                                                                          SCRC CORRESPONDENCE



                                                                               111111 1
                                                                                B0298862
                                                                                                           X11
   23 February 2011                                                                                        kha
                                                                                                           DEVELOPMENT
                                                                                                           M A N A G E R S
   Our Ref: 10018 / Office: Sunshine                              z0 Osn A ^V • "                 ^
   Council Ref: 13205.699.5 (2005/0699)


   Chief Executive Officer
   Sunshine Coast Regional Council
   Locked Bag 72
   SUNSHINE COAST MAIL CENTRE QLD 4560
                                                                                                2011
   ATTENTION: DENIS WALLACE


   Dear Denis

   REQUEST FOR CHANGE TO DEVELOPMENT APPROVAL CONDITIONS

   DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE - Multiple Dwelling (42 Units)

   10 SERENITY CLOSE, NOOSA HEADS
   LOT 5 SP195871


   In relation to the abovementioned Development Approval originally granted on 13 October 2005 and
   subsequent Change to Development Approval and Extension to Relevant Period granted by Sunshine
   Coast Regional Council on 6 December 2010, on behalf of the applicant, Settlers Cove Developments,
   we hereby request a change to the development approval conditions in accordance with Section 369
   of the Sustainable Planning Act 2009.

   Please find enclosed the following documentation to facilitate Council's assessment of the request:

   •     Attachment 1 - Current Decision Notice;
   n     Owners Consent;
   n     Request to Change Approval Form; and
   n     A cheque for the amount of $2,667, made payable to Sunshine Coast Regional Council being the
         relevant Council lodgement fee for changes to 6 Conditions.

   We are seeking a change to the following development conditions:

       4. The Eucalyptus tereticornis trees and their surrounding native vegetation on the area
       of Lot 5 (Development Approval 23118 DA) shall not be cleared until at least 25
       Eucalyptus tereticornis trees have been planted, are well established and attained 3
       metres in height, in the Private Open Space for Conservation & Waterways Protection
       area on Lot S. These works shall be undertaken pursuant to the Environmental
       Management Plan (EMP1) prepared by WBM Oceanics Australia and dated 25 July 2005
       and the Ecological Restoration Plan & Specifications prepared by C&B Group and dated
       May 2005.                                        3CC :
                                                                 'T2 3 (76'
                   PLANNING I SURVEYING I PROJECT MANAGEMENT I COURT APPEALS

Moreton Bay                              Sunshine Coast                               North Queensland


18/42 King Street, Caboolture Old 4510   Suite 1, Corner Surf Road & Gardak Street    1C/41 Sturt Street, Townsville Old 4810
PO Box 1712, Caboolture Old 4510
p 1 07 5495 5318 r 1 07 5495 5317
                                         Alexandra Headland Old 4572
                                         PO Box 6380, Maroochydore B(-, Old 4558
                                                                                      PG Box 5027, Townsville Old 4810
                                                                                      p i 0''7 4 721 3056 1 1 07 4 721 3088
                                                                                                                                23
                                         p 1 07 5443 2844 r 1 07 5443 7146
Full text of the other 22 pages

Page 2

Proposed Change

In accordance with Condition 36 of Development Approval 23118 DA, issued by Noosa Shire Council
on 20 August 2004, the planting within the open space are has been completed and Lot 5 on SP15871
was cleared as part of a subsequent Operational Works Approval in compliance with this condition.
Condition 4 of the subject Material Change of Use Development Approval was issued just prior to
these clearing works being carried out. Due to this condition being satisfied and the site now being
clear of vegetation, Condition 4 is considered to be an irrelevant and redundant condition.

Condition 4 is therefore requested to be deleted.

18. All hot water systems installed shall be either solar systems; electric heat pump
systems or gas systems (LPG or natural).

Proposed Change

Historically, only approximately 50% of the dwelling units within the Settlers Cove Development are
occupied for the full duration of the year. As such, individual electric hot water heaters are considered
the most practical, cost effective and sustainable heating systems for unit occupants/owners. While
electric hot water systems may not be the most efficient and sustainable system for permanent full
time occupancy/use, they are appropriate for visitor accommodation with 50% occupancy rates, when
considering the stand by nature of a central gas hot water system, its need for an electric heat trace
and the additional water'dump'. Furthermore, there are no statutory requirements that prohibit the
use of individual hot water heaters within the approved building classification and therefore it is
unreasonable to condition a specific style of hot water system.

Condition 18 is therefore requested to be deleted.

21. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height above natural surface, required by the provisions of the
Planning Scheme.

Proposed Change

Condition 18 is an identical repeat of Condition 11 of the Development Approval and it is therefore a
superfluous condition.

Condition 21 is therefore requested to be deleted.

23. All relevant conditions of Development Permit 23118 DA shall be complied with prior
to the use approved under this permit (2005/0699) commencing.

Proposed Change

The plan of survey required by Development Permit 23118 DA has been endorsed by Council and
subsequently registered. As such all conditions of this permit have been complied with and this
condition is no longer relevant.

Condition 23 is therefore requested to be deleted.

Page 3

46. A new 1.5 metre wide concrete path shall be constructed along the Serenity Close
frontage of the site (if not already provided) in accordance with Council's design
standards and to an alignment that protects any significant vegetation or any
underground services.

Proposed Change

In accordance with Condition 124 of Development Approval 23118 DA, issued by Noosa Shire Council
on 20 August 2004, the 1.5m pathway was constructed as part of a subsequent Operational Works
Approval to satisfy this Condition. Condition 46 of the subject Material Change of Use Development
Approval was issued just prior to these works being carried out. Due to the fact the concrete path has
now been constructed, Condition 46 is considered to be an irrelevant and redundant Condition.

Condition 46 is therefore requested to be deleted.

47. All paths shall be designed and constructed to ensure pedestrian safety using non-slip
materials and to produce an evenly graded surface finish.

Proposed Change

Condition 47 is requested to be deleted in lieu of the justification provided for Condition 46.

Should you have any questions with respect to the above, please do not hesitate to contact me direct.


