastructure Manual. The bus stop must
               contain all Mandatory and Preferred components as stated in the manual, and
               be constructed in accordance with the new Noosa Council Custom Design
               Rural Bus Shelter; and



                                                                                  Page 61 of 134

Section 62

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


          b.   The design for the bus stop shall consider a Pedestrian Refuge Island and a
               coupled bus stop (indented but unsheltered) on the opposite side of Elm Street
               for future construction.
          This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
          being non-trunk infrastructure.
    Blue Wren Close Road Works
    16.   The developer must construct 4 indented carparking bays on the northern side of
          Blue Wren Close between the development site and Lake Macdonald Drive with the
          final location determined in conjunction with Council. The works must be undertaken
          in accordance with an Operational Works approval.
    17.   This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
          being non-trunk infrastructure.
    New Roads
    18.   The new roads shown on the Approved Plans must be constructed in accordance
          with the conditions of this Decision Notice and dedicated as road reserve at no cost
          to Council.
    19.   This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
          being non-trunk infrastructure.
    20.   The new roads as shown on the Approved Plans must be designed and constructed
          in accordance with Council’s Planning Scheme Policy 5 – Engineering Design
          Standards - Roads, Drainage and Earthworks. The works must be undertaken in
          accordance with an Operational Works approval and must include in particular:
          a.   Reserve and formation widths to an “Access Road” standard;
          b.   sealing, drainage, kerbing and channelling;
          c.   construction of pedestrian footpaths in accordance with the conditions of this
               Decision Notice;
          d.   installation of street and pathway lighting; and
          e.   For roads terminating in a cul-de-sac, a circular turning area of sufficient size to
               accommodate the single forward motion turn of a Waste Collection Vehicle
               (WCV) clear of private driveways on-street parking and speed control devices.
    21.   A temporary sealed turnaround facility must be constructed at the end of each road
          left temporarily incomplete as a result of the development staging. The temporary
          turnaround facility must be in accordance with an Operational Works approval and
          must be of sufficient size to accommodate the 3-point turn manoeuvre of a Waste
          Collection Vehicle (WCV).
          This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
          being non-trunk infrastructure.
    Property Access and Driveways
    22.   A residential driveway must be constructed to Lots 43-47. The residential driveway
          for Lot 44 must extend for the full length of the access handle. The works must be
          undertaken in accordance with an Operational Works approval.
    23.   Vehicle access to Lots 44-46 is limited to the new road only. A clause must be
          included in the contract of sale for Lots 44-46 which prohibits vehicle access being
          taken from Elm Street.




                                                                                  Page 62 of 134

Section 63

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              9 DECEMBER 2014


    Pedestrian and Bicycle Facilities
    24.   Pedestrian and bicycle facilities must be provided for the development. The works
          must be undertaken in accordance with an Operational Works approval and must
          include in particular:
          a.    a new 2 metre wide footpath within the road verge for the entire length of the
                site’s frontage to Elm Street;
          b.    a 2 metre wide footpath along southern side of the new road and extending to
                the existing pathway in Blue Wren Close;
          c.    a 2 metre wide path across the frontages of proposed lots 33 and 34;
          d.    a 2 metre wide footpath between lots 46 and 47 extending from the new path in
                Elm Street to the path in the new road; and
          e.    Pram crossings where applicable.
          This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
          being non-trunk infrastructure.
    Stormwater Drainage
    25.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval and the Queensland Urban Drainage Manual, and must include in
          particular:
          a.    the works generally as shown on drawing number 1225-33 revision A and dated
                06/14 prepared by Callaghan and Toth;
          b.    provision of kerb adapters for all new lots; and
          c.    extension of the site stormwater system to accommodate stormwater from
                external to the site, including registration of drainage easements.
          This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
          being non-trunk infrastructure.
    26.   All elements of the stormwater drainage system, including any necessary scour
          protection, must be wholly contained within the subject site, existing and/or new road
          reserves.
    Easements
    27.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    28.   All easements must be designed in accordance with the planning scheme and
          granted at no cost to the Grantee. Where the Grantee is Council or a service
          authority, the easement documentation must be in accordance with the Grantee’s
          standard easement terms. Draft easement documentation must be submitted to
          Council for endorsement.
    29.   All works must be kept clear of any existing or proposed easements on the subject
          land, unless agreed otherwise in writing by the Grantee.
    Earthworks and Retaining Walls
    30.   All fill and associated batters must be contained entirely within the subject site unless
          written permission from the respective landowner(s) is provided to Council.
    31.   All earthworks must be undertaken in accordance with the provisions of Australian
          Standard AS3798: Guidelines on Earthworks for Commercial and Residential
          Developments.

                                                                                  Page 63 of 134

Section 64

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


    32.   Where the development involves excavation or filling over, or adjacent to, drainage,
          water supply or sewerage infrastructure, all access chamber surface levels must be
          adjusted to provide a freeboard of 100mm above the finished ground surface level.
    33.   All retaining walls must be designed and constructed in accordance with the planning
          scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
          retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
          with a commercial grade safety fence.
    Electricity and Telecommunication Services
    34.   Underground reticulated electricity and telecommunication services must be provided
          to each lot in accordance with an approval for Operational Works and the standards
          and requirements of the relevant service provider.
    35.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    36.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and
          all applicable legislation at the time of construction.
    Street and Pathway Lighting
    37.   Street lighting and pathway lighting throughout the subdivision shall have a high
          energy efficient rating to the reasonable satisfaction of Council and shall generally be
          provided in accordance with the principles of Council’s Planning Scheme Policy 5.
    UNITYWATER
    The following Unitywater conditions are applied in accordance with the South East
    Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
    Connections Policy. The conditions below form part of a water connection aspect which are
    taken to be a water approval for a staged connection. Any future applications must be
    made to Unitywater under South East Queensland (Distribution and Retail) Restructuring
    Act 2009. Unitywater can be contacted at [email protected]
    Water and Sewerage
    38.   Reticulated water must be provided to each lot in the development. This must
          include:
          a.   Ensuring that internal water pipes are wholly contained within the lot they will
               serve.
          b.   An approved water meter for each lot in accordance with Unitywater and SEQ
               Standard Drawings.
          c.   Provision of a water service from the existing 100mm diameter water main
               located in Blue Wren Place to service each lot within the proposed subdivision
               in accordance with Unitywater and SEQ Standard Drawings.
          d.   Water meters must be located on alternative boundaries to electrical pillars.
          e.   The fire-fighting demand on Unitywater’s water supply system from the
               development must not exceed 15 litres per second.
    39.   Reticulated sewerage must be provided to each lot in the development. This must
          include:
          a.   Ensuring sewer house drains are wholly contained within the Lot they will serve.
          b.   Provision of sewerage infrastructure to within the property boundaries of each
               lot within the proposed subdivision.

