Original source · versioned page text
DA Form 2
Attached to the e-mail Ent & Dining Business - Type 2 Recreation Amusement & Fitness (swim school) - MCU17/0550.
PART 7 – FOR OFFICE USE ONLY - FOR COMPLETION BY THE ASSESSMENT
MANAGER
Additional building details required for the Australian Bureau of Statistics
Existing building use/classification? (if applicable)
New building use/classification?
Site area (m2) Floor area (m2)
Additional information required by the local government
Confirm proposed construction materials:
Double brick Steel Curtain glass
External walls Brick veneer Timber Aluminium
Stone/concrete Fibre cement Other
Timber Steel Aluminium
Frame
Other
Floor Concrete Timber Other
Slate/concrete Tiles Fibre cement
Roof covering
Aluminium Steel Other
Date received: Reference numbers:
For completion by the building certifier
Classification(s) of approved building work QBCC Insurance receipt QBCC Certification Licence
number number
Notification of engagement of alternate chosen assessment manager
Prescribed assessment manager
Name of chosen assessment manager
Date chosen assessment manager engaged
Contact number of chosen assessment manager
Relevant licence number(s) of chosen assessment
manager
The Planning Act 2016, the Planning Regulation 2017 and the DA Rules are administered by the Department of
Infrastructure, Local Government and Planning. This form and all other required development application materials should
be sent to the assessment manager.
Page 6
DA Form 2 – Development Application details
Version 1.0—3 July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.