PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
ENGINEERING
Earthworks
4. All earthworks must be in compliance with the relevant codes and policies of The
Noosa Plan (particularly the Earthworks Code) and undertaken in accordance with a
Development Permit for Operational Works. The application for operational works for
earthworks shall also include the details of any associated drainage works (eg
swales, scour protection, stormwater pipes work).
5. Suitable construction management measures must be put in place prior to the
commencement of development works on this site and for all stages of works, the
measures must address in particular:
a. Traffic management during all aspects of the construction phase including:
i. Temporary signage and traffic control measures in accordance with
Manual of Uniform Traffic Control Devices (MUTCD) to provide warning to
drivers and road users of any safety hazard or changes to traffic
conditions due to the proposed works.
ii. Details on the location of imported fill sources, the haulage route, type of
vehicle to be utilised during filling operations and frequency of usage.
NOTE: any damage to the existing road system as a result of haulage
operations must be fully repaired at the applicant’s expense
b. Effective procedures and measures to protect the Riparian Buffer and existing
natural flora and fauna.
c. Effective procedures and measures to minimise adverse environmental impact
on other properties and roads users including noise and dust emission.
d. Establishment of a communication protocol with the adjoining owners and any
other affected parties to advise of construction times, impacts on traffic and
services and any other relevant issues.
Stormwater Drainage
6. Stormwater runoff from the development areas must be disposed off in a controlled
manner on site without causing erosion or adverse impacts on the environment
and/or the existing drainage conditions on other properties (eg by concentrating or
diverting additional flows and/or causing additional ponding on other properties) .
7. The development works must include stormwater management and treatments
measures/devices that:
a. Are designed in accordance with the current version of the Deemed to Comply
Solutions by Water By Design; or
b. Are designed to treat stormwater to achieve 80% Reduction in Total Suspended
Solids, 60% Reduction in Total Phosphorous and 45% Reduction in Total
Nitrogen prior to discharge from the site compared to if there was no water
pollutant mitigation incorporated into the design.
A Development Permit for Operational Works for stormwater management shall be
required.
Advisory Notes
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
6855.
Page 116 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.