                                                                                  Page 64 of 134

Section 65

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


    40.   A minimum clearance of 1.5 metres must be maintained between Unitywater sewers
          and proposed building envelopes, buildings and other structures
    41.   Easements of between 3 and 10 metres must be provided over all Unitywater sewers
          located within property boundaries in accordance with the SEQ standards.
          Easements shall be centred over the pipe. Easement terms shall be the most current
          registered dealing held by the Department of Natural Resources & Mines and shall
          not be altered or amended.
    42.   Stormwater retention systems and gross pollutant traps must maintain a minimum
          clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure
    43.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
          Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
          Landscaping plants within these clearances must be low growing when mature and
          suitable Unitywater approved varieties.
    44.   Construction works undertaken in the vicinity of Unitywater water supply or sewerage
          infrastructure must not adversely affect the integrity of the infrastructure. All costs
          associated with repair, replacement or alteration of infrastructure must be met by the
          applicant.
    ADVISORY NOTES
    The following notes are included for guidance and information purposes only and do not
    form part of the assessment manager conditions:
    Aboriginal Cultural Heritage Act 2003
    1.    There may be a requirement to establish a Cultural Heritage Management Plan
          and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH
          Act).
          The ACH Act establishes a cultural heritage duty of care which provides that: “A
          person who carries out an activity must take all reasonable and practicable measures
          to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to
          fail to comply with the duty of care. Substantial monetary penalties may apply to
          individuals or corporations breaching this duty of care. Injunctions may also be issued
          by the Land and Resources Tribunal, and the Minister administering the ACH Act can
          also issue stop orders for an activity that is harming or is likely to harm Aboriginal
          cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
          You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any
          obligations under the ACH Act.
    Co-ordination of Operational Works Assessment
    2.    Additional application fees apply to Operational Work applications where the different
          aspects of the works are lodged separately. Significant savings in application fees will
          result if all works are lodged in a single application.
    Preparation of a Preliminary Construction Management Plan
    3.    A preliminary Construction Management Plan must be submitted with the Operational
          Works application and must address the following:
          a.   traffic management during all aspects of the construction phase including:
               i.    a Traffic Management Control Plan in accordance with the Manual of
                     Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                     and traffic control measures prior to construction.
               ii.   maintenance of safe pedestrian access for the areas affected by the
                     works during and after daily construction has ceased.


                                                                                  Page 65 of 134

Section 66

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              9 DECEMBER 2014


                 iii.   proposed fencing to the site during the construction phase of the
                        development.
                 iv.    approval of the Traffic Management Control Plan by the Department of
                        Transport and Main Roads (DTMR) for any works on State controlled
                        roads.
                 v.     provision for worker car parking.
         b.      maintenance and protection of water quality and existing drainage lines through
                 the construction site, through the implementation of appropriate erosion and
                 sediment control measures
         c.      works programme identifying key components of the works and their respective
                 durations
         d.      establishment of a communication protocol with the general public, adjoining
                 owners, emergency services and local businesses to advise of agreed
                 construction times, impacts on traffic, services and other relevant issues
         e.      identification of complaint management procedures including:
                 i.     contact details for the on-site manager
                 ii.    dispute resolution procedures
         f.      details on the location of external fill sites/sources, the haulage route, type of
                 vehicle to be utilised during filling operations and frequency of usage. NB any
                 damage to the existing road system as a result of haulage operations shall be
                 fully repaired at the applicant’s expense
         g.      it is acknowledged that the preliminary Construction Management Plan will be a
                 draft document requiring finalisation upon appointment of the Principal
                 Contractor employed to construct the works and a final document will be
                 required to be submitted at the Pre-Start Meeting for the project.
    Property Notes
    4.   The following property notes shall be placed against the relevant lots advising the
         following:
               A Rail and Traffic Noise Study has been undertaken for new buildings on this
                 property. New buildings shall be constructed in accordance with the
                 conclusions of the study and the Queensland Development Codes (QDC) MP
                 4.4 – Building in a Transport Corridor (or equivalent codes/guidelines at the
                 time of building).
               No direct vehicular access to Elm Street is permitted.
    Development Compliance Inspection
    5.   Prior to the commencement of the use, please contact Council to arrange a
         Development Compliance Inspection.
    Unitywater
    6.   Connection to the Unitywater live water supply and live sewerage system must be
         undertaken by Unitywater at the applicant’s cost.
    Infrastructure Charges
    7.   This Development Permit triggers an “Infrastructure Charge Notice” to be issued in
         for Council “trunk” infrastructure in accordance with Council’s “Adopted Infrastructure
         Charges Resolution” under the State Planning Regulatory Provision (Adopted
         Charges) and the Sustainable Planning Act 2009.


                                                                                  Page 66 of 134

Section 67

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                9 DECEMBER 2014


B.     Find the following are sufficient grounds to justify the decision despite the conflict with the
       Planning Scheme:
       1.    The development provides for a practical infill development to support a growing
             urban settlement of permanent residents in Cooroy.
       2.    The proposal is compatible with the residential zoned land surrounding the site;
       3.    The proposed residential uses are compatible with the constrained site access
             provided via Blue Wren Place, with more intensive development unlikely to be
             suitable.
       4.    The use of the site for residential uses will not unduly impact Cooroy’s ability to
             provide for a range of community uses.

