Original source · versioned page text
Delegated Report - Code - Planning OPW21 0038
Author Development Engineer, Laurie Schreck Development Assessment APPLICATION DETAILS Application No. OPW21/0038 Applicant Sunshine Coast Implant Clinic Pty Ltd Proposal Operational Works - Drainage Works, Earthworks, Landscaping, Stormwater, Vehicle Crossover Properly Made Date 10 February 2021 Information Request Date 24 February 2021 Information Response Date 30 March 2021 Decision Due Date 24 May 2021 Report Completed Date 29 April 2021 Report Reviewed By Mark Lewis 30 April 2021 PROPERTY DETAILS Property Address 75 Southern Cross Pde Sunrise Beach Qld 4567 RP Description Lot 671 RP 225123 Land Area 849.0000 m² Existing Use of Land Residential STATUTORY DETAILS SEQRP Designation Urban Footprint Zone Medium Density Residential Precinct Not Applicable Local Plan Area Not Applicable Overlays Landslide Hazard Overlay (Moderate Hazard Area) Assessment Type Code PROPOSAL The application seeks approval for an Operational Works permit for drainage works, earthworks, landscaping, stormwater and a vehicle crossover. The locality and proposal plan are included below. Figure 1 – Locality Figure 2 – Site Plan Figure 3 – Floor Plan site details Background This Operational Works application seeks to gain approval for a Development Permit for drainage works, earthworks, landscaping, stormwater and a vehicle crossover at 75 Southern Cross Pde, Sunshine Beach. These works form part of a higher order MCU approval (MCU19/0118) for a proposed residential duplex. Site Description The land parcel (currently zoned as Medium Density Residential) is located on a north/northeast facing slope with the land around the existing single dwelling mapped as a Moderate Hazard Landslide Area. The existing single dwelling will be demolished to make way for the proposed residential duplex. Surrounding Land Uses Medium Density Residential Surrounding. assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; and Noosa Plan 2020. Noosa Plan 2020 The following codes from the Noosa Plan 2020 are applicable to this development: Driveways and Parking Works Code; Earthworks Works Code; Landscaping Works Code; and Water Quality and Drainage Code. The subject site is located in Sunshine Beach and is zoned Medium Density Residential. The proposed use is identified as a consistent use within the zone and is required to follow a code assessable application process. cONSULTATION Referral Agencies Not Applicable Internal Council Referrals The application was forwarded to the following internal Council officers for review and/or comment: Noosa Council’s Ecologist reviewed the amended Landscaping Plans for 75 Southern Cross Pde. He advised the amended Landscaping plans satisfy the applicable requirements. conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No OPW21/0038 for an Operational Works - Drainage Works, Earthworks, Landscaping, Stormwater and Vehicle Crossover situated at 75 Southern Cross Pde Sunrise Beach Qld 4567 and described as Lot 671 RP 225123, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW21/0038 Street address: 75 Southern Cross Pde Sunrise Beach Qld 4567 Real property description: Lot 671 RP 225123 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Operational Works - Drainage Works, Earthworks, Landscaping, Stormwater and Vehicle Crossover. CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 200903-00 B Duplex Development 75 Southern Cross Parade Sunshine Beach, Qld, 4567 – Cover Page as prepared by DME Projects March 2021 200903-01 A Duplex Development 75 Southern Cross Parade Sunshine Beach, Qld, 4567 – Existing Features as prepared by DME Projects February 2021 200903-02 B Duplex Development 75 Southern Cross Parade Sunshine Beach, Qld, 4567 – Proposed Layout as prepared by DME Projects March 2021 200903-03 B Duplex Development 75 Southern Cross Parade Sunshine Beach, Qld, 4567 – Vehicle Tracking as prepared by DME Projects March 2021 200903-04 B Duplex Development 75 Southern Cross Parade Sunshine Beach, Qld, 4567 – Extent of Earthworks as prepared by DME Projects March 2021 200903-05 A Duplex Development 75 Southern Cross Parade Sunshine Beach, Qld, 4567 – Earthworks Sections Sheet 1 of 3 as prepared by DME Projects February 2021 200903-06 A Duplex Development 75 Southern Cross Parade Sunshine Beach, Qld, 4567 – Earthworks Sections Sheet 2 of 3 as prepared by DME Projects February 2021 200903-07 A Duplex Development 75 Southern Cross Parade Sunshine Beach, Qld, 4567 – Earthworks Sections Sheet 3 of 3 as prepared by DME Projects February 2021 200903-09 A Duplex Development 75 Southern Cross Parade Sunshine Beach, Qld, 4567 – Notes as prepared by DME Projects February 2021 CD-000 B Duplex – 75 Southern Cross Parade Sunshine Beach – Cover Sheet as prepared by Project Urban 18 March 2021 CD-001 B Duplex – 75 Southern Cross Parade Sunshine Beach – Specification Notes as prepared by Project Urban 18 March 2021 CD-101 B Duplex – 75 Southern Cross Parade Sunshine Beach – Landscape Plan as prepared by Project Urban 18 March 2021 CD-200 B Duplex – 75 Southern Cross Parade Sunshine Beach – Construction Details as prepared by Project Urban 18 March 2021 Arboricultural Report 75 Southern Cross Parade, Sunrise Beach as prepared by Brendan Martin (Director/Principal Consulting Arborist) 18 March 2021 CURRENCY PERIOD The Currency Period for this development approval lapses if the development has not substantially started by 14 May 2023 unless an application to extend the currency period is approved by Council. SITE SPECIFIC CONDITIONS Prior to the prestart meeting, an amended Stormwater Plan must be submitted to Council that relocates