Original source · versioned page text
2014-12-09 Planning & Organisation Committee Agenda
The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
Boundary Encroachments
7. Certification must be submitted to Council from a Licensed Surveyor which certifies that:
a. all constructed access and roadworks (including associated fill batters and retaining
walls) are fully contained within a dedicated reserve or registered easement
b. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included within
an easement
c. all retaining walls and structures are fully contained within the lot they retain
d. any fill, including fill batters, are wholly contained within the subject site and not on
adjacent properties
Water & Sewer Connections
8. An underground connection to reticulated water and sewerage must be provided to each lot
in accordance with the standards and requirements of Northern SEQ Distributor–Retailer
Authority (Unitywater).
9. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to each lot.
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to
the issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council reserves the
right to call upon the bond or guaranteed sum to effect compliance with conditions.
Landscaping & Ecology
11. Lot 15 must be removed from within the Riparian Buffer Overlay of The Noosa Plan and the
boundary setback a minimum of 10 metres from the top of bank, whichever is the greater.
The area removed from the lot must be rehabilitated in accordance with the conditions of
this Decision Notice.
12. Landscaping and rehabilitation works must be undertaken in accordance with an
Operational Works approval and Planning Scheme Policy - PSP 3 Landscaping Plants and
Guidelines and must include an ecological rehabilitation and landscaping plan, prepared by
a suitably qualified person* and must include in particular:
a. the area to be rehabilitated and re-vegetated must be generally in accordance with
the approved Revegetation & Rehabilitation Management Plan – Eastern Tributary
Stage 5 & 6
b. details of the treatment to all batters, armoury, plantings, weed treatment, location of
services/utilities and rehabilitation.
c. a maintenance period of no less than 3 years
d. a species palette and densities table incorporating the species selection of only
native indigenous species
e. measurable and achievable criteria on which the performance of the floristic and
structural component of the re-vegetation strategy can be assessed annually over
three years, including no weeds at the end of the re-vegetation period
f. provision of 1 street tree with a minimum pot size of 100 litres planted within the road
reserve for every 8 metres of road frontage including around the cul de sac
Page 24 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.