REPORT
1.   PROPOSAL
The application seeks a Development Permit to Reconfigure a Lot (2 into 25 lots & park) and a
Preliminary Approval for a Material Change of Use application made under Section 242 of the
Sustainable Planning Act to allow future development to be carried out in accordance with the
Detached Housing zone. The site is within the Community Services zone and the development of
detached houses is currently inconsistent within the zone. The application is before Council
because it seeks to override the provisions of The Noosa Plan.
The proposed subdivision design involves the creation of a new cul-de-sac connecting to Blue
Wren Place. The layout takes into account the future development rights and access associated
with the adjoining lot to the north (Lot 3 on RP113733). No access is proposed to Elm Street, due
to traffic concerns relating to the site’s proximity to the intersection of Elm Street and Pearsons
Road.
The proposal includes re-profiling the site to direct some stormwater flows towards the waterway
located to the east, while maintaining flows to the undeveloped site to the north. A bio-retention
basin is proposed within the park adjacent to the waterway. The locality and proposal plans are
included as Figures 1 and 2 below.




Figure.1 Locality Plan

                                                                                     Page 67 of 134

Section 68

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014




Figure.2 Proposal Plan


2.   SITE DETAILS
2.1. Background
There are no existing development approvals over the site.

The 2ha site is currently owned by the State Government and was previously used as a gravel
storage reserve. The applicant indicates that the site has not been used for this purpose for more
than 20 years and has substantially revegetated.

The State previously offered the land to Sunshine Coast Council (SCC) for potential acquisition.
SCC did not purchase the land, as it was considered that Cooroy was generally well catered for
in terms of community and recreation zoned land. Other development approvals for aged care
facilities in Cooroy are also understood to have influenced SCC’s decision.

It is also noted that, as part of the Revenue Share Policy for Local Government Operational Trust
Land, the land has been available for disposal since mid-2008 and the proceeds of the sale are
to be shared equally between the State and Council.




                                                                                  Page 68 of 134

Section 69

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              9 DECEMBER 2014


2.2. Site Description
The 2ha site is located just over 1km to the north of the Cooroy railway station. The site is
currently vegetated by a mix of regrowth native and exotic vegetation. An existing sewer line runs
along the eastern boundary of the site, which is clear of vegetation.

As the site was previously used as a gravel reserve, the natural landform has been substantially
modified, with a depression area within the middle of the site draining towards the north and east.

2.3. Surrounding Land Uses
The site is surrounded by undeveloped Detached Housing zoned lots to the east and north. To
the south of the site is a 5,621m2 lot within the Semi Attached Housing zone (152 Elm St), while
across Elm Street to the west is the railway corridor. A zoning map of the surrounding properties
is shown below:




Figure.3 Surrounding Zone Map




                                                                                   Page 69 of 134

Section 70

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              9 DECEMBER 2014


The applicant also has 3 other concurrent Reconfiguring a Lot applications for subdivision of lot 5
SP266731 & lot 8 SP26674 and provides an indicative subdivision plan of the adjoining site at 2
Pearsons Rd, identifying possible road access arrangements. A map of the relevant applications
and indicative future subdivision design is shown below.




Figure.4 Surrounding Subdivision Plan




Figure.5 Indicative Subdivision Plan for 2 Pearsons Rd

                                                                                   Page 70 of 134

Section 71

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  9 DECEMBER 2014


3.        ASSESSMENT
3.1. Preliminary Approval Assessment Framework
The assessment for a Preliminary Approval under Section 242 of the Sustainable Planning Act
2009 must have regard to the relevant State and local planning instruments, the effect the
proposed variations would have on any right of a submitter for following applications, and any
referral agency response.
The application must also demonstrate there are sufficient grounds in the public interest to
approve the development despite the inconsistency with the Planning Scheme. Further comment
about the applicant’s grounds is provided in section 3.3.
3.2. State and Other Statutory Instruments
State Planning Policy

The proposal meets the Interim Development Assessment requirements as described in Part E of
the State Planning Policy (July 2014).

South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
State Planning Regulatory Provisions
The South East Queensland (SEQ) Regional Plan Regulatory Provisions apply to the application.
The proposal is for an urban activity within the Urban Footprint and is consistent with the SEQ
Regional Plan Regulatory Provisions.
The SEQ Koala State Planning Regulatory Provisions are not applicable to the site.
3.3. The Noosa Plan
The site is located in the Cooroy & Lake Macdonald Locality and is zoned Community Services.
The proposal to subdivide and develop detached houses on the lots is inconsistent with the zone
provisions and is required to follow an impact assessable application process.
Cooroy & Lake Macdonald Locality Provisions
The relevant Overall Outcomes for the Cooroy & Lake Macdonald Locality Code applicable to the
development are outlined below:
     b)   The Cooroy and Lake Macdonald Locality support a growing urban and rural settlement of
          permanent residents;
     k)   The town of Cooroy provides a range of community services, schools, medical facilities,
          sporting and recreational facilities, which service the hinterland and beyond;
     x)   For the Community Services Zone—land committed or planned for community
          purposes—
           i    is protected and managed to enable the efficient and timely delivery of community
                services; and
           ii   is consistent with the indoor recreation, education, health, social and safety needs of
                the local community, including people with special needs, such as the elderly,
                children, low-income earners and disabled persons;
The applicant contends that there are sufficient grounds to approve the application despite the
inconsistency, as the zoning does not reflect the changing circumstances relevant to the
surrounding area, including:
 The Community Services zoning is no longer needed to protect the site for use as a gravel
   reserve;

                                                                                       Page 71 of 134

Section 72

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


 The proposal is within the planned capacity of the surrounding infrastructure networks
   (including roads);
 Allowing new land for housing is in the public interest, as it contributes to supply and would
   help generate new jobs in the construction industry;
 The development is compatible with surrounding residential uses; and
 There are several other sites in the area used for community services and there is no
   identified shortage of services in the area.
An assessment of the issues associated with the proposed change of land use follows below.
History
Historically the land was included in the “Special Use” zone in the 1985 Planning Scheme, given
its purpose as a gravel reserve. The 1992 Cooroy Development Control Plan also included it in
the “Special Uses & Public Facilities” designation. The 1997 Strategic Plan and The Noosa Plan
(2007) included the land in the “Community Services” designation/zone.
Location
Council’s Principal Strategic Planner indicates that the optimum use of the property is likely to be
residential. This is mostly due to the site being physically removed from the town centre, and not
suitable for a community function that supports the operation of the business centre and existing
community services (such as halls, public services, meeting venues and existing indoor social,
recreation or entertainment functions).

