2014-12-09 Planning & Organisation Committee Agenda

of 134

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               9 DECEMBER 2014


    6.    All street signs on new roads (public and private) and parks must be erected prior to
          works being accepted on maintenance.
    Boundary Encroachments
    7.    Certification must be submitted to Council from a Licensed Surveyor which certifies
          that:
          a.   all constructed access and roadworks (including associated fill batters and
               retaining walls) are fully contained within a dedicated reserve or registered
               easement
          b.   all utility services and connections (eg. electricity, telecommunications, water,
               sewerage) are wholly located within the lot they serve or alternatively included
               within an easement
          c.   all retaining walls and structures are fully contained within the lot they retain
          d.   any fill, including fill batters, are wholly contained within the subject site and not
               on adjacent properties
    Water & Sewer Connections
    8.    An underground connection to reticulated water and sewerage must be provided to
          each lot in accordance with the standards and requirements of Northern SEQ
          Distributor–Retailer Authority (Unitywater).
    9.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground connection to
          reticulated water and sewerage has been provided to each lot.
    Performance Bond
    10.   Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
          must be submitted to Council, to secure performance of all conditions of this
          approval, prior to the issue of a Development Permit for Operational Works. The cash
          bond or trading bank guarantee will be returned on performance of the conditions of
          approval less any costs incurred by Council in respect of enforcing performance of
          this permit. Council reserves the right to call upon the bond or guaranteed sum to
          effect compliance with conditions.
    Landscaping & Ecology
    11.   Landscaping and rehabilitation works must be undertaken in accordance with an
          Operational Works approval and Planning Scheme Policy - PSP 3 Landscaping
          Plants and Guidelines. An ecological rehabilitation and landscaping plan must be
          submitted, prepared by a suitably qualified person* and must include in particular:
          a.   the area to be rehabilitated and re-vegetated must be generally in accordance
               with the approved Revegetation & Rehabilitation Management Plan – Eastern
               Tributary Stage 5 & 6 and
          b.   details of the treatment to all batters, armoury, plantings, weed treatment,
               location of services/utilities and rehabilitation.
          c.   a maintenance period of no less than 3 years
          d.   a species palette and densities table incorporating the species selection of only
               native indigenous species
          e.   measurable and achievable criteria on which the performance of the floristic
               and structural component of the re-vegetation strategy can be assessed
               annually over three years, including no weeds at the end of the re-vegetation
               period.


                                                                                    Page 41 of 134
Log in to download the original file

2014-12-09 Planning & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.