Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Skale plans

Attached to the e-mail Application and Design plans.

of 30

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                      specifications. Roof framing to be in accordance with structural                   have a min. 3 star water efficiency labelling and standards rating                      supervised by trained traffic management personnel should be adopted for the
                                                                                                                                                                                                                                                                                                                                                                                                      of the building. Where workers are required to enter small spaces they should
                                                                                                                                      engineers design and detail.                                                                                                                                                                                                                                    be scheduled so that access is for short periods. Manual lifting and other manual
                                                                                                                                                                                                                         as per the requirements of the QDC .                                                    work site when appropriate as determined by the builder.
¿ play your part - print on recycled paper                                                                                                                                                                                                                                                                                                                                                            activity should be restricted in small spaces.

                                                  Notes and Conditions                                                                Rainwater Goods                                                                                                                                                            Services
Drawing Schedule                                                                                                                                                                                                         In a new class 1 building hot water is supplied by a–                                   Rupture of services during excavation or other activity creates a variety of risks
                                                                                                                                                                                                                                                                                                                                                                                                      Public Access
No:        Drawing Name                           General Notes                                                                       All gutters and downpipes to be in accordance with                                 (a) heat pump or a solar hot water system that is eligible to                           including release of hazardous material. Existing services are located on or
                                                                                                                                                                                                                                                                                                                                                                                                      Public access to construction and demolition sites and to areas under
                                                  These schedules are to be read in conjunction with architectural                    manufacturers specifications and NCC 3.5.2. Provide fall of min.                                                                                                                                                                                                maintenance causes risk to workers and public. Warning signs and secure
                                                                                                                                                                                                                         receive:                                                                                around this site. Where known, these are identified on the plans but the exact
                                                                                                                                                                                                                                                                                                                                                                                                      barriers to unauthorised access should be provided. Where electrical
1.0               Notes                           drawings, structural engineer and hydraulic engineer drawings                       1:500 for eave gutter and 1:100 for box gutters. All internal box                  (i) in a building with 3 or more bedrooms, at least 22 Renewable                        location and extent of services may vary from that indicated. Services should be
                                                                                                                                                                                                                                                                                                                                                                                                      installations, excavations, plant or loose materials are present they should be
                                                  and any other external consultants. Any discrepancy with these                      gutters to have overflow spitters at all rain water outlets.                                                                                                               located using an appropriate service (such as Dial Before You Dig), appropriate
                                                                                                                                                                                                                         Energy Certificates; or                                                                 excavation practice should be used and, where necessary, specialist contractors
                                                                                                                                                                                                                                                                                                                                                                                                      secured when not fully supervised.
1.1               Site plan                       schedules or other documentation is to be referred to the                           Downpipes to be spaced not more than 12m and within 1.2m of                        (ii) in a building with less than 3 bedrooms, at least 14                               should be used.
                                                  designer for written direction prior to the commencement of                         valley gutters. All storm water disposal to be in accordance with                                                                                                                                                                                               Operation use of the building
                                                                                                                                                                                                                         Renewable Energy Certificates; or                                                                                                                                            This building has been designed as a residential building. If it, at a later date, is
1.2               Floor plan - Sub floor          works. All works to be in accordance with the Building Act 1975,                    hydraulic engineers design and detail. All roof drainage systems                   (b)gas hot water system with an energy rating of at least five                          Overhead power lines are near or on this site. These pose a risk of electrocution
                                                                                                                                                                                                                                                                                                                                                                                                      used or intended to be used as a workplace, the provisions of the Work Health
                                                  Standard Building Regulation, Building Code of Australia,                           and fixings to be in accordance with manufacturers                                                                                                                         if struck or approached by lifting devices or other plant and persons working
                                                                                                                                                                                                                         stars.                                                                                  above ground level. Where there is a danger of this occurring, power lines
                                                                                                                                                                                                                                                                                                                                                                                                      and Safety Act 2011 or subsequent replacement Act should be applied to the
1.3               Floor plan - GF                 Queensland Development Code, Local government regulations                           specifications. All storm water drainage to be in accordance with                  (Note: Renewable Energy Certificates are issued under the                               should be, where practical, disconnected or relocated. Where this is not practical
                                                                                                                                                                                                                                                                                                                                                                                                      new use.