Yours faithfully
KHA DEVELOPMENT MANAGERS

Page 4

      ATTACHMENT 1
CURRENT DECISION NOTICE


[OCR of page images]
ATTACHMENT 1
CURRENT DECISION NOTICE

 

 

 

Page 5

                                            Sunshine Coast Regional Council r 07 5475 7272
 Sunshine Coast                             Locked Bag 72
                                            Sunshine Coast Mail Centre Q 4560
                                                                              I 07 5475 7277
                                                                              t: [email protected]
 Council                                    ABN 37 876 973 913                W www.sunshinecoast.qld.gov.au

                                                Officer:                 Denis Wallace
                                                Direct Telephone:        07) 5449 5179
                                                Fax:                     (07) 5475 7277
                                                Response Address:        Locked Bag 72, SCMC 4560
                                                Our Reference:           DWO08:AE:13.2005.699.5
                                                Your Reference:
6 December 2010



Settlers Cove Developments
PO Box 1923
NOOSA HEADS QLD 4567



Dear Sir

     Change to Existing Approval & Extension to Relevant Period
                                 Sustainable Planning Act 2009

I refer to your request dated 21 October 2010 to make a permissible change to an existing
approval and to extend the relevant period for an existing approval granted on
 13 October 2005. On 2 December 2010, Council decided your requested changes.

Details of the decision are as follows:,

1    APPLICATION DETAILS


Application No:                    132005.699.5 (2005/0699)
Street Address:                    10 Serenity Close NOOSA HEADS
Real Property Description:         Lot 5 SP 195871
Planning Scheme:                   The Noosa Plan (11 May 2009)

2    DECISION DETAILS

The following type of approval has been issued:

•      Development Permit for Material Change of Use - Multiple Dwelling (42 Units)

In relation to the request to make a change to the existing approval, Council on 1 August 2008
decided to: -
A.     Approve a change to Conditions 1, 3, 5, 9, 30, 31, 32, 34 & 36
B.     Delete Conditions 19 & 35
C.     Include an additional condition
D.     Issue a Change to an Existing Approval




                                                                                                  Page 1 of 15
Caloundra Office             Maroochydore Office                    Nambour Office                    Tewantin Office
1 Omrah Avenue               11-13 Ocean Street                     Cnr Currie and Bury Streets       9 Pelican Street
Caloundra Q 4551             Maroochydore Q 4558                    Nambour Q 4560                    Tewantin Q 4565
1 07 5420 8200               f 07 5475 8501                         T 07 5475 8501                    T 07 5449 5200
F 07 5420 8900               1   07 5441 8338                       F 07 5441 8338                    F 07 5447 1062

Page 6

                                                                                    132005.699.5

In relation to the request to make a change to the existing approval, Council on 18 December
2008 decided to: -
A.    Approve a change to Conditions 24 & 46
B.    Issue a Change to an Existing Approval
In relation to the request to make a change to the existing approval, Council on 5 March 2010
decided to:-
A.    Approve a change to Condition 16.
B.    Issue a Change to an Existing Approval


In relation to the request to make a change to the existing approval, Council on 2 December
2010 decided to:
A.    Agree to extend the relevant period until 2 December 2014
B.    Agree to amend Conditions 1, 5, 7, 9, 16, 25, 26, 29, 31, 32, 33, 34 & 65, and Advisory
      Note 1
C.    Agree to delete Condition 24
D.    Issue a Change to Existing Approval & Extension to Relevant Period

3    RELEVANT PERIOD OF APPROVAL

The relevant period for this development approval is identified in the Assessment Manager
conditions

4    CONSOLIDATED ASSESSMENT MANAGER CONDITIONS
1.    Development undertaken in accordance with this approval must generally comply with
      the approved plans of development. The approved plans are prepared by Cape Bouvard
      Pty Ltd and numbered:

       Plan /          Rev.   Plan 1 Document Name                           Date
       Document No.
       DA 02           P      Basement Masterplan                            20 October 2010

       DA 03           P      Stage 3 - lluka & Emerald - Site Master Plan   20 October 2010

       DA 04           P      Stage 3 - Roof Level Masterplan (Setbacks)     20 October 2010

       DA 07           P      Stage 3A - Iluka - Basement Plan               20 October 2010

       DA 08           P      Stage 3A - Iluka - Level 1 Floorplan           20 October 2010

       DA 09           P      Stage 3A - Iluka - Level 2 Floorplan           20 October 2010

       DA 10           P      Stage 3A - Iluka - Level 3 Floorplan           20 October 2010

      DA 11            P      Stage 3A - lluka - Level 4 Floorplan           20 October 2010

      DA 12            P      Stage 3A - Iluka - Elevations 1                20 October 2010
      DA 13            P      Stage 3A - Iluka - Elevations 2                20 October 2010

      DA 15            P      Stage 3B - Emerald - Basement Plan             20 October 2010
      DA 16            P      Stage 3A - Emerald -Level 1 Floorplan          20 October 2010
      DA 17            P      Stage 3A - Emerald - Level 2 Floorplan         20 October 2010
      DA 18            P      Stage 3A - Emerald - Level 3 Floorplan         20 October 2010




                                                                                Page 2 of 15

Page 7

                                                                                        132005.699.5


      DA 19             P      Stage 3A - Emerald - Level 4 Floorplan        20 October 2010
      DA 20             P      Stage 3A - Emerald - Elevations 1             20 October 2010
      DA 21             P      Stage 3A - Emerald - Elevations 2             20 October 2010

