Original source · versioned page text
Attachment C - Geotechnical investigation
exend ourwards a minimum of 900 mum (more in highly reactive soil) and should have a minimum fal! away from the building of 1:60. The finished poving should be no les than 100 mm below brick vent bases. Tcis prudent ro relocate drainage pipes away from this paving, If possible, to. avold complications from future leakage If this is nor practical, earthenware pipes should be rephiced by PVC and backfilling should be of the same soil rype as the surrounding soil and compacted to che same density. Except in areas where freezing of water is an lasie, it is wise to remove taps in the buikting area and relocate chem well away frou the building — preferably noc uphill from ic (see BTF 19). Tr may he desirable to install a grated drain at the curside edge of the paving on the uphill side of the building. Ifsubsoll drainage ix needed this can be installed under the surface drain, Condensation In buildings with a subfloor void such as where bearers and joists support flooring, insufficient ventilation creates ideal conditions for condensation, particularly where there Is little clearance between the floor and the ground. Condensation adds to the moisture already present in the subfloorand significantly slows the process of drying our. Installation of an adequare subfloor ventilarion spscem, either ratural or mechanical, is desirable. Warning: Alchough this Building Technology File deals with cracking in buildings, it should be mid thar subfloor moisture can resulc in the development of other problems, notably: * Wacer char is eansmiteed into masonry, metal or timber building elements causes damage and/or decay two those elements. * High subfloor humidiry and moisture content create an ideal environment for various pests, including termites and spiders. * Where high moisture levels are transmitted vo the flooring and walls, an increase in the dust mine count can ensue within the living areas. Dust mites, as well as dampness in general, can be a health hazard tw inhabitants, particularly those who are abnormally aasceprtible to respimarory ailmenn: The garden The ideal vegetation layour is co have lawn ot plants thar require only Hight watering immedianely adjacene to the drainage ot paving edge, then moce demanding planes, shrubs and tsees spread our in thar order. Overwatering due to misuse of auvomaric watering symems iso common canse of sarusarion and water migzarion under footings. IF ic is necessaty to use these systems, it is important wm remove garden beds to a completely safe distance from buildings. Existing trees Where a tee is canting a problem of soil drying or there is the existence or threat of upheaval of footings, if the offending mow are subsidiary and their removal will noe significantly damage the tree, they should be severed and a concrete or metal harrier placed vertically in the sail to prevent fucure root growth in the direction of the building, If it is not poesible to remove the relevant mots withour damage to the tree, an application to remove the tee should be made wo the local authority, A prudent plan is w cransplanc likely offenders before they become a problem. Information on trees, plants and shrubs regarding root pacterns, volume of water needed and safe distance from buildings of most species. Boranic gardens ace also sources of information. For information on plant wow and drains, see Building Technology Pile 17. Excavation Excavation around footings must be properly engineered. Soil supporting foorings can only be safely excavared aran angle thar allows the soil under the footing to remain stable This angle Is called the angle of repose (or Friction) and yaries between soil types and condiriens Removal of sail within the angle of repose will canse subsidence. Where erosion has occurred that has washed away soil adjacent to feoriugs, soll of the same classification should be imroduced and ene ‘Where foorings have been undermined, augmentation or other specialist work may be required. Remediarion of footings and foundations is generally the realm of a specialie consulrant. Where isolated foorings rise and fall becanse of swell/shrink effect, the homeowner may be tempered to alleviate Floor bounce by filling the gup thar has appeared between the bearer and the pier with blocking. The danger hese is thar when the next swell segment of che cycle occurs, the extra blocking will push the floor up ino an. accentuated dome and may also cause local shear failure in the soil. If ir is necessary to use blocking, It should be by a pair of Fine wedges and monitoring should be carried our fortnightly, This BTF was prepared by John Lewer FAIR, MIAMA, Partner, Construction Diagnosis. ‘Tho Infermetion in this and other Issues in the series was denved from various scuross and was Dateved to be correct when published. The Information ts advisory. His provided In good falth and not claired to be an exhaustive treatment of the relevant subject, Further professional advice needs to be obtained before tahing any action based on the information provided. ‘Dishibutod by CSIRO PUBLISHING PO Bex 1139, Collingwood 3066, Australia Tal (03) 9542 7666 Fax [03] 96627555 wer w.publish.csiro.au Email: [email protected] © CSIRO 2008. Unauthorived copying of this Bullding Technology File is prohibited
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.