                                                  and relevant Australian Standards. The Builder is to clarify all                    hydraulic engineers design and detail.                                             Commonwealth Government’s Mandatory Renewable Energy                                    adequate warning in the form of bright coloured tape or signage should be used
                                                                                                                                                                                                                                                                                                                                                                                                      Other high risk activity
1.4               Floor plan - FF                 dimensions on site prior to the commencement of any works.                                                                                                             Target.). The unit shall be located as close as practical to the                        or a protective barrier provided.
                                                                                                                                                                                                                                                                                                                                                                                                      All electrical work should be carried out in accordance with Code of Practice:
                                                  The author of the drawings takes no responsibility for details as                   Windows & Glazing                                                                  main bathroom in accordance with the Queensland Plumbing                                                                                                                     Managing Electrical Risks at the Workplace, AS/NZ 3012 and all licensing
                                                                                                                                                                                                                                                                                                                 Manual tasks
1.5               Roof plan                       shown if changes are made during or prior to construction                           Windows and glazed doors are to be selected aluminium framed                       and Wastewater Code.                                                                    Components within this design with a mass in excess of 25kg should be lifted by
                                                                                                                                                                                                                                                                                                                                                                                                      requirements.
                                                  without written notice or approval. Do not scale off plans use                      with selected clear anodised finish to comply with AS 2047. All                                                                                                                                                                                                 All work using Plant should be carried out in accordance with Code of Practice:
                  Dimension plan - Sub                                                                                                                                                                                                                                                                           two or more workers or by mechanical lifting device. Where this is not practical,
                                                                                                                                                                                                                                                                                                                                                                                                      Managing Risks of Plant at the Workplace.
1.6
                  floor                           figure dimensions only. The maximum height of construction is                       fixings to comply with AS 1288 and AS 2047 for the nominated                       Safety Notes                                                                            suppliers or fabricators should be required to limit the component mass.
                                                                                                                                                                                                                                                                                                                                                                                                      All work should be carried out in accordance with Code of Practice: Managing
                                                  to comply with local authority planning scheme (excluding                           wind category. Site measure openings prior to ordering                             Falls, slips, trips
                                                                                                                                                                                                                                                                                                                                                                                                      Noise and Preventing Hearing Loss at Work.
                                                                                                                                                                                                                         Working at heights during construction                                                  All material packaging, building and maintenance components should clearly
1.7               Dimension plan - GF             relaxations as per town planning approval).The author takes no                      windows. All glazing to be in accordance with NCC 3.6                              Wherever possible, components for this building should be prefabricated off-site        show the total mass of packages and where practical all items should be stored
                                                                                                                                                                                                                                                                                                                                                                                                      Due to the history of serious incidents it is recommended that particular care be
                                                  responsibility for cut/fill levels resulting from the documented                                                                                                                                                                                                                                                                                    exercised when undertaking work involving steel construction and concrete
                                                                                                                                                                                                                         or at ground level to minimise the risk of workers falling more than two metres.        on site in a way which minimises bending before lifting. Advice should be
1.8               Dimension plan - FF                                                                                                                                                                                                                                                                                                                                                                 placement.
                                                  levels and contours. The Builder is to comply with statutory and                    Insulation                                                                         However, construction of this building will require workers to be working at            provided on safe lifting methods in all areas where lifting may occur.