     and as may be amended by these conditions.
2.   The development must be undertaken and operated in a manner that causes no
     detrimental effect upon the amenity of the neighbourhood by reason of the creation of
     excessive noise, lighting nuisance or other emissions.
3.   The open space and setback areas within the area of the site able to be developed
     excluding the area of the site included in the Retained & Enhanced Vegetation, are to be
     landscaped in accordance with Council's Policy on Landscaping Guidelines and a
     properly prepared landscape plan. Such landscaping is to be completed prior to the
     premises being occupied and maintained at all times thereafter and shall include:
     3.1   retention of existing trees within the side and front setback areas, except where
           their removal would be necessary as a result of approved building or operational
           works;
     3.2   retention of existing trees between the building and the area of the site identified
           as Open Space Conservation & Waterway on Drawing No. 881228/E, titled 'Metes
           & Bounds Plan for Private Open Space for Conservation and Waterways
           Protection on Residential High Density (RHD) and dated 30 June 2004, except
           where their removal would be necessary as a result of approved building or
           operational works or the requirements of the Bushfire Management Plan;
     3.3   incorporation of koala and glossy black cockatoo food trees; and
     3.4   mature planting, including a minimum of 3 x 100 litre native trees and 20 x 45 litre
           native trees.
4.   The Eucalyptus tereticornis trees and their surrounding native vegetation on the area of
     Lot 5 (Development Approval 23118 DA) shall not be cleared until at least 25 Eucalyptus
     tereticornis trees have been planted, are well established and attained 3 metres in
     height, in the Private Open Space for Conservation & Waterways Protection area on Lot
     5. These works shall be undertaken pursuant to the Environmental Management Plan
     (EMP1) prepared by WBM Oceanics Australia and dated 25 July 2005 and the
     Ecological Restoration Plan & Specifications prepared by C&B Group and dated May
     2005.
5.   An easement in favour of the general public shall be provided over the pathway
     proposed along the site's southern boundary and through the Private Open Space for
     Conservation & Waterways Protection Area as shown on drawing No. 0215.5-6.SK04A
     prepared by Stephen Kidd Design, or alternatively, as shown on drawing no. DA 03
     Revision P prepared by Cape Bouvard Pty Ltd and dated 20 October 2010. The
     pathway shall be constructed to provide for pedestrian access for the general public
     during daylight hours 7am to 7pm, 7 days a week and shall be constructed in
     accordance with the approved Management Plans for the site.
6.   Any fencing provided in conjunction with the development is to be setback at least 1
     metre from the road frontage with at least half of any fence setback 2 metres. Dense
     landscaping is to be provided between the road frontage and any fencing.
7.   The visitor parking spaces at the frontage of the site shall be set back a minimum of
     2 metres from the front boundary to allow for soft landscaping to be established.
8.   The rooftop terraces shall not be covered, with any fixed structure or the like.




                                                                                 Page 3 of 15

Page 8

                                                                                   132005.699.5

9.    Any pools, spas, terraces, pathways or the like shall be setback a minimum of 6 metres
      from the Private Open Space for Conservation & Waterways Protection, with
      excavations undertaken to minimise any impacts on vegetation in the adjoining Private
      Open Space for Conservation & Waterways Protection.
10.   The building shall not exceed 15 metres in height measured from the natural and
      finished ground level in accordance with the Planning Scheme.
11.   A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of the work confirming compliance with the
      maximum building height above natural surface, required by the provisions of the
      Planning Scheme.
12.   Existing trees on the site and within road reserves are to be retained except where
      required to be removed due to building operations, requirements of the Bushfire
      Management Plan & the Ecological Restoration Plan or the conduct of the approved
      use.
13.   Any advertising sign or device is to comply with the provisions of Council's policies on
      advertising.
14.   Security in the form of a cash bond or trading bank guarantee to the sum of $50,000
      must be submitted, to secure performance of all conditions of this approval, prior to the
      issue of a Development Permit for operational works. The cash bond or trading bank
      guarantee will be returned on performance of the conditions of approval less any costs
      incurred by Council in respect of enforcing performance of this permit.
15.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call :,ipon the bond or guaranteed sum referred to
      in this approval to effect compliance with conditions.
16.   This Development Permit for a material change of use lapses if the use has not
      happened by 2 December 2014, during this time all associated works (including both
      the Illuka and Emerald stages of the development) must be completed.
17.   The developer must obtain all of the other Development Permits referred to in the
      Decision Notice, prior to obtaining a Development Permit for building works.
18.   All hot water systems installed shall be either solar systems; electric heat pump systems
      or gas systems (LPG or natural).
19.   Deleted.
20.   The proposed development shall have all kitchen, laundry and bathroom fittings that
      comply with the AAA Water Conservation Rating System as defined by the AS/NZS
      6400 (Water Efficient Products - Rating and Labelling 2003) and AS/NZS 3500
      (National Plumbing and Drainage Standard Part 1.2), with toilets to comply with AAAA
      Water Conservation Rating System. All tap ware and shower roses shall not exceed a
      maximum flow of 9 litres per min.       Dishwashers, baths, spa baths and washing
      machines are excluded from this requirement.
Building Services
21.   A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of the work confirming compliance with the
      maximum building height above natural surface, required by the provisions of the
      Planning Scheme.
22.   Numerous geotechnical reports for this site have been tendered since 1979 and these
      have been sourced and referenced so the following conditions apply to the site without
      reference to Council's Consulting Engineer - Coffey Geosciences.
      22.1 There is to be no uncontrolled discharge of water onto the slope;



                                                                                Page 4 of 15

Page 9

                                                                                   132005.699.5

      22.2 Stripping of vegetation for construction purposes should be minimised.           If
           vegetation is destroyed it should be reinstated immediately after construction is
           completed;
      22.3 Additional load due to fill, construction equipment or stockpiled materials should
           not be located on the dune slope;
      22.4 Vibration monitoring is to be carried out by the geotechnical engineer and
            appropriate action taken should vibration effects be a concern.
      22.5 A RPEQ is to be engaged by the client to oversee the piling works.
      22.6 The construction of the whole of the foundations is to be carried out in accordance
            with the recommendations of the applicant's consulting Geotechnical engineer,
            including any on-site supervision required by these recommendations.           Such
            works shall only be carried out during dry weather conditions and if there is a risk
            of sand movement occurring, all work shall be suspended until such steps,
            approved by the applicant's consulting Geotechnical engineer have been
            undertaken to ensure that no further slippage will result.
Land Development
23.   All relevant conditions of Development Permit 23118 DA shall be complied with prior to
      the use approved under this permit (2005/0699) commencing.
Lot Amalgamation
24.   Deleted.
Vehicle Access
25.   A 6.0 metre wide concrete crossover driveway shall be constructed from Serenity Close
      generally in accordance with Council's Standard Drawing SEQ R-051.
26.   The driveway shall be designed and constructed to Council's design standards and to
      grades that prevent vehicles from scraping and/or bottoming whilst also allowing
      pedestrians movements along the footpath without any level difference. Should any
      driveways be constructed to grades that do not comply with Council's Standards or
      AS/NZS 2890.1-2004.
      Council will require that the driveway be removed and reconstructed to levels that do
      comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is
      preferred to have the footpath continue at a constant grade to minimise the potential for
      pedestrians to trip or fall.
27.   All vehicles shall enter and leave the site in a forward direction.
28.   Full engineering details of the proposed driveway and carparking area shall be
      submitted for approval prior to obtaining a Development Permit for Operational Works.
Internal Driveways
29.   The development shall have an internal driveway that complies with the width and grade
      requirements as set out in AS/NZ2890.1-2004.
Service Bay
30.   A shared service bay for small delivery/maintenance vehicles and visitor parking shall be
      made available on site. This space shall be clearly line-marked and sign posted for use
      by Service Vehicles between the hours of 6am to 6pm. Outside of the specified hours
      the space could be used as a standard visitor space.




