Original source · versioned page text
220224 Middle Creek Rd
Attached to the e-mail Information Request response OPW21/0357 - 503 Middle Creek Rd Federal.
OPERATIONS - UNDISTURBED AREAS VEGETATION RETENTION & REVEGETATION AREAS ANNUAL MAINTENANCE REGIME
· Identify eeds If unsure consult A All ot er vegetation to be protected and TASK FREQUENCY PERFORMANCE INDICATOR
retained
Brushcutting / Every 2 eeks from October arc Regenerating plants and
· Treat all eeds and pasture grasses Refer to eed Removal Sc edule revegetation areas free from
Slashing Every 4 eeks from April September
· Remove all ant ropogenic rubbis competition it grass Remove
· op dead dying or dangerous limbs or trees as required to remove risk of injury to trim over anging branc es
users of t e area Cut up aste material into 1 2 meter lengt s and place flat on t at interfere it brus cutting
ground surface it in regeneration ones at least 5 meters from pat s and ot er slas ing
infrastructure
· All felled vegetation is to be retained on site mulc is to be used in revegetation Weeding - by Every eek during inimal regro t of eeds No
landscaping or soil stabilisation activities hand Establis ment Period Every competition from unc ecked
2 eeks during aintenance eed and grass regro t
· Identify location for supplement planting for canopy integrity
Period beyond Remove all no ious ig risk
environmental eeds
WEED REMOVAL SCHEDULE
Spraying / Every 2 eeks from October No eeds or grass of greater
Task Operation Frequency Wick Wiping arc Every 4 eeks from eig t t an plant it in 500mm
Remove entire plant by and Alternatively kill Follo ing April September se a of plants Remove all no ious
Herbaceous plant it erbicide application using ick iper identification of Pre emergent erbicide if site is ig risk environmental eeds
and small or ooded spray no le For erbaceous eeds eeds As eavily eed infested C eck mo ing edge around site
weed control cut or scrape stem and paint it 1:1 mi of required to kill re spray if required
glyp osate and ater eeds
Re-mulching Allo to carry out at least once during niform 100mm deep to
rill and fill or frilling erbicide is delivered into Follo ing aintenance Period t en once per suppress eed gro t
Large and sap ood via drilled oles or frill cut pockets identification of year maintain soil moisture
woody weed immediately after ound is made If eeds As
Watering Every 2 or 3 days during Plants e ibit ealt y gro t
control accessibility permits cut stump met od Cut required to kill
Establis ment Period every eek no signs of ater stress
tree 30mm above ground and paint stump it eeds
during aintenance Period or as
undiluted glyp osate
required to maintain adequate soil
Remove aste material containing flo ers or Follo ing moisture
Remove or seeds or eed species from site t at can s oot identification of Fertilising As required ere en plants are Plants e ibit ealt y gro t
manage from pieces of plant ispose of at approved eeds As not responding to slo release no signs of ater stress
vegetative facility aste material to be covered en required to kill fertiliser applied at planting Allo to
waste removing from site eeds fertilise once during aintenance
Period
· ere furt er detail is required follo industry standards and met odologies or
contact S PER Storm Damage Follo ing storm event eavy rainfall Any damage noted rectified
Inspection or ig inds
4. WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE Pruning & To promote ealt y plant gro t Plants ave desired natural
· T is plan as been developed to specify regeneration operations for t e e isting Plant ont ly during Establis ment form display ealt y gro t
aquatic one riparian area upland one Maintenance Period Every 3 mont s during Remove vines from young
· NOTE: T e regeneration plan must be read in conjunction it t e operational orks aintenance Period beyond plants
landscaping decision notice and site environmental management plan As required or after flood event All litter removed disposed of
Rubbish
properly off site Organic flood
OBJECTIVES debris in trees it in reac
1 To en ance t e ecological value of t e locality en standing to be removed
2 To remove eeds and minimise future incursion spread on site
1m OUT OF GROUND, STAKE PAINTED PINK
3 Encourage natural recruitment and regeneration
Supplementary As required Replace dead dying 3x TUBE dia.
4 Re abilitate degraded areas
Planting damaged or stolen plants
5 Satisfy t e recreational requirements of residents as ell as t e ecological
requirements of a flora and fauna reserve
TUBESTOCK PLANT, REFER TO PLANT
· From practical completion all maintenance activities as per follo ing sc edule need SCHEDULE FOR SPECIES. TREE GUARD
to be conducted until project completion WHERE GRAZING & FROST OCCURS
FORM SHALLOW SAUCER SHAPED
WEED DISTRIBUTION TABLE: DEPRESSION AROUND PLANT BASE
100mm DEEP ORGANIC MULCH PER AS
SPECIFIED (500mm Diameter).
KEEP MINIMUM 50mm CLEAR OF PLANT STEM.
CULTIVATED SUBGRADE TO 150mm
FINISHES SCHEDULE
CODE ITEM PRODUCT / DESCRIPTION SIZE / PATTERN FINISH COLOUR
Top Soil Soil preparation As Smoot uniform eed free
Ameliorated site topsoil: Refer to
Top soil per Specification per plan topsoil mulc surfaces it no As supplied 10mg TERRAFORM PRODUCT GRANULES
specifications
nominated areas deleterious materials
niform finis 100mm deep free of deleterious
FB Organic ulc Street Tree garden pt and gardens 25mm composted materials Install pinned coir mes over bio retention As supplied SUBGRADE
Composted Forest itter basic mulc areas project entry batter and
storm ater overland flo pat lo flo s ales
Coir ES Coir es Coir Net 400gsm Coir ES pinned do n over ulc as As supplied
per manufactures specification
1 TUBESTOCK PLANTING N.T.S.
LD3 Typical Section
Client Project NORTH TITLE: JOB No.: S21081100
anembo consultants
FILE: 220224
DONOVAN BISS
D 24.02.22 COUNCIL RFI CK TH
503 Middle Creek Rd, Federal C 06.12.21 COUNCIL UPDATES CK TH DWG. No. LD3
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION PLAN B 17.09.21 COUNCIL SUBMISSION CK TH
SCHEDULE OF
FINISHES,
SHEET 3 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale A 23.08.21 FOR REVIEW CK TH SPECIFICATION NOTES - Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 & TYPICAL DETAIL -
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.