                                                  contractual environmental protection requirements. The builder                      Roof insulation to have R1.3 55mm Permastop® Building                              heights where a fall in excess of two metres is possible and injury is likely to
1.9               Drainage plan                                                                                                                                                                                          result from such a fall. The builder should provide a suitable barrier wherever a       Construction, maintenance and demolition of this building will require the use of
                                                  shall verify all existing structure prior to commencement of                        Blanket and Pink® Ceiling Batts R3.0 as manufactured by                            person is required to work in a situation where falling more than two metres is a       portable tools and equipment. These should be fully maintained in accordance
                  Electrical plan - Lighting -    works, any discrepancies are to be reported to the designer and                     Fletcher Insulation to all ceilings. All insulation to be installed in             possibility.                                                                            with manufacturer’s specifications and not used where faulty or (in the case of
1.10                                              engineer for written direction.                                                     accordance with manufacturers specifications.                                                                                                                              electrical equipment) not carrying a current electrical safety tag. All safety
                  Sub floor
                                                                                                                                      Wall Batts R2.5 as manufactured by Fletcher Insulation to all                      Working at heights during operation and/or maintenance                                  guards or devices should be regularly checked and Personal Protective
                  Electrical plan - Lighting -                                                                                                                                                                           Cleaning and maintenance of windows, walls, roof or other components of this            Equipment should be used in accordance with manufacturer’s specification.
1.11                                              Services                                                                            external framed walls. All framed walls to have Sisalation® wall
                  GF                                                                                                                                                                                                     building will require persons to be situated where a fall from a height in excess
                  Electrical plan - Lighting -    Builder to locate all services before commencement of                               wrap light duty. All insulation to be installed in accordance with                 of two metres is possible. Where this type of activity is required, scaffolding, fall   Hazardous substances
1.12                                                                                                                                  manufacturers specifications.
                  FF                              construction. Waste services connection to existing sewerage                                                                                                           barriers or Personal Protective Equipment should be used in accordance with             Asbestos
                                                  system and to comply with local authority regulations and Water                                                                                                        relevant codes of practice, regulations or legislation.                                 This sitevacant. The builder should check and, if necessary, take appropriate
                  Electrical plan - Services -                                                                                                                                                                                                                                                                   action before commencement of works to ensure that the removal of any
1.13                                                                                                                                  Ceiling Linings
                  Sub floor                       Supply Act 1949. Roof water to discharge via downpipes to                                                                                                              Anchorage points for portable scaffold or fall arrest devices have been included        existing hazardous materials that may be present on the site. Should any
                  Electrical plan - Services -    street channel in accordance with local authorities regulations                     10mm gyprock sheeting typically. Linings fixed in accordance                       in the design for use by maintenance workers. Any persons engaged to work on            remains of hazardous materials be discovered the builder shall to steps as
1.14
                  GF                              and hydraulic engineers design and detail.                                          with AS 2589 and finished to level 4 standard. Ceiling and wall                    the building after completion of construction work should be informed about the         deemed appropriate to remove such hazardous materials.
                                                                                                                                      lining junction to be square set.                                                  anchorage points.
                  Electrical plan - Services -                                                                                                                                                                                                                                                                   Powdered materials
1.15
                  FF                              Excavation                                                                                                                                                             Slippery or uneven surfaces                                                             Many materials used in the construction of this building can cause harm if
                                                  All earthworks are to be in accordance with engineers design                        Wall Linings                                                                       Floor finishes                                                                          inhaled in powdered form. Persons working on or in the building during
1.16              AC Layout plan - GF
                                                  and detail, AS 3798 and NCC 3.1.1. Site drainage to be in                           10mm gyprock sheeting typically. Linings fixed in accordance                       Where specified finishes have been selected to minimise the risk of floors and          construction, operational maintenance or demolition should ensure good
                                                  accordance with NCC 3.1.2 The contractor is to verify all levels                    with AS 2589 and finished to level 4 standard. Ceiling and wall                    paved areas becoming slippery when wet or when walked on with wet shoes/                ventilation and wear Personal Protective Equipment including protection against
1.17              AC Layout plan - FF                                                                                                                                                                                    feet. Any changes to the specified finish should be made in consultation with the       inhalation while using powdered material or when sanding, drilling, cutting or
                                                  and dimensions, before commencement of work and any                                 lining junction to be square set.                                                  designer or, if this is not practical, surfaces with an equivalent or better slip       otherwise disturbing or creating powdered material.