                                                                                Page 5 of 15

Page 10

                                                                                       132005.699,5

Carparking
31.   Carparking shall be provided within the site as generally shown on drawing number
      DA02 Revision P dated 20 October 2010 prepared by Cape Bouvard Investments Pty
      Ltd, except as modified herein.
32.   A minimum of 84 carpark spaces shall be provided on site generally as shown on
      drawing number DA02 Revision P dated 20 October 2010 prepared by Cape Bouvard
      Investments Pty Ltd, comprising:
      32.1 Seventy-two (72) under cover resident carpark spaces and a minimum of five (5)
           under cover visitor carpark spaces (within the basement), including 2 disabled
           spaces. The visitor spaces shall be accessible via an intercom facility at the
           basement entrance.
      32.2 Four (4) uncovered carpark spaces (towards the frontage of the building and the
            development site), consisting of 2 standard spaces and 2 disabled spaces.
      32.3 Deleted.
33.   All carparking areas shall be designed to comply with the provisions of AS/NZS 2890.1-
      2004 with a minimum head clearance (headroom) at any point of 2.2m.
34.   All carpark spaces shall be clearly defined by line marking each space and by providing
      appropriate signage. To this extent:
      34.1 Deleted.
      34.2 The tandem carpark spaces within the basement must be line-marked and signed
           so that visitors can only park behind the car parking space assigned to the
            resident that they are visiting.
      34.3 Deleted.
      34.4 Deleted.
      34.5 The uncovered carpark spaces (towards the frontage of the development) must be
            line-marked and signed specifically for "Visitor Parking Only". In addition, these
            spaces shall be restricted to short term parking only with a maximum time limit of 2
            hours.
      34.6 All carparking spaces as defined shall remain as parking spaces and are not to be
           converted to storage or enclosed.
      The requirements of this condition are to be included in the Community Management
      Statement for the development.
35.   Deleted.
36.   Carparking spaces adjacent to the car turning areas shall be provided with a bollard or
      other similar device to protect any vehicle parked in these spaces from being damaged
      by vehicles using the turning areas.
37.   Vehicle speeds within the basement shall be controlled by appropriate advisory speed
      signs and through the provision of speed humps.
38.   Access to the visitor car parking in the basement shall be controlled via an intercom
      system, which ensures that these spaces are available to visitors.
39.   A small sign shall be installed within the site (in a clearly visible location for all vehicles
      to see near the entry gates) to advise visitors that visitor car parking spaces are
      provided within the basement carpark and to use the intercom system to contact the
      manager or the unit they are visiting to enable entry to the basement and to these
      spaces.




                                                                                    Page 6 of 15

Page 11

                                                                                    132005.699.5

Vegetation Protection
40.   All trees to be retained shall be clearly defined on all drawings and clearly marked on
      site to prevent any damage occurring to these trees.
41.   Any works required within the drip zone of any trees to be retained shall be carried out
      by hand, not by machinery.
42.   The internal driveway (or any other form of hard pavement for that matter) within the drip
      zone of any trees on site to be retained shall be designed to allow the flow of water
      through the pavement or be designed to direct stormwater runoff to the trees root
      system. To this extent the uncovered visitor spaces towards the frontage of the
      development may be able to incorporate Grass Rings or a similar device that allows
      water penetration.
43.   All pavements shall be constructed so as not to damage the root system of any trees to
      be retained and in this regard temporary fencing shall be provided around the trees
      during construction to help protect them.
44.   Plans shall be submitted to the Council for approval that clearly show the type and
      extent of pavements proposed, how they comply with the above conditions and also
      illustrating any temporary fencing to protect the trees prior to obtaining a Development
      Permit for Operational Works.
Frontage Works
45.   Footpath improvements such as topsoiling, grassing, and tree planting are required to
      the Serenity Close frontage of the site (if not already provided) in accordance with
      Planning Scheme Policy PSP1 Landscaping Guidelines. Grass shall be couch, free of
                                                                                    %
      weeds.
46.   A new 1.5 metre wide concrete path shall be constructed along the Serenity Close
      frontage of the site (if not already provided) in accordance with Council's design
      standards and to an alignment that protects any significant vegetation or any
      underground services.
47.   All paths shall be designed and constructed to ensure pedestrian safety using non-slip
      materials and to produce an evenly graded surface finish.
Stormwater Drainage
48.   A stormwater management plan shall be prepared by a RPEQ, specialising in
      stormwater and water quality management incorporating the principles of the
      Environmental Management Plan for the Settlers Cove Development 23118DA, that
      demonstrates water reuse strategies, infrastructure capacity and effective treatment
      methodology. The use of rainwater harvesting tanks for irrigation purposes shall be
      incorporated in the overall design plans. These plans shall be submitted to Council for
      approval prior to obtaining a Development Permit for Operational Works.
49.   All stormwater drainage shall be collected on site and discharged so there is no net
      increase in stormwater runoff from the site.
50.   A stormwater holding tank shall be provided on site with a capacity to hold at least
      40,000 litres of water for the purpose of providing non-potable water supply to
      landscaped areas.
51.   On site swale drains will be required to capture and direct any overland stormwater
      runoff to the Infiltration Pits proposed on site. These swales shall be sized to carry a 3-
      month storm event and plans detailing their capacity, location, length, width and grades
      shall be submitted to Council for approval.




                                                                                 Page 7 of 15

Page 12

                                                                                     132005.699.5

52.   To ensure polluted run-off does not enter any of the proposed Infiltration Pits, and
      ultimately the water table, stormwater run-off from the carparking areas and the
      driveways shall have the first flush (the first 12 mm of rainfall or hose-down) collected in
      a grease/oil arrestor (or similar device) provided on site prior to discharging into the
      infiltration pits.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors, which shall be submitted to the Council for approval prior to obtaining a
      Development Permit for Operational Works.