Other than an ancillary dwelling unit, the only residential use consistent within the Community
Services zone is Multiple Housing Type 3 - Retirement and Special Needs, meaning housing for
persons who are aged, being nursed or convalescing. Such uses are typically difficult to locate
and the model preferred by service providers relies on large sites to accommodate integrated
facilities with both independent living units and aged care beds.

The site is constrained in that it is surrounded by existing and future housing, restricting its
suitability for community uses that include regular night time or weekend noise. Furthermore, due
to the site’s proximity to the Pearsons Rd and Elm St intersection, any development is restricted
to access only from Blue Wren Place. This road has only been constructed to cater for a limited
amount of traffic, and any community uses that generated a high level of traffic is likely to
adversely impact on residents amenity.
Need
The applicant contends there are other sites within Cooroy zoned for Community Services and
there is no shortage of land for community uses. However, they have not provided a detailed
assessment to support this or otherwise demonstrate an overriding need for housing to be
developed on the Community Service zoned site.

Despite not providing an analysis, it is noted that there have been two significant development
approvals on other Community Services zoned land parcels within Cooroy for residential aged
care facilities, being:
     On the 23 June 2010, Council issued an approval to RSL Care (ref: 132007.2398.01) for a
       mix of 179 independent living units and 120 aged care beds on the 11.9 ha site, situated at
       4 Lamonts Rd & 19 Trading Post Rd. The development is to be located less than 100m to
       the north of the subject site and the approval has a currency until June 2016.
     On the 29 April 2013, an approval (ref: MCU13/0030) was given for a 23 bed extension to
       the Kabara Aged Care Facility at 20 Topaz St. This approval results in the facility being
       able to accommodate a total of 94 aged care beds and is located 3km to the south of the
       subject site. The approval has a currency until April 2017.


                                                                                   Page 72 of 134

Section 73

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


Council’s Principal Strategic Planner considers that, in the context of Cooroy’s population and the
scale of recent development approvals for Retirement & Special Needs Housing in the immediate
area, it is reasonable to assume that these other developments should meet the need for this
residential use for a 20 year planning horizon.
Overall it is considered there are sufficient grounds to support the proposal, which align with the
Overall Outcomes of the Cooroy & Lake Macdonald Locality Code, being:
1.   The development provides for a practical infill development to support a growing urban
     settlement of permanent residents in Cooroy.
2.   The proposal is compatible with the residential zoned land surrounding the site.
3.   The proposed residential uses are compatible with the constrained site access provided via
     Blue Wren Place, with more intensive development unlikely to be suitable.
4.   The use of the site for residential uses will not unduly impact Cooroy’s ability to provide for
     a range of community uses.
Land Use & Works Provisions
The application has been assessed against each of The Noosa Plan codes. The pertinent issues
arising out of the assessment are discussed below:
Reconfiguring a Lot Code
The code seeks new lots that are appropriate for their intended use, and new residential
development consistent with the developed character of the neighbourhood. The site is
predominantly surrounded by existing residential zoned lots, which require minimum lot sizes of
600m2 in the Detached Housing zone and 800m2 in the Semi Attached Housing zone.
The proposed subdivision design provides for a logical extension of the existing, proposed and
future residential developments accessed via Blue Wren Place. The design provides for a variety
of lot sizes greater than 600m2 and promotes pedestrian accessibility, connecting to the trunk
pathway network along Elm Street.
Due to the site’s history as a gravel storage yard, the topography is irregular. The applicant
indicates earthworks and clearing are required to ensure adequate roads, drainage and other
infrastructure can be constructed to service the new lots. The proposed design takes into
consideration existing watercourses traversing the site and ensures the flow of these are
maintained to adjoining properties, consistent with the outcomes sought by the code.
Park Provision
The Specific Outcomes of the code require provision of public open space & active recreation
areas designed and located to be easily accessible, contribute to the legibility and character of
the locality and cost effective to maintain. The lower sections of the site, adjacent the existing
waterway are to be included as a revegetated park for drainage and environment purposes. This
part of the site is included within the Riparian Buffer Area on the Biodiversity Overlay Maps, and
the design avoids new development (except for a bioretention basin) within this mapped buffer
area.
The applicant does not propose any active recreation areas as part of this subdivision, instead,
proposes a new recreation park on the adjacent site to the east, as part of development
application REC13/0146 (1 into 16 lots), which is less than 100m from the site.
Road & Rail Corridor
A Specific Outcome of the code seeks lots for residential developments are not subject to high
traffic noise levels from the major road network or rail corridors. The applicant includes an
acoustic report prepared by Renzo Tonin Ron Rumble & Associates, recommending a series of
2.3-2.5m high noise barriers be constructed along the Elm Street frontage of the site to reduce
the noise levels below 60dBA to all lots.