                                                  discrepancies shall be reported to the designer before                                                                                                                 resistance should be chosen.
2.1               Elevations
                                                  continuing. Any difference between the soil conditions                              Internal Linings (Wet areas)                                                                                                                                               Treated timber
                                                  encountered on the site and the documentation shall be                              6.0mm Villaboard fixed in accordance with manufacturers                            The owner is responsible for the selection of surface finishes in the pedestrian        The design of this building includes provision for the inclusion of treated timber
2.2               Elevations                                                                                                                                                                                             trafficable areas of this building. Surfaces should be selected in accordance with      within the structure. Dust or fumes from this material can be harmful. Persons
                                                  reported to the Engineer before continuing site preparation.                        specification. Waterproof all wet areas in accordance with AS                      AS HB 197:1999 and AS/NZ 4586:2004.                                                     working on or in the building during construction, operational maintenance or
                                                  Finished ground levels to fall 1:20 for 1m from perimeter of                        3740                                                                                                                                                                       demolition should ensure good ventilation and wear Personal Protective
3.1/1             Section A - Part 1
                                                  building.                                                                                                                                                              Steps, loose objects and uneven surfaces                                                Equipment including protection against inhalation of harmful material when
                                                                                                                                      Ceiling Framing                                                                    Due to design restrictions for this building, steps and/or ramps are included in        sanding, drilling, cutting or using treated timber in any way that may cause
3.1/2             Section A - Part 2                                                                                                                                                                                     the building which may be a hazard to workers carrying objects or otherwise             harmful material to be released. Do not burn treated timber.
                                                  Footings and Slab                                                                   TS20 ceiling battens typical @450mm max. centres.                                  occupied. Steps should be clearly marked with both visual and tactile warning
3.2/1             Section B - Part 1
                                                  Footings and slab construction shall to be in accordance with                                                                                                          during construction, maintenance, demolition and at all times when the building         Volatile organic compounds
                                                  engineers design and detail and NCC 3.2. Slab on ground is to                       Fire safety                                                                        operates as a workplace.                                                                Many types of glue, solvents, spray packs, paints, varnishes and some cleaning
                                                  be monolithic to be in accordance with engineers design and                         Fire separation to be provide in accordance with NCC 3.7.1                                                                                                                 materials and disinfectants have dangerous emissions. Areas where these are
3.2/2             Section B - Part 2                                                                                                                                                                                     Building owners and occupiers should monitor the pedestrian access ways and             used should be kept well ventilated while the material is being used and for a
                                                  detail and AS 2870 to provide a termite barrier. Termite barriers                   where applicable. Smoke alarms to be in accordance with NCC                        in particular access to areas where maintenance is routinely carried out to             period after installation. Personal Protective Equipment may also be required.
3.3               Section C
                                                  to comply with AS 3660.1 and NCC 3.1.3. Approved 'Kordon'                           3.7.2.                                                                             ensure that surfaces have not moved or cracked so that they become uneven               The manufacturer’s recommendations for use must be carefully considered at all
                                                  termite barriers are required to perimeter and penetrations of                                                                                                         and present a trip hazard. Spills, loose material, stray objects or any other           times.
                                                  new and modified slabs. All installation and application of the                     Light and Ventilation                                                              matter that may cause a slip or trip hazard should be cleaned or removed from            Synthetic mineral fibre
3.4               Section D                                                                                                                                                                                              access ways.                                                                            Fibreglass, rockwool, ceramic and other material used for thermal or sound
                                                  termite management systems are to be carried out in strict                          Light and ventilation to be in accordance with NCC 3.8.4 &                                                                                                                 insulation may contain synthetic mineral fibre which may be harmful if inhaled or
3.5               Section E
                                                  accordance with the manufacturers specifications - guarantees                       3.8.5.                                                                             Contractors should be required to maintain a tidy work site during construction,        if it comes in contact with the skin, eyes or other sensitive parts or the body.