      The approved maintenance plan shall be incorporated in the Community Management
      Scheme for the development and a copy of this shall be provided for Council's records
      prior to commencement of the approved Use.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      directly into the infiltration pits, bypassing the grease/oil arrestor.
      A Development Permit for Building Works shall not be granted until a Development
      Permit for Operational Works has been issued in regard to the drainage scheme.
53.   All site stormwater drainage shall be by means of a gravity system.
54.   Plans of the entire on site drainage design shall be prepared by a Registered
      Professional Civil Engineer and submitted to Council prior to obtaining a Development
      Permit for Operational Works.
Sewer Mains
55.   The site shall be connected to Council's existing sewerage reticulation systems and be
      constructed in accordance with Council's standards and requirements at no cost to
      Council.
Town Water Supply
56.   The site shall be connected to Council's existing town water supply and be constructed
      in accordance with Council's standards and requirements at no cost to Council.
57.   Each water connection to the water reticulation system shall extend to the property
      boundary and be metered. Where multiple units are served by a single service, multiple
      water meters to each individual unit and for the body corporate shall be installed. All
      fees for the supply of water meters shall be paid to the Council.
Service Easements
58.   All existing and proposed easements within the site shall be shown on the plans
      submitted for Operational Works / Building Works approval.
59.   Registered easements shall be created over any Council service within the subject site
      in accordance with Council's requirements (if not already created) and at no cost to
      Council.
      The Applicant's Solicitor shall give Council's Solicitor an appropriate undertaking in
      writing that the Title Deed and the easement documents will be lodged at the Land Titles
      Office and any additional Titles Office forms or requisitions requiring the consent of
      Council will be attended to promptly.
      A duly executed copy of the easement shall be submitted to Council for perusal prior to
      the use commencing.
      Any changes required by Council's Solicitor must be corrected immediately.




                                                                                  Page 8 of 15

Page 13

                                                                                    132005.699.5

Earthworks
60.   Plans and details outlining the extent of earthworks required on site and any trees to be
      retained shall be submitted to Council for approval prior to obtaining a Development
      Permit for Operational Works.
61.   All major excavations (including the basement and driveways) shall be shored to prevent
      batters extending into areas and vegetation that are to be retained. All trees to be
      retained should be adequately tagged to Council's satisfaction and enclosed with a
      barrier fence to the drip line to prevent damage.
62.   It is recommended that the applicant employ the services of a Geotechnical Engineer to
      supervise and certify the earthworks required on site and measures to ensure stability of
      adjoining land and structures.
63.   Earthworks shall not cause the ponding of water on any adjoining lands or the blockage
      of, or interference with, any natural watercourses or overland flow path.
Erosion and Sediment Control
64.   Any person acting on this permit shall prevent erosion and sediment export from leaving
      the site. Site control measures such as silt fencing, controlled gravel access to the site,
      controlled disposal of waste, catch drains, and temporary infiltration or sump pump-outs
      will be necessary.
      Plans detailing the methods of controlling erosion and sediment are required to be
      submitted to the Council for approval prior to obtaining a Development Permit for
      Operational Works. The applicant is advised that a simple silt fence by itself is unlikely
      to meet the objectives of best practice for Erosion & Sediment Control.
Construction Issues
65.   A Construction Management Plan addressing all construction phases, including traffic
      management, shall be prepared and submitted to Council for approval prior to obtaining
      a Development Permit for Operational Works.
      The report should aim to address every foreseeable problem that could occur during the
      construction process and include recommendations on how these can be overcome or
      minimised. The report shall be to the reasonable satisfaction of Council's Coordinator -
      Development Construction.
Community Management Statement Requirements
66.   The Applicant and all future owners of the site shall comply with the Environmental
      Management Plan (EMP) for Settlers Cove Development 23118 DA and compliance with
      the EMP shall be referenced in any community management statement over the site.
67.   The Fire Management Plan is to be implemented by the Developer and future owners of
      the site and is to be referenced in any community management statement.
68.   The owners of the allotment and subsequent units shall not object to the construction of
      a boardwalk along Noosa Inlet beside allotment 5 & 6 for the purpose of providing public
      access. Any Community Management Statement established over these allotments shall
      also detail that the body corporate will not object to the provision of a boardwalk as
      detailed above.
General
69.   A Registered Professional Engineer of Queensland shall certify engineering drawings
      and specifications for all engineering works, which shall be submitted in conjunction with
      an application for a Development Permit for Operational Works.
70.   Any damage caused to any public utility during the course of construction shall be
      repaired to Council's standards and at no cost to Council.



                                                                                 Page 9 of 15

Page 14

                                                                                    132005.699.5

71.   Any alteration of any public utility or other facilities necessitated by the development of
      the land or associated construction works external to the site shall be at no cost to
      Council.
72.   The transportation of all materials to and from the site shall be undertaken in a manner
      such that no particle matter escapes onto a public road. All vehicles carrying materials
      either to or from the site shall be covered to prevent materials including dust being
      windblown from the vehicle.
Environmental Health
73.   The developer must provide waste storage and disposal facilities in accordance with
      Planning Scheme Policy "Waste Management Multi-Dwellings and Commercial and
      Industrial Premises", including an external imperviously paved area correctly sized for all
      refuse and recycling containers and suitably screened from public places and
      neighbouring properties. A roofed wash down area is required with a cold-water tap,
      hose and drain outlet connected to sewer.
74.   Refuse chutes must be provided in accordance with Council's Policy for "Refuse Chutes
      and Accessories in Multi Storey Buildings".
75.   Noise emission from swimming pool and spa equipment (including heating equipment)
      shall comply with the following requirements:
      75.1 The equipment shall be installed and located in a manner that prevents excessive
           noise in accordance with Council's Local Law No. 12 - Control of Nuisances.
           Infringement Notices (on-the-spot fines) may apply for offences.
      75.2 A person must not use equipment on any day if it makes or causes noise to be
           made -
           75.2.1 From 10pm to lam: Which is audible outside the most exposed part of an
                  affected building
           75.2.2 From 7am to 7pm: More than the lower of either -
                   •    50 dB(A)
                   •   dB(A) above the background noise level
           75.2.3 From 7pm to 10pm: More than 3 dB(A) above the background noise level.
76.   Noise emission from air conditioning equipment shall comply with the following
      requirements:
      76.1 The equipment shall be installed and located in a manner that prevents excessive
           noise in accordance with Council's Local Law No. 12 - Control of Nuisances.
           Infringement Notices (on-the-spot fines) may apply for offences.
      76.2 Submission of written certification from a suitably qualified person confirming that
            the noise levels comply when measured at either the residential boundary or
            outside the most exposed part of an affected building, whichever is the closest to
            the equipment. This is required immediately after installation of the equipment and
            prior to any occupation of the building, and in a format approved by Council.
      76.3 A person must not use equipment on any day if it makes or causes noise to be
           made -
           76.3.1 From 10pm to 7am: More than the lower of either -
                   •   40 dB(A)
                   •   3 dB(A) above the background noise level