                                                                                   Page 73 of 134

Section 74

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                9 DECEMBER 2014


The report also recommends controls on future buildings be implemented, to reduce noise
associated with the railway, including treatment for glazing, walls, doors, floors and roofing to the
facades of new houses. The measures are not considered too onerous a burden for future
owners and are consistent with the Queensland Development Codes (QDC) MP 4.4 – Building in
a Transport Corridor.
It is recommended that a 2m strip of land within proposed lots 44-47, adjacent to Elm Street be
dedicated as reserve, to establish screening vegetation and minimise the visual impacts of the
fence when viewed from the Major Road Network.
Access from Blue Wren Place
Blue Wren Place adjoins Lake Macdonald Drive and includes 11 existing houses, which directly
access the road. The road reserve is 15m wide with a 6m carriageway (kerb to kerb). Planning
Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks describes
this road type as an ‘Access Road’ capable of catering for up to 60 lots or 600 vpd.
The cumulative number of vehicles proposed to use this road as a result of the existing,
proposed and future developments is expressed within the table below:

 Residential Development                Number of lots

 Existing                               11

 REC13/0146 (1 into 16)                 16

 Current application (2 into 25)        25

 Future concept for 2 Pearsons Rd       10

 Total                                  62

With the future concept development of 2 Pearsons Rd, the total number of lots proposed for the
ultimate development of the catchment for Blue Wren Place marginally exceeds the maximum
described in PSP 5 for an “Access Road” (6.0m kerb to kerb – 15m reserve). The next higher
category of Road within the policy is a “Local Road” (8.0m kerb to kerb – 17m reserve), which
has the capacity to cater for 200 lots.
Council’s Senior Development Engineer does not consider it reasonable for the developer to
provide the “Local Road” formation in the existing part of Blue Wren Court, due to the limited
reserve width and the impacts on existing services and residents. To reduce potential parking
impacts, it is reasonable to require the developer to provide a number (potentially 4) of indented
parking bays within the existing road reserve of Blue Wren Court.
Engineering Works Codes
As part of the Trading Post Rd approval for RSL Care (132007.2398.01), conditions were
imposed for the developer to construct a bus stop in front of the subject site. While this
development is yet to proceed, the requirement for a bus stop within this location is still
warranted and is also conditioned as part of this application.
The developer will be required to provide a new path in the Elm Street frontage of the site
together with a new pathway connection through the site connecting Elm Street to the existing
pathway in Blue Wren Place.
Natural Hazards (Flood) Overlay Code
All proposed residential lots and associated infrastructure are located outside of the 1%AEP
Flood Hazard Area. Access to the lots is via Blue Wren Place, which has been designed to be
trafficable in a Q100 event. The development therefore meets the outcomes of the code.



                                                                                    Page 74 of 134

Section 75

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


Biodiversity Overlay (Riparian Buffer Area)
A small portion of the proposed new road and the bio retention basins are within the mapped
Riparian Buffer Area. The code seeks that vegetation of local origin within these areas is
conserved to ensure its ongoing contribution to the natural resources by avoiding edge effects
and incompatible uses in the riparian zone.
The development will require clearing approximately 3 existing native trees within the mapped
buffer area. The clearing is required to accommodate the bio retention basin, which is designed
to treat the water from the development site. This infrastructure is located above the 1%AEP
flood line and is more than 15m from the top of the existing waterway bank.
The location of the basin within this mapped buffer does not conflict with the outcomes of the
code, as there is opportunity for substantial revegetation and rehabilitation of the existing
waterway and associated ecosystem.


4.   CONSULTATION


4.1. IDAS Referral Agencies
The application was referred to the State Assessment Referral Agency (SARA) in relation to the
following concurrence matter:
Department of Transport & Main Roads
The Department is a concurrence agency for development adjoining a Main Road (Elm Street)
and near a railway corridor. The State Assessment Referral Agency responded on the 14 May
2014, requiring conditions be imposed on any development permit, including:
   The erection of a 2.5m noise barrier between the houses and Elm Street in accordance
     with the Renzo Tonin Ron Rumble Acoustic Consultants study; and
   No vehicular access permitted between the subject site and Pearsons Rd/Elm Street.


4.2. Other Referrals
The application was forwarded to Unitywater and the following specialists:
   Coordinator Engineering.
   Principal Strategic Planner.
   Community Development Coordinator.
   Senior Ecologist.
   External Flood Specialist.


4.3. Public Notification
The application was publicly notified for 15 business days in accordance with the Sustainable
Planning Act 2009. 10 properly made submissions were received. The following table provides a
summary and assessment of the issues raised by submitters.




                                                                                Page 75 of 134

Section 76

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   9 DECEMBER 2014



Issues                                           Comments

Detached houses are inconsistent within the      Despite detached housing being inconsistent with the
zone.                                            Community Services zone, it is considered there are
                                                 sufficient grounds to approve the development.

The site is listed as High Value Bushland for    The site is not mapped within a ‘Koala Assessable
koalas.                                          Development Area’ by the SEQ Koala State Planning
                                                 Regulatory Provisions.
                                                 The Noosa Plan’s Biodiversity overlay also does not
                                                 map the site as being a Koala Habitat Areas.

Blue Wren Place is not constructed to a          Blue Wren Place is constructed to a Local Access
standard able to cater for the increased         standard, which is considered suitable to cater for the
number of houses. There is also no overflow      proposed    development.      Conditions   are     also
parking available in Blue Wren Place and this    recommended for the developer to provide for indented
development will make the existing traffic       parking bays within the existing road reserve of Blue
problems worse.                                  Wren Place.

The new road accessing Elm Street is not         The new road reserve area is 5m wide in size and is
consistent with the concurrence agency           proposed for pedestrian access only. This is consistent
response.                                        with the Department of Transport and Main Roads
                                                 concurrence agency conditions restricting vehicular
                                                 access to Elm Street.

Inadequate active recreational areas provided    As part of the adjacent subdivision design, 685m 2 of
on the site.                                     active parkland is proposed to be built by the developer.
                                                 This is located less than 100m from the subject site.

Noise barriers along Elm Street will not work.   Renzo Tonin Ron Rumble Acoustic Consultants have
                                                 undertaken a Rail and Traffic Noise Study for the
                                                 proposed subdivision design. Modelling within the study
                                                 finds that a series of 2.3m-2.5m high fences along the
                                                 Elm St frontage will reduce the traffic noise below
                                                 60dBA for all lowset houses within the development.
                                                 As part of the Queensland Development Codes (QDC)
                                                 MP 4.4 – Building in a Transport Corridor any new
                                                 building work will need to achieve compliance with the
                                                 code and will be assessed as part of the building
                                                 certification process.

Potential flood impacts on the adjoining creek   The proposed bioretention and detention basins will
and associated water surge problems              result in no additional flows from the site.
downstream.

