Skip to the record
Accept no imitations.

Original source · versioned page text

2014-12-09 Planning & Organisation Committee Agenda

of 134

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                9 DECEMBER 2014


Earthworks
The lots are proposed to be re-profiled to provide level building platforms, which results in
retaining walls up to 1 metre above the natural surface level on some lots. This is preferable as
the developer will undertake the cut and fill works rather than individual owners or builders, which
often results in inconsistent or sub-standard works and surface drainage issues. The fill is not for
flood immunity and will not adversely impact on the watercourses or riparian vegetation.
Open Space
The Code requires the development to provide open space in accordance with the following:
“Active Parkland or open space linkage to Active Parkland is provided in accordance with the
Priority Infrastructure Plan in Part 15;” or
“Park contributions are paid in accordance with the applicable infrastructure charging instrument.”
The applicant is seeking to provide active parkland (a playground) in lieu of the Park
Contributions for the following developments:
    REC13/0146 (subject application)
    REC13/0148 (1 into 26 lots)
    REC14/0008 (2 into 6 lots)
    REC14/0009 (2 into 6 lots)
Under the Sustainable Planning Act 2009, local parks and equipment may be considered as
trunk infrastructure and accordingly applicants are entitled to an offset in their infrastructure
charges.
The proposed playground is not trunk infrastructure as it is not currently identified in Council’s
Priority Infrastructure Plan (PIP). The PIP sets out trunk infrastructure planning throughout the
Noosa Shire.
Public recreational land east of the railway line is currently limited to drainage reserves, a natural
amenity reserve and small undeveloped local parks. Figure 4 below shows the location of these
parks and reserves.




Figure 4 - Parks and Reserves in the Cooroy area


                                                                                     Page 16 of 134
Log in to download the original file

2014-12-09 Planning & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.