                                                                                Page 10 of 15

Page 15

                                                                                      132005.699.5

             76.3.2 From 7am to 7pm: More than the lower of either -
                     •   50 dB(A)
                     •   5 dB(A) above the background noise level
             76.3.3 From 7pm to 10pm: More than 3 dB(A) above the background noise level.
77.     Noise from building works associated with residential development shall comply with the
        following -
        77.1 Limited to between 7:00am to 6:30pm Monday to Saturday.
        77.2 All reasonable measures are taken to minimise noise emissions.
        77.3 Not permitted on Sunday or public holidays.
78.     As the development is in close proximity to mosquito and midge breeding area all
        windows and doors are to be screened.             The developer has to conduct an
        educational/awareness campaign for all residents.
79.     The external finishes of the building shall be of muted tones that blend in with the
        surrounding bushland setting and minimise the building's visibility when viewed from
        outside the Serenity Close as generally depicted on the proposed colour palette
        prepared by Blackburne Jackson Design and dated 22 April 2008.


5     REFERRAL AGENCY CONDITIONS

Not Applicable

6     APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the
following tables:

ADDroved Plans
Plan / Document No.      Rev.   Plan / Document Name                           Date

DA 02                    P      Basement Masterplan                            20 October 2010

DA 03                    P      Stage 3 - Iluka & Emerald - Site Master Plan   20 October 2010

DA 04                    P      Stage 3 - Roof Level Masterplan (Setbacks)     20 October 2010

DA 07                    P      Stage 3A - Iluka - Basement Plan               20 October 2010

DA 08                    P      Stage 3A - Iluka - Level 1 Floorplan           20 October 2010

DA 09                    P      Stage 3A - Iluka - Level 2 Floorplan           20 October 2010

DA 10                    P      Stage 3A - Iluka - Level 3 Floorplan           20 October 2010

DA 11                    P      Stage 3A - Iluka - Level 4 Floorplan           20 October 2010

DA 12                    P      Stage 3A - Iluka - Elevations 1                20 October 2010

DA 13                    P      Stage 3A - Iluka - Elevations 2                20 October 2010

DA 15                    P      Stage 3B - Emerald - Basement Plan             20 October 2010

DA 16                    P      Stage 3A - Emerald -Level 1 Floorplan          20 October 2010

DA 17                    P      Stage 3A - Emerald - Level 2 Floorplan         20 October 2010

DA 18                    P      Stage 3A - Emerald - Level 3 Floorplan         20 October 2010




                                                                                 Page 11 of 15

Page 16

                                                                                       132005.699.5

DA 19                     P       Stage 3A - Emerald - Level 4 Floorplan        20 October 2010

DA 20                     P       Stage 3A - Emerald - Elevations 1             20 October 2010
DA 21                     P       Stage 3A - Emerald - Elevations 2             20 October 2010

7    PLANS/DOCUMENTS REQUIRING AMENDMENT                                                           1
Not Applicable.

8    ADVISORY NOTES                                                                                1
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.      The applicant is informed that approval of this development application will trigger an
        Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
        Charges Plan for the estimated amount of $73,370 and is subject to variations in the
        Consumer Price Index, All Groups Brisbane from September 2010 until the date of
        payment. An Infrastructure Charge Notice will be issued in accordance with Chapter 5
        of the Integrated Planning Act 1997.
2.      The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999
        and Local Law No. 12, prevents a builder or building contractor carrying out building
        work on a building site in a way that makes or causes audible noise to be made from the
        building work:-
        2.1   On a Sunday or public holiday, at any time, or
        2.2   On a Saturday or a business day, before 7.00am or after 6.30pm.
        A maximum penalty of $1,500 applies to an offence under this legislation.
3.      We advise 'interested parties' i.e. 'developer', 'owner', 'tenant' to consider their
        responsibilities under the Disability Discrimination Act (DDA) in regard to the installation
        of disabled access and the provision of disabled facilities, and that access to this
        building and the provision of sanitary facilities may need to comply with the requirements
        of Section D Part D3 and Section F Clause F2.4 of the Building Code of Australia.
4.      Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991
        Act if the cost of operational works exceeds $80,000, then a portable long service levy is
        required to be paid. In accordance with Section 77.(1) of the Act, Council is required to
        sight the approved form issued by the Building and Construction Industry (Portable Long
        Service Leave) Authority that confirms that the requirements of the Act have been
        satisfied. A statutory declaration outlining the cost of the operational works must be
        submitted to Council with the lodgement of any application for operational works over
        the site.
5.      Payment via credit card transaction will not be an acceptable method of payment for
        development contributions conditioned in this permit or for infrastructure charge notices
        issued separately.
6.      In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
        paint, cement, concrete, builders waste or rubbish shall not be permitted to enter or be
        placed where it could reasonably be expected to move into a roadside gutter,
        stormwater drain or a water course. On the spot fines apply for such offences.




                                                                                   Page 12 of 15

Page 17

                                                                                     132005.699.5

 Aboriginal Cultural Heritage Act 2003
 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
 approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
 The ACH Act establishes a cultural heritage duty of care which provides that: "A person who
 carries out an activity must take all reasonable and practicable measures to ensure the activity
 does not harm Aboriginal cultural heritage." It is an offence to fail to comply with the duty of
 care. Substantial monetary penalties may apply to individuals or corporations breaching this
 duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the
 Minister administering the Act can also issue stop orders for an activity that is harming or is
 likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural
 heritage.
 You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any
 obligations under the ACH Act.

 9     PROPERTY NOTES

 Not Applicable.

110 PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME

 Not Applicable

 11 FURTHER DEVELOPMENT PERMITS REQUIRED


     Type of Development Permit required Subject of the required Development Permit
     Development Permit for Building Works   All Building Works

     Development Permit for Operational      Landscaping, Access and/or Carparking, Site
     Works                                   Civil Works, Stormwater Drainage, Frontage
                                             Works, Sewer Reticulation if not already
                                             installed, Water Reticulation if not already
                                             installed, Site Earthworks, Excavation of
                                             Materials to Fill Another Site


112 SELF ASSESSABLE CODES

 Not Applicable

113 SUBMISSIONS

There was one properly made submission about the application.

114 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME                                  1
 Not Applicable

115 RIGHTS OF APPEAL                                                                             1
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
the Sustainable Planning Act 2009 is attached.