Potential scouring impacts on 2 Pearsons         Conditions are recommended for all elements of the
Road as a result of the development.             stormwater drainage system, including any necessary
                                                 scour protection, to be wholly contained within the
                                                 subject site.




                                                                                        Page 76 of 134

Section 77

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     9 DECEMBER 2014



    Issues                                       Comments

    Loss of native fauna habitat.                The proposal requires the clearing of 3 trees within the
                                                 mapped riparian buffer area of the Biodiversity Overlay
                                                 for the creation of the bioretention basin.
                                                 A condition is required for the 750m 2 of drainage and
                                                 environmental park area adjacent to the waterway to be
                                                 rehabilitated and revegetated, providing a vegetated
                                                 corridor through the development. This rehabilitation
                                                 offsets the removal of the trees for the basin.
                                                 The balance of the site is not mapped as either
                                                 Environmental     Enhancement  or  Environmental
                                                 Protection vegetation.

    Potential stormwater impacts on 154 Elm St   The site is to be regraded to drain to the new road and
                                                 the preliminary stormwater design includes inter-lot
                                                 drainage servicing 154 Elm Street.

5.       CONCLUSION
In deciding whether to issue a Preliminary Approval to develop detached houses on the 2ha
Community Service zoned land in Cooroy, there must be sufficient grounds in the public’s
interest to allow for the development.
The applicant has not provided a detailed need analysis to justify the loss of the Community
Service zoned land. Despite this, there are reasonable grounds due to the site’s access
constraints, the location away from the Business Centre and the adjoining residential zones.
Further, since zoning the site for Community Services in 2007, there have been other significant
development approvals for Retirement & Special Needs Housing in the immediate area. These
are likely to meet the need for this residential use for the next 20 year planning horizon.
The proposed development for detached housing is within the existing urban footprint and
provides for a practical infill development within an already established and planned residential
area of Cooroy. While the proposed use raises a conflict with the Cooroy and Lake Macdonald
Locality Code, it is considered that the following grounds are sufficient to support the proposal:
1.   The development provides for a practical infill development to support a growing urban
     settlement of permanent residents in Cooroy.
2.   The proposal is compatible with the residential zoned land surrounding the site.
3.   The proposed residential uses are compatible with the constrained site access provided via
     Blue Wren Place, with more intensive development unlikely to be suitable.
4.   The use of the site for residential uses will not unduly impact Cooroy’s ability to provide for
     a range of community uses.
The application is therefore recommended for approval, subject to conditions.

Departments/Sections Consulted:
x     Community Services                         x   Planning & Infrastructure
      Disaster Management & Public Order         x   Building & Plumbing Services
      Waste & Environmental Health               x   DA Planning
x     Community Facilities                       x   Strategic Land Use Planning
      Cultural Facilities                        x   Asset Design & Investigations
                                                     Asset Planning
                                                     Civil Operations
                                                     Environment
                                                 x
      Executive Office                               Corporate Services




                                                                                        Page 77 of 134

Section 78

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                             9 DECEMBER 2014


5                         DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR AN
                          UNDEFINED USE - TEMPORARY SHORT-TERM SELF-CONTAINED RV STOP AT 154
                          HOLTS ROAD, COOROY - MCU14/0060
DOCUMENT IN FOR MATI ON




Author                            Coordinator Planning, Denis Wallace
                                  Planning & Infrastructure Department

Index                             ECM/ Application/ MCU14/0060

Attachments                       1.   Proposal Plan



         APPLICATION DETAILS

         Applicant                            J Morrow
                                              C/- Max Watterson & Associates
         Proposal                             Material Change of Use - Undefined Use - Temporary Short-Term Self-
                                              Contained RV Stop

         Properly Made Date                   4 August 2014

         Information Request Date             21 August 2014

         Information Response Date            3 October 2014

         Decision Due Date                    27 November 2014 (First Decision Period)

         Number of Submissions                4 Properly Made Submissions


         PROPERTY DETAILS

         Property Address                     154 Holts Road, Cooroy Qld 4563

         RP Description                       Lot 2 RP 893989

         Land Area                            2.36ha

         Existing Use of Land                 Nursery and Detached House


         STATUTORY DETAILS

         SEQRP Designation                    Regional Landscape and Rural Production Area

         Locality                             Cooroy & Lake Macdonald

         Zone                                 Rural

         Overlays                             Medium Bushfire Hazard Area, Extractive Resource Buffer Area &
                                              Water Supply Catchment Area
         Assessment Type                      Impact




                                                                                                 Page 78 of 134

Section 79

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              9 DECEMBER 2014


RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Organisation
Committee Meeting dated 9 December 2014 regarding Application No. MCU14/0060 for a
Temporary Development Permit for a Temporary Short Term Self-Contained RV Stop situated at
154 Holts Road, Cooroy and:
A.   Approve the application in accordance with the following conditions:
     PLANNING

     When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
           prior to the use commencing, and then compliance maintained at all times while the
           use continues.
     Approved Plans
     2.    Development undertaken in accordance with this approval must generally comply
           with the approved plans of development. The approved plans are listed below and as
           may be amended by the conditions herein.
            Plan No.         Rev.   Plan/Document Name                                Date
            13-3461AB        -      Plan of Proposed (Temporary) Short-Term, Self-    04/07/14
                                    Contained RV Stop at Lot 2 on RP893989 prepared
                                    by Max Watterson + Associates
     Nature and Extent of Approved Use
     3.    No more than 20 Recreational Vehicles (RV’s)(caravans, motorhomes or the like)
           may stay at the site at any one time.
     4.    Visitor stays shall not exceed 14 consecutive days.
     5.    All RV’s shall be fully self-contained and must retain all grey water and black water
           via holding tanks.
     6.    No on-site release of grey water is permitted.
     Visitor Education
     7.    Visitors must be advised of the following requirements:
           a.    No on-site release of grey water or other waste
           b.    Location of nearest dump point and potable water supply
           c.    All dogs must be on a leash when walked in the area and must be restrained at
                 all times during the stopover period
           d.    Owners must pick up and collect their dogs’ faeces
           e.    Consideration be given for residents and road users when walking in the area
           f.    Noise must be minimised after 8.30pm
     Street Identification
     8.    The street address of the development must be clearly visible from the Holts Road
           frontage of the site by the provision of a street number.
     9.    Access to the site must be clearly signed with a sign of up to 1m 2.




