PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
Temporary Development Approval
10. This temporary development approval expires in two (2) years on 18 December 2016.
Upon request, Council may provide written consent to extend the approval on an
annual basis having regard to the status of the adjacent mining lease, the degree of
compliance with the approval conditions herein and the complaint history relating to
the development.
ENGINEERING
General
11. The developer must meet any costs to repair damage to any Council or public asset
during construction, where damage is a result of the development works. Damage to
assets must be repaired immediately where it creates a hazard to the community. In
circumstances where the damage does not create a hazard to the community, it must
be repaired immediately on completion of the works associated with the
development. A condition report including photographs of the frontage of the site
should be completed and kept for future reference and made available to Council if
required.
Driveway and Internal Roads
12. Sealed crossovers must be provided for the two accesses to the site in compliance
with the following:
a. IPWEAQ Standard Drawing SEQ R-056.
b. Designed and certified by a RPEQ
c. Have a minimum width of 4.0m at the property front boundary line.
13. Internal roads must:
a. Have a minimum width of 3.0m and widened where necessary to provide
passing opportunities for vehicles using the site.
b. Be all weather construction (sealed or compacted gravel) suitable for the
anticipated traffic and load of vehicles using the site.
c. Be provided with adequate stormwater drainage that prevents undue erosion or
surface deformation or settlement.
Excavation and Filling
14. All earthworks shall be undertaken in accordance with the provisions of AS 3798
“Guidelines on Earthworks for Commercial and Residential Developments”.
Stormwater Drainage
15. Stormwater drainage works and water quality devices and measures must be
provided and maintained in accordance with the approved engineering plans and in
compliance with the Stormwater Quality Management Plan included in the
Stormwater Drainage for No 154 Holts Rd Cooroy Report dated 26 September
2014, Ref No: 1432 IWMP.doc, prepared by Callaghan & Toth. Particular attention
must be given to the construction and maintenance regime of the two proposed
Sediment Basins. The drainage works and basins must be certified by an RPEQ on
completion.
16. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site, the dam or any adjoining property.
Page 80 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.