                                                                                 Page 13 of 15

Page 18

                                                                                            132005.699.5

116 OTHER DETAILS

If you wish to obtain more information about Council's decision, electronic copies of which are
available on line at www.sunshinecoast.gld.gov.au, or at Council offices.



Decision Notice History

 13 October 2005         Original Decision Notice.

 1 August 2008           Change to an Existing Approval with amendment to Conditions 1, 3, 5, 9, 30,
                         31, 32 34 & 36 and inclusion of an additional condition.
18 December 2008         Change to an Existing Approval with amendment to Conditions 24 & 46.

5 March 2010             Change to an Existing Approval with amendment to Condition No. 16.

2 December 2010          Change to Existing Approval and Extension to Relevant Period with
                         amendment to Conditions 1, 5, 7, 9, 16, 25, 26, 29, 31, 32, 33, 34 & 65, and
                         Advisory Note 1 and deletion of Condition 24



Yours faithfully




DENIS WALLACE
SENIOR DEVELOPMENT PLANNER


Encl.   Appeal Rights
        Approved Plans/Documents
        Infrastructure Charge Notice (IC 331 - Rev 1)




                                                                                       Page 14 of 15

Page 19

                                                                                              132005.699.5




Sunshine Coast                                    Appeal Rights
Regional Cc,t n it                               SUSTAINABLE PLANNING ACT 2009 & SUS IAINABLL- PLANNING
                                                 REGULATION 2009




The following is an extract from the Sustainable
Planning Act 2009 (Chapter 7)


465    Appeals      about decisions       relating    to
       extensions for approvals
(1)    For a development approval given for a
       development application, a person to whom a
       notice is given under section 389, other than a
       notice for a decision under section 386(2), may
       appeal to the court against the decision in the
       notice.
(2)    The appeal must be started within 20 business
       days after the day the notice of the decision is
       given to the person.
(3)    Also, a person who has made a request under
       section 383 may appeal to the court against a
       deemed refusal of the request.
(4)    An appeal under subsection (3) may be started at
       any time after the last clay the decision on the
       matter should have been made.

466    Appeals        about    decisions    relating to
       permissible changes
(1)    For a development approval given for a
       development application, the following persons
       may appeal to the court against a decision on a
       request to make a permissible change to the
       approval-
       (a)       if the responsible entity for making the
                 change is the assessment manager for
                 the application-
                 (i)        the person who made the
                            request; or
                 (ii)       an entity that gave a notice
                            under section 373 or a pre-
                            request response notice about
                            the request;
       (b)       if the responsible entity for making the
                 change is a concurrence agency for the
                 application-the person who made the
                 request.
(2)    The appeal must be started within 20 business
       days after the day the person is given notice of
       the decision on the request under section 376.
(3)    Also, a person who has made a request under
       section 369 may appeal to the court against a
       deemed refusal of the request.
(4)    An appeal under subsection (3) may be started at
       any time after the last day the decision on the
       matter should have been made.




                                                                                          Page 15 of 15

Page 20

  Sunshine Coast                                             Request to Change Existing Approval and/or
     Ro jiin_i Council
                                                                    Extension to Relevant Period

NOTES:                                                                       Which entity issued the approval?
ALL questions MUST be completed unless the form indicates                    SI/ Sunshine Coast Regional Council
otherwise.                                                                             Other entity - please specify:
This form must be submitted to Council accompanied by the
                                                                             Is the approval for a mobile and temporary ERA?
applicable fee.
Attach extra pages if there is insufficient space on the form.               7         No
If Council was the Assessment Manager for the existing approval,                       Yes - complete below
and the approval was issued by the Court, then:-
                                                                            Insert the name of each local government area in which the
(a)      a request to change the development approval and/or                mobile and temporary ERA is proposed to
         conditions is made to the Court, and
                                                                            operate/operating.
(b)     a request to extend the relevant period for the approval is
        made to Council.
All terms used on the form have the meaning given in the
Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.                                                            3.              Nature of request

                                                                            Please tick ALL applicable categories
C          Details of the person making the request
                                                                                       To change the development approval
Full name - individual or company                                            V         To change the development conditions
                                                                                       To extend the relevant period before lapsing
     Tf1wcl-5 Cove PCvvLO?                     s Q- kA ^
                                     0ErEL"OF>"E 4T MM)A4eL3                            Please attach documentation outlining the details of
Contact name -for company
                                                                                        and the reasons and justification for the requested
5 c.O1r    SOgE(
                                                                                        change or extension.
Postal address
                                                                           I 4.             Location of the premises                               1
PO oh 63 8D
mA.0,oo(_H yoo(ia Gc.                      G-LD                             Street address
                                            Postcode      4 ^S               Unit no.         Street no.   Street name

Contact phone number                 Fax number - if applicable                                   10       .SER^iJI^ y Ct_vSE
                                                                            Suburb                                         Postcode
0'1    75 -i 4      28 44             D'1 54 4.3 -1 1            b
                                                                             NOOK VkCADS                                      456
Mobile number - if applicable
                                                                            Lot and plan description
                                                                             Lot no.          Plan type & plan no.
E-mail address - if applicable
                                                                                  `j           SP 195811
 Scoi't . 50                       .cnkAd s .       ov, . au         -71

2.         Details of the existing approval
Type of approval - please tick ALL applicable categories
        Development Permit
        Preliminary Approval                                                5.              Concurrence Agencies
        Compliance Permit                                                   Was there one or more concurrence agencies involved in
        Material Change of Use                                              the original approval?
        Reconfiguring a Lot                                                            No
                                                                              V
        Operational Works                                                              Yes - provide details below
        Building Works                                                      Note - Under s372 of the Sustainable Planning Act 2009 the person
        Plumbing or Drainage Works                                          making the request is required to give a copy of this request to all
                                                                            concurrence agencies.
        Compliance Certificate
        Environmentally Relevant Activity (ERA)                             Concurrence Agency                             Date copy given

Application number               Date issued                                                                                    /     /
                                                                                                                                /     /
13 2°0 5. 659 . 5                                 i3 /to/ Zoo5
( -Loo 5 0(09`1)




                                                                                                                              Page 1 of 2

Page 21

6.           Pre-request response notice                              8.       Does the request involve a State resource
                                                                               prescribed under the Sustainable Planning
Has a pre-request response notice been given by a relevant
                                                                               Regulation 2009, Schedule 14?
entity (e.g. a concurrence agency) for this request?
       No                                                                   No
       Yes                                                                  Yes - complete Table C below
        If yes, please attach a copy of the notice.
                                                                      Table C - State owned resource
                                                                      Nature of State owned resource
7.          Owner's consent

