132005.699.1.05 - Application to Change to Existing Approval - (shows as 699.1.05 but should be .66.05) · 132005.699.04
132005.699.5
DA 19 P Stage 3A - Emerald - Level 4 Floorplan 20 October 2010
DA 20 P Stage 3A - Emerald - Elevations 1 20 October 2010
DA 21 P Stage 3A - Emerald - Elevations 2 20 October 2010
7 PLANS/DOCUMENTS REQUIRING AMENDMENT 1
Not Applicable.
8 ADVISORY NOTES 1
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $73,370 and is subject to variations in the
Consumer Price Index, All Groups Brisbane from September 2010 until the date of
payment. An Infrastructure Charge Notice will be issued in accordance with Chapter 5
of the Integrated Planning Act 1997.
2. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999
and Local Law No. 12, prevents a builder or building contractor carrying out building
work on a building site in a way that makes or causes audible noise to be made from the
building work:-
2.1 On a Sunday or public holiday, at any time, or
2.2 On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
3. We advise 'interested parties' i.e. 'developer', 'owner', 'tenant' to consider their
responsibilities under the Disability Discrimination Act (DDA) in regard to the installation
of disabled access and the provision of disabled facilities, and that access to this
building and the provision of sanitary facilities may need to comply with the requirements
of Section D Part D3 and Section F Clause F2.4 of the Building Code of Australia.
4. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991
Act if the cost of operational works exceeds $80,000, then a portable long service levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to
sight the approved form issued by the Building and Construction Industry (Portable Long
Service Leave) Authority that confirms that the requirements of the Act have been
satisfied. A statutory declaration outlining the cost of the operational works must be
submitted to Council with the lodgement of any application for operational works over
the site.
5. Payment via credit card transaction will not be an acceptable method of payment for
development contributions conditioned in this permit or for infrastructure charge notices
issued separately.
6. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
paint, cement, concrete, builders waste or rubbish shall not be permitted to enter or be
placed where it could reasonably be expected to move into a roadside gutter,
stormwater drain or a water course. On the spot fines apply for such offences.
Page 12 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132005.699.1.05 - Application to Change to Existing Approval - (shows as 699.1.05 but should be .66.05)Related documentApplication case desk ↗
132005.699.1.05 - Application to Change to Existing Approval - (shows as 699.1.05 but should be .66.05)Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.