                                                  are required by the owner from the manufacturer / installer of                                                                                                         maintenance or demolition to reduce the risk of trips and falls in the workplace.       Personal Protective Equipment including protection against inhalation of harmful
                                                  the termite barriers. Provide moisture barrier (200UM) under                        Floor Wastes                                                                       Materials for construction or maintenance should be stored in designated areas          material should be used when installing, removing or working near bulk
5.1               Schedules                                                                                                                                                                                              away from access ways and work areas.                                                   insulation material.
                                                  slab with 200mm laps. Securely tape joints.                                         Floor wastes to be provided to all wet areas with floors graded
5.2               Schedules
                                                                                                                                      to floor wastes.                                                                   Falling objects                                                                         Timber finishes
                                                  Framing                                                                                                                                                                Loose materials or small objects                                                        This building contains finished timber products which have an applied finish.
                                                  All timber framing to be in accordance with NCC 3.4, the                            Stairs and Balustrades                                                             Construction, maintenance or demolition work on or around this building is likely       Areas where finishes are applied should be kept well ventilated during sanding
5.3               Schedules                                                                                                                                                                                              to involve persons working above ground level or above floor levels. Where this         and application and for a period after installation. Personal Protective Equipment
                                                  Building Act 1975 and AS 1684.2 National Timber Framing Code                        Stairs and balustrades to be in accordance with NCC 3.9.2.                         occurs one or more of the following measures should be taken to avoid objects           may also be required. The manufacturer’s recommendations for use must be
                                                  N3 and in accordance with engineers design and detail. All                          where required.                                                                    falling from the area where the work is being carried out onto persons below.           carefully considered at all times.
                                                  external timber to be H3 treated or natural durable hwd timber.                                                                                                        Prevent or restrict access to areas below where the work is being carried out.
                                                  All internal structural timber to be h2 treated.                                    Setout                                                                             Provide toeboards to scaffolding or work platforms.                                     Confined spaces
                                                                                                                                                                                                                         Provide protective structure below the work area.                                       Excavation
                                                                                                                                      House to be setout by a registered surveyor. Surveyor to                           Ensure that all persons below the work area have Personal Protective                    Construction of this building and some maintenance on the building will require
                                                  Masonry                                                                             provide certificate at frame and completion stage for                              Equipment.                                                                              excavation and installation of items within excavations. Where practical,
                                                  Masonry to comply with NCC 3.3 and AS3700-2001 and to be in                         confirmation of building setout and heights.                                                                                                                               installation should be carried out using methods which do not require workers to
                                                  accordance with engineers design and detail. Provide                                                                                                                   Building components                                                                     enter the excavation. Where this is not practical, adequate support for the
                                                                                                                                                                                                                         During construction, renovation or demolition of this building, parts of the            excavated area should be provided to prevent collapse. Warning signs and
                                                  weatherproofing in accordance with NCC 3.3.4.                                        Energy Efficiency                                                                 structure including fabricated steelwork, heavy panels and many other                   barriers to prevent accidental or unauthorised access to all excavations should
                                                                                                                                      The house is to have an energy assessment carried out by an                        components will remain standing prior to or after supporting parts are in place.        be provided.