Is the owner's consent required for this request?
       No                                                             Nature of evidence required
      Yes - complete either Table A or Table B below                       Evidence of allocation of /entitlement to, the resource
Note - If more than one owner of the land all owners' details are           Evidence the chief executive has agreed to the request
required.
                                                                              Attach a copy of the evidence required above.
Table A - owner's consent provided on form
Owner's name/s                                                        NOTES: For question 8
                                                                      Section 370(3) and (4) of the Sustainable Planning Act 2009 requires
I/We, the above-mentioned owner/s of the land, consent to             that Ian application for the development approval were mode at
the making of this request.                                           the time of making this request and evidence under section 264(1) of
Signature/s                                                           the Sustainable Planning Act 2009 would be required to support the
                                                                      application, this request must be accompanied by the written
Date                                                                  agreement of the chief executive from whom evidence would be
                                                                      required under section 264(1).
                                                                      Section 264 of the Sustainable Planning Act 2009 provides that if a
                                                                      development involves a State resource, a regulation may require the
Table B - owner's consent attached                                    application to be supported by certain evidence prescribed under
Owner's name/s               C13D SEn-L tz           LOV6             regulation. Schedule 14 of the Sustainable Planning Regulation 2009
                              pty L-r D                               prescribes the State resources for which evidence is required to be
I[The owner's written consent is attached.                            given, and the evidence required, to support the application.


                                                                      9.       Applicant's declaration                                       1
NOTES: For question 7
Under section 371 of the Sustainable Planning Act 2009, if the        Signature/s:
person making the request is not the owner of the land to which the
approval relates, the request must be accompanied by the owner's
consent.
However, owner's consent is not required if the approval:
•                                                                     By making this request, I detlar4 that all information in this
     relates to land the was acquisition land to which section
     263(2)(d) of the Sustainable Planning Act 2009 applied when      request is true and correct.
     the application for the approval was made; or
•    is for building work or operational work for the supply of
     community infrastructure on land designated for the
     community infrastructure; or
•    the consent of the owner would not be required under section
     263(1) of the Sustainable Planning Act 2009 if a development
     application were mode for the requested change.
Also, owner's consent is not required if the Assessment Manager is
satisfied that:
•    the number of owners of the land make it impractical to obtain
     owners' consent and the requested change does not materially
     affect the owners' land; or
•    having regard to the nature of the proposed change, the owner
     has unreasonably withheld consent and the requested change
     does not materially affect the owner's land.




PD-DA-FM401/1-30/04/2010                                                                                               Page 2 of 2

Page 22

Our Ref: 10018 / Office: Sunshine Coast


Chief Executive Officer
Sunshine Coast Regional Council
Locked Bag 72
SUNSHINE COAST MAIL CENTRE QLD 4560




Dear Sir/ Madam

LANDOWNER'S CONSENT

REQUEST TO CHANGE CONDITIONS - DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF
USE - MULTIPLE DWELLING (42 UNITS) FILE REF:132005.699.5 (2005/0699)

10 SERENITY CLOSE, NOOSA HEADS
LOT 5 SP195871

We, CBD SETTLERS COVE PTY LTD ACN 114 192 773, as owner of land at 10 SERENITY CLOSE,
NOOSA HEADS, described as LOT 5 SP195871, hereby consent to the making of a development
application under the Sustainable Planning Act 2009 by KHA Development Managers for the
abovementioned application.




                  G^ s ...    .   ............................   Date....:     ..... ...l ....
NAME:




                                                                 Date ...................................
NAME:

Page 23

Appointing a person or persons as your attorney
                                                As principal (the person making the appointment), you
                                                complete this form by writing your responses on the lines and
                                                ticking the appropriate boxes. Then sign the form and have
                                                your signature witnessed.      Any adult may witness your
                                                signature. However, if this power of attorney is required to be
                                                registered under the Land Titles Act, the witness must be a
                                                justice of the peace, a commissioner for declarations, a lawyer
                                                or a notary public.

                                                Appointment of attorney or attorneys

1.     CBD SETTLERS COVE PTY LTD ACN 114 192 773 of Level 5, 181 St Georges Terrace,
       Perth WA 6000 appoint the following person as my attorney: GARY MICHAEL GODFREY of
       6 Daybreak Court, Castaways Beach QId 4567.

2.     Are you appointing more than one attorney?
       ® No 4 Go to clause 4.
       q Yes.

3.     How do you prefer that they make their decisions? (rick one box only)
       q   Severally (any one of them may decide)
       q     Jointly (unanimously)
       q     As a majority (specify e.g. simple majority, two-thirds majority, etc.)

       q      Other*

       Note: The Powers of Attorney Act 1998 allows you to appoint successive attorney/s for a matter so that the
       power is given to a particular attorney only when power to a previous attorney ends. You can nominate the
       circumstances that a power will end leg. if x leaves the jurisdiction, y may act).

4.     The attorney/s power Is subject to the following terms:
       To execute any statutory and local authority application for approval and any associated
       documentation including but not limited to those for land use, land development and building,
       and including but not limited to applications for Reconfiguration of Lot, Material Change of
       Use and Operational Works relating to the development known as Settlers Cove Noosa
       Heads owned by CBD Settlers Cove Pty Ltd ACN 114 192 773 being part of what was
       originally lot 4 on SP100064, County of March, Parish of Weyba.

5.     The power given to my attorneyls begins:
       ® immediately.
       q on this date:
       (Write here the date when you want the appointed person/s to begin acting as your attorney.)
       q      on this occasion:
       [Write here the occasion on which you want the appointed person/s to begin acting as your attorney.]
                         Note: If you do not complete clause 5, the power begins immediately.

6.     This powet^of a torney gives my attorney/s power to do, on my behalf, anything that I
       could lawfully d by an attorney (other than a personallhealth matter), subject to the
       above terns.


(Director)                                                             [Director/Secretary]

                       ............................. .. Z..   BD SETTLERS COVE PTY LTD ACN 114 192 773



S:1D0umeMS%516571CLH_51657_037.000                                                                                  2

Used in these records

About this file

File size
4.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

132005.699.1.05 - Application to Change to Existing Approval - (shows as 699.1.05 but should be .66.05).pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.