                                                                                  Page 79 of 134

Section 80

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           9 DECEMBER 2014


    Temporary Development Approval
    10.    This temporary development approval expires in two (2) years on 18 December 2016.
           Upon request, Council may provide written consent to extend the approval on an
           annual basis having regard to the status of the adjacent mining lease, the degree of
           compliance with the approval conditions herein and the complaint history relating to
           the development.
    ENGINEERING
    General
    11.    The developer must meet any costs to repair damage to any Council or public asset
           during construction, where damage is a result of the development works. Damage to
           assets must be repaired immediately where it creates a hazard to the community. In
           circumstances where the damage does not create a hazard to the community, it must
           be repaired immediately on completion of the works associated with the
           development. A condition report including photographs of the frontage of the site
           should be completed and kept for future reference and made available to Council if
           required.
    Driveway and Internal Roads
    12.    Sealed crossovers must be provided for the two accesses to the site in compliance
           with the following:
           a.   IPWEAQ Standard Drawing SEQ R-056.
           b.   Designed and certified by a RPEQ
           c.   Have a minimum width of 4.0m at the property front boundary line.
    13.    Internal roads must:
           a.   Have a minimum width of 3.0m and widened where necessary to provide
                passing opportunities for vehicles using the site.
           b.   Be all weather construction (sealed or compacted gravel) suitable for the
                anticipated traffic and load of vehicles using the site.
           c.   Be provided with adequate stormwater drainage that prevents undue erosion or
                surface deformation or settlement.
     Excavation and Filling
     14.    All earthworks shall be undertaken in accordance with the provisions of AS 3798
            “Guidelines on Earthworks for Commercial and Residential Developments”.
     Stormwater Drainage
     15.    Stormwater drainage works and water quality devices and measures must be
            provided and maintained in accordance with the approved engineering plans and in
            compliance with the Stormwater Quality Management Plan included in the
            Stormwater Drainage for No 154 Holts Rd Cooroy Report dated 26 September
            2014, Ref No: 1432 IWMP.doc, prepared by Callaghan & Toth. Particular attention
            must be given to the construction and maintenance regime of the two proposed
            Sediment Basins. The drainage works and basins must be certified by an RPEQ on
            completion.
     16.    Stormwater runoff from the development must be disposed of on-site without
            causing scour or damage to the subject site, the dam or any adjoining property.




                                                                               Page 80 of 134

Section 81

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


    Erosion and Sediment Control
    17.   The developer must ensure non-essential, short or long term, exposure of soil is
          prevented by minimising the duration of soil exposure to adverse weather conditions
          and effectively turf or stabilise any exposed area without delay and prior to rainfall
          occurring.
    18.   The developer must ensure sediment does not leave the site or enter onto adjoining
          properties or the dam on the site due to surface runoff on tyres of vehicles and/or
          machinery. The developer must implement appropriate approved erosion and
          sediment control measures throughout the site during all phases of construction and
          the ongoing operation of the site.
    19.   Prior to the completion of the development, all site surfaces must be effectively
          stabilised using methods which have achieved effective short-term stabilisation and
          which will continue to achieve effective stabilisation in the medium to long-term. For
          the purpose of this condition, an effectively stabilised surface is defined as one that
          does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill
          or gully erosion or lead to sedimentation, or lead to water contamination.
    20.   The supervising engineer and applicant are responsible to ensure that the
          implemented, short and long term, erosion controls measures are effective and
          regularly maintained to cater for all weather conditions.
    After Completion of Works
    21.   Prior to the commencement of use and the engineering certification of the works by
          the supervising engineer (RPEQ), a combined inspection of the completed works by
          Council’s Inspector/s and the supervising engineer is required. Please contact
          Council on 5329 6244 to arrange the inspection.
    Waste
    22.   The developer must provide adequate waste storage and disposal facilities.
    23.   Refuse bins must not be placed on the existing road formation of Holts Road. A
          suitably sized all-weather pad shall be constructed adjacent the driveway entrances
          to provide for waste bin collection.
    ADVISORY NOTES
    Engineering Certification
    1.    Council has undertaken an audit check of the submitted plans in relation to the
          proposed works. A detailed check of the calculations and drawings has not been
          undertaken, as they have been certified by a RPEQ. The RPEQ bears full
          responsibility for all aspects of the engineering design. Council reserves the right to
          require further amendments and/or additions at a later date should design errors
          become apparent.
    General Environmental Advisory Note
    2.    The Environmental Protection Act 1994 states that a person must not carry out any
          activity that causes, or is likely to cause, environmental harm unless the person takes
          all reasonable and practicable measures to prevent or minimise the harm.
          Environmental harm includes environmental nuisance. In this regard persons and
          entities, involved in the civil, earthworks, construction and landscaping phases of this
          development are to adhere to their ‘general environmental duty’ to minimise the risk
          of causing environmental harm.




                                                                                    Page 81 of 134

Section 82

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


     Aboriginal Cultural Heritage Act 2003
     3.    There may be a requirement to establish a Cultural Heritage Management Plan
           and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
           The ACH Act establishes a cultural heritage duty of care which provides that: “A
           person who carries out an activity must take all reasonable and practicable measures
           to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to
           fail to comply with the duty of care. Substantial monetary penalties may apply to
           individuals or corporations breaching this duty of care. Injunctions may also be
           issued by the Land and Resources Tribunal, and the Minister administering the Act
           can also issue stop orders for an activity that is harming or is likely to harm Aboriginal
           cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
           You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to
           discuss any obligations under the ACH Act.
B.   Find the following are sufficient grounds to justify the decision despite the conflict with the
     planning scheme:
     1.    The development will help to address a significant need for low-cost accommodation
           for self-contained RV travellers in the Noosa area.
     2.    The development will provide economic and community benefit through increased
           visitation to the Noosa hinterland.
     3.    The development provides for the adaptive re-use of the existing nursery on the site.
     4.    The site’s location near the Bruce Highway is appropriate to cater for self-contained
           RV traveller’s needs.
     5.    The development will not have significant adverse impacts on residential amenity or
           water supply quality.



