2014-12-09 Planning & Organisation Committee Agenda

of 134

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


21.   Detailed life cycle costing must be prepared for the stormwater quality treatment system by
      a Registered Professional Engineer Queensland and submitted to Council prior to the issue
      of any Development Permit for Operational Works.Stormwater and Flood Management
22.   Stormwater and flood management for the development must be provided generally in
      accordance with the provisions identified for the eastern tributary in the Stormwater and
      Flooding Report prepared by BSM and dated 15 September 2014. The works must be
      undertaken in accordance with an Operational Works approval and must include in
      particular:
      a.    a non-worsening at the site boundaries
      b.    certification must be submitted to Council at the completion of works from an RPEQ
            which certifies that the development has met the stormwater and flooding
            requirements of this Decision Notice
Electricity and Telecommunication Services
23.   Underground reticulated electricity and telecommunication services must be provided to
      each lot in accordance with an approval for Operational Works and the standards and
      requirements of the relevant service provider.
24.   Unless otherwise stipulated by telecommunications legislation at the time of construction,
      the development must be provided with all necessary conduits, pits and pipes to
      accommodate the future connection of optic fibre technology telecommunications.
25.   Certification must be submitted to Council from all relevant service providers which certifies
      that the development has met the requirements of this Decision Notice and all applicable
      legislation at the time of construction.
Easements
26.   Easements for inter-allotment drainage must be provided within Lots 11, and 14-16 which
      encompass the constructed drainage structures.
27.   An easement for drainage purposes must be registered against the title of proposed Lot 10
      in favour of Council over the land area identified as the eastern portion of proposed Lot 10
      with extents defined as the full frontage to Wilgee Court to the east, Lot 5 SP266743 to the
      north, extending along the southern boundary of proposed Lot 13 in REC14/0009 and the
      road reserve boundary to the eastern boundary of proposed Lot 100 in REC14/0009, along
      the southern boundary of Lot 100 in REC14/0009, then perpendicular to the southern
      boundary of proposed Lot 10 and returning to Wilgee Court.                   Draft easement
      documentation must be submitted to Council for endorsement
28.   Unless otherwise agreed in writing by the relevant service provider, any public or third party
      infrastructure located on the subject site must be placed within an easement registered
      against the title of the property.
29.   All easements must be designed in accordance with the planning scheme and granted at
      no cost to the Grantee. Where the Grantee is Council or a service authority, the easement
      documentation must be in accordance with the Grantee’s standard easement terms. Draft
      easement documentation must be submitted to Council for endorsement.
30.   All works must be kept clear of any existing or proposed easements on the subject land,
      unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
31.   All fill and associated batters must be undertaken in accordance with an Operational Works
      approval, and contained entirely within the subject site.




                                                                                    Page 27 of 134
Log in to download the original file

2014-12-09 Planning & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.