                                                  Wall cladding                                                                       accredited professional to verify that the building complies as a                  Contractors should ensure that temporary bracing or other required support is in
                                                  All external lined walls to be in accordance with NCC 3.5.3. All                    energy rating of not less than 6 stars as per the requirements of                  place at all times when collapse which may injure persons in the area is a              Enclosed spaces
                                                                                                                                                                                                                         possibility.                                                                            Enclosed spaces within this building may present a risk to persons entering for
                                                  wall cladding systems and fixings to be in accordance with                          the Queensland Development Code (QDC) MP 4.1.                                                                                                                              construction, maintenance or any other purpose. The design documentation
                                                  manufacturers specifications.                                                                                                                                          Mechanical lifting of materials and components during construction,                     calls for warning signs and barriers to unauthorised access. These should be
                                                                                                                                      The building shall have a energy efficient lighting to a min. of                   maintenance or demolition presents a risk of falling objects. Contractors should        maintained throughout the life of the building. Where workers are required to
                                                  Roof Construction                                                                   80% of all fittings as per the requirements of the QDC.                            ensure that appropriate lifting devices are used, that loads are properly secured       enter enclosed spaces, air testing equipment and Personal Protective
                                                                                                                                                                                                                         and that access to areas below the load is prevented or restricted.                     Equipment should be provided.
                                                  Timber & steel roof framing to be in accordance with structural
                                                  engineers design and detail. Roof cladding to be 0.42mm                             Any air conditioning installed in the premises is to have an EER                    Traffic Management                                                                     Small spaces
                                                  COLORBOND® steel BlueScope Lysaght TRIMDEK® roof                                    of at least 2.9 as per the requirements of the QDC.                                Parking of vehicles or loading/unloading of vehicles on this roadway may cause          Some small spaces within this building will require access by construction or
                                                  sheeting to be fixed in accordance with manufacturers                                                                                                                  a traffic hazard. During construction, maintenance or demolition of this building       maintenance workers. The design documentation calls for warning signs and
                                                                                                                                                                                                                         designated parking for workers and loading areas should be provided. Trained            barriers to unauthorised access. These should be maintained throughout the life
                                                  specifications to be fixed in accordance with manufacturers                         All shower roses are to have a min. 3 star water efficiency                        traffic management personnel should be responsible for the supervision of these         of the building. Where workers are required to enter small spaces they should
                                                  specifications. Roof framing to be in accordance with structural                    labelling and standards rating as per the requirements of the                      areas.                                                                                  be scheduled so that access is for short periods. Manual lifting and other manual
                                                  engineers design and detail.                                                        QDC.                                                                                                                                                                       activity should be restricted in small spaces.
                                                                                                                                                                                                                         Construction of this building will require loading and unloading of materials on
                                                                                                                                                                                                                         the roadway. Deliveries should be well planned to avoid congestion of loading           Public Access
                                                          Rainwater Goods                                                        All toilet cisterns are to be dual flush and to have a min. 4 star                      areas and trained traffic management personnel should be used to supervise   Public access to construction and demolition sites and to areas under
                                                          All gutters and downpipes to be in accordance with                     water efficiency labelling and standards rating as per the                              loading/unloading areas.                                                     maintenance causes risk to workers and public. Warning signs and secure
                                                          manufacturers specifications and NCC 3.5.2. Provide fall of min.       requirements of the QDC.                                                                                                                                             barriers to unauthorised access should be provided. Where electrical
                                                          1:500 for eave gutter and 1:100 for box gutters. All internal box                                                                                 Busy   construction and demolition    sites present  a risk of collision where            installations, excavations, plant or loose materials are present they should be
                                                                                                                                                                                                            deliveries and other traffic are moving within the site. A traffic management plan        secured when not fully supervised.