REPORT
1.   PROPOSAL
The application seeks a Development Permit for a Material Change of Use of premises for a
Recreational Vehicle (RV) Stop, which is an undefined use under The Noosa Plan. The site is an
approved wholesale nursery that currently operates well below its former capacity. The applicant
proposes to allow up to 20 self-contained RV’s stay on the premises for short term stays. In
order to overcome planning constraints relating to a mining lease for the dormant Nandroya
Quarry pit on adjoining land, the applicant seeks a temporary approval of 2 years only with an
annual renewal process thereafter.

Self-contained RV’s are to be parked within 10m x 20m spaces on existing gravel pads
throughout the site. No new infrastructure is proposed, other than stormwater management
improvements. The application states that RV’s staying at the site must be fully self-contained
and have their own water supply, ablutions and storage for grey and black water.

A copy of the proposal plans is included as Attachment 1. The application is before Council due
to the fact that the use is not defined by The Noosa Plan and raises planning conflicts.




                                                                                    Page 82 of 134

Section 83

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            9 DECEMBER 2014


2.   SITE DETAILS
2.1. Background
The existing wholesale nursery use on the site was approved by Council in 1997 (07818TP).

A series of pre-lodgement meetings, discussions and site inspections were held with the
applicant, commencing in September 2013. Council staff advised of the significant impediments
to gaining a self-contained RV Park approval on the site, in particular that the site is within a
mapped extractive resource buffer area to the adjacent quarry and therefore visitor
accommodation development was not consistent with The Noosa Plan. Other important issues
raised with the applicant included water quality, residential amenity and need.

The applicant commenced the use in approximately May 2014 prior to lodging a development
application. The site is listed as “Cooroy No Worries Caravan and Motor Home Parking” on the
Youcamp.com website, which states the site caters for “self-contained caravans, motor homes,
5th wheelers and small clubs”. Council received complaints and the applicant was advised to
cease the use or seek a development approval. Complainants have been advised that the
applicant has now sought a development permit and the matter is pending a decision on the
application.
2.2. Site Description
The site is generally rectangular in shape, has an area of 2.36ha and a 250m frontage to Holts
Road. The land falls approximately 10m from west to east but is almost entirely terraced with
gravel pads created for the nursery. Limited areas of mounded or sloping garden beds occur
around the perimeter of the site and between the terraced areas. A small house sits in the
middle of the lot and is surrounded by lawn and gardens. A caretaker’s cabin and number of
sheds associated with the nursery have also been established.

A dam constructed within an existing local drainage line sits at the bottom of the site along the
eastern boundary. The majority of the site drains into the dam via existing swales and pipework.
Overflow from the dam flows to the north toward the continuation of Holts Road parallel with the
highway. The site is located within the southern extent of the water supply catchment area for
Lake Macdonald.
2.3. Surrounding Land Uses
The site is surrounded by rural and rural settlement properties on a mix of lot sizes generally
containing a single detached house. Nandroya quarry pit (shale and clay) is on adjoining land to
the north. The quarry has recently been re-profiled and substantially rehabilitated and is not
being actively quarried but a mining lease remains in place.

The Bruce Highway is approximately 250m to the east of the site, with underpass and access
ramps located 1km to the north along Holts Road. The highway access and egress is currently
being upgraded as part of the highway upgrade works. A State owned industrial estate, known
as Nandroya Estate, sits 600m to the north between the site and the highway access. It
comprises 8 large industrial lots that are yet to be developed, though temporary engineering
offices associated with the highway upgrade currently occupy one lot.

A locality plan and aerial photograph of the site is shown below. Approximately 14 vans or RVs
are visible on the site in the photograph taken in September 2014.




                                                                                 Page 83 of 134

Section 84

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   9 DECEMBER 2014




Figure 1 – Locality Map




Figure 2 – Aerial Photograph


                                                      Page 84 of 134

Section 85

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              9 DECEMBER 2014


3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of the
following statutory planning instruments to the extent they are relevant to the development:
   State Planning Policies;
   the South East Queensland Regional Plan;
   State Planning Regulatory Provisions;
   the Planning Scheme for the local government area; and
    any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory instruments relevant to this application are discussed in the sections that
follow.
3.2. State and Other Statutory Instruments
State Planning Policies

The application is consistent with the interim development assessment requirements of the State
Planning Policy 2014.
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Regional Landscape and Rural Production Area of the SEQ
Regional Plan. Assessment against the SEQRP regulatory provisions are not triggered because
the proposed short-term accommodation is for less than 300 people. The proposal is otherwise
generally consistent with the regional policies of the SEQ Regional Plan.
3.3. Planning Scheme – The Noosa Plan
The subject site is located in the Cooroy and Lake Macdonald Locality and is zoned Rural under
The Noosa Plan. The planning scheme does not currently list an RV stop as an identified land
use. A caravan park is the most comparable defined use but is associated with communal
facilities and the right to include cabins and the like. As such, it is considered appropriate that
the use is deemed undefined and subject to an impact assessable application process.
Locality Provisions
As the use is undefined, it is not specifically contemplated or provided for in the Cooroy and Lake
Macdonald Locality Code’s provisions for the Rural zone. However, the Code does provide
some guidance for the assessment of new uses in rural areas. The primary considerations for
new uses under the Code are:
   Whether the use can operate on the site while maintaining the amenity of surrounding
     residents
   Whether the use can avoid reverse amenity impacts on the lawful operation of the quarry
     on adjacent land if it recommences
   Whether the use has locational requirements that support its establishment on the
     proposed site
These are discussed in the following section.
Land Use, Works and Overlay Provisions
The following codes are most applicable to this application:
   Visitor Accommodation Code
   Engineering Works Codes
   Landscaping Code


                                                                                   Page 85 of 134

The text continues on section 86.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.