                                                          gutters to have overflow spitters at all rain water outlets.           All  tapware   servicing kitchens, laundry tubs and basins are  to         supervised by trained traffic management personnel should be adopted for the
                                                          Downpipes to be spaced not more than 12m and within 1.2m of            have a min. 3 star water efficiency labelling and standards rating         work site when appropriate as determined by the builder.                                  Operation use of the building
                                                          valley gutters. All storm water disposal to be in accordance with      as per the requirements of the QDC .                                                                                                                                 This building has been designed as a residential building. If it, at a later date, is
                                                          hydraulic engineers design and detail. All roof drainage systems                                                                                  Services                                                                                  used or intended to be used as a workplace, the provisions of the Work Health
                                                                                                                                                                                                            Rupture of services during excavation or other activity creates a variety of risks        and Safety Act 2011 or subsequent replacement Act should be applied to the
                                                          and fixings to be in accordance with manufacturers                     In a new class 1 building hot water is supplied by a–                      including release of hazardous material. Existing services are located on or              new use.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              /Users/benthornton/Docs/Cadfiles/1901 - Seeto/Archicad/23072020/1901.pln

                                                          specifications. All storm water drainage to be in accordance with      (a) heat pump or a solar hot water system that is eligible   to
                          sbt designs pty ltd t/a
                          Skale Building Design           hydraulic engineers design and detail.
                                                                                                                         builder receive:
                                                                                                                                                                                          Chris Fletcher around this site. Where known,  project            Residence
                                                                                                                                                                                                                                                these are identified on the plans but the exact
                                                                                                                                                                                          Director / Builderlocation and extent of services may vary from that indicated. Services should be
                                                                                                                                                                                                                                                                                                                             lot no.
                                                                                                                                                                                                                                                                                                      Other high risk activity
                                                                                                                                                                                                                                                                                                                                                                                            9              H      Revised Construction issue                                                    20/8/20
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           project number
                          Mobile: 0412 025 657
                                                                                                                                 (i) in a building with 3 or more bedrooms, at least 22 Renewable
                                                                                                                                                                                          Squire Developmentlocated   using
                                                                                                                                                                                                                  Group     anLtd
                                                                                                                                                                                                                          Pty  appropriate service (such Dereke
                                                                                                                                                                                                                                                             as Dial Before& YouMelanie          SeetoAll
                                                                                                                                                                                                                                                                                   Dig), appropriate                          plan
                                                                                                                                                                                                                                                                                                          electrical work should       no. out in accordance with Code of Practice:
                                                                                                                                                                                                                                                                                                                                  be carried                                        99140                  G      Revised Construction issue                                                    23/7/20
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           1901
                                                                                                                                                                                          0412 743 408 excavation practice shouldfor

skale
                                                                                                                                                                                                                                          be used and, where necessary, specialist contractors        Managing Electrical Risks at the Workplace, AS/NZ 3012 and all licensing                             F      Revised Construction issue                                                     9/7/20
                          skale.com.au                    Windows     & Glazing                                                  Energy    Certificates; or                                                 should be used.                                  71 Noosa River Drive                     requirements.           drawn                                                        BT                                                                                                              drawing number
                                                                                                                                                                                                                                                                                                                                                                                                           E      Revised BA issue                                                              29/6/20
                                                          Windows and glazed doors are to be selected aluminium framed           (ii) in a building with less than 3 bedrooms, at least 14                                                                                                            All work using Plant should be carried out in accordance with Code of Practice:
      building design
                          [email protected]
                                                          with selected clear anodised finish to comply with AS 2047. All
                          A.C.N. 123 976 296 QBCC: 1143 609                                                                      Renewable Energy Certificates; or                                          Overhead power lines are nearat or on this site. Noosa
                                                                                                                                                                                                                                                                These pose North             Shore Managing Risks of Plant
                                                                                                                                                                                                                                                                              a risk of electrocution                         scale         (A2)
                                                                                                                                                                                                                                                                                                                                 at the Workplace.                            1:100, 1:1                  Rev     Details                                                                         Date     1.0                   H             © Skale Building Design
                                                          fixings to comply with AS 1288 and AS 2047 for the nominated           (b)gas hot water system with an energy rating of at least five             if struck or approached  by  lifting devices  or other plant and   persons   working      All work  should be  carried out in accordance with Code  of Practice:  Managing
Log in to download the original file

Skale plans.pdf · 12.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.