the stormwater line to outlet into the existing Stormwater pit on Southern Cross Pde at the frontage of the lot. The location of the relocated line must align with the recommendations in the Arborists Report and be generally in accordance with Councils standard drawings. The following sketch may be used as a guide for the relocation. PRIOR TO COMMENCEMENT OF WORKS Engineering Submit amended plans to Council as described in the List of plans requiring amendments. Plans must be submitted and approved prior to the pre-start meeting. Tree protection fencing must be installed in accordance with the Arborist Report and under the supervision of the Project Arborist. All necessary approvals from external service providers (eg Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. Copies of the approved plans, duly signed by the consultant Registered Professional Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer Construction at the “pre start” meeting. A condition report of the drainage system must be completed for agreement at the prestart meeting. The condition report is to include a CCTV inspection of the existing pipe between the roadside gully pit and the next downstream pit (located approximately 10m downstream). A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting / prior to any works commencing. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Landscape works; Electrical reticulation works; Erosion and sediment control works; and Other relevant parties. A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction; Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased; Proposed fencing to the site during the construction phase of the development; Adequate parking arrangements for construction workers; and No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Further parked trucks must have engines turned off. Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures; Works programme identifying key components of the works and their respective durations; Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues; Include a post out to the local residents and businesses advising of the proposed development, the expected time frames and the site contact details; Include signage in prominent locations on the boundaries of the site advising of the proposed development, the expected time frames and the site contact details; Identification of complaint management procedures including: Contact details for the on-site manager; and Dispute resolution procedures. For haulage operations involving significant volumes of fill material or excavated material being transported onto or off the site: details on the location of external fill sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant’s expense. DURING CONSTRUCTION Engineering The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice; The relevant conditions of the higher order Material Change of Use approval MCU19/0118 to which this approval relates; All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines; and The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Works within Road Reserve/Reinstatement Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. The verge is to be modified such that the maximum crossfall for the verge is 5%, except in the location of a pathway where the maximum crossfall is to be 2.5%. Electrical conduits or other services proposed to be installed within existing and proposed road reserves under existing sealed carriageways, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is not permitted, unless specifically approved by Council. Pathways All pathways must be constructed in accordance with the following requirements: All footpath/cycleway must comply with Council’s Standard Drawing RS-065; Provision must be made for disabled access at all kerb crossings associated with pathways, in accordance with Council's current standards; All paths must have a slip resistant surface; Expansion and contraction joints must provide a flush finish. Installation of joints by saw cutting is preferred to ensure a smooth ride for cyclists; and The required work includes any modifications to ensure the footpath finishes flush with all existing service covers and the like, or alternatively these services are raised or altered, so as not to create a pedestrian safety hazard. Pathways must be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS1428 Design for access and mobility. Site Access and Driveways Driveway crossovers must be constructed in accordance with Council’s Standard Drawings RS-049 and RS-050. Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. The following must be complied with during the construction of the required crossover/driveway: The driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete; The driveway must be constructed so as not to concentrate stormwater runoff onto neighbouring properties; Underground service conduits for water supply, electricity and any other services must be provided as part of the access driveway; Where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path; and The property access must be located a minimum of 1m clear of existing power poles, streetlights or other signage. The developer is responsible for any necessary relocation of existing services to provide this clearance and must contact the relevant service authorities and comply with their requirements in relation to these works. Earthworks and Retaining Walls All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical testing undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ and submitted to Council prior to the commencement of the use. Fall protection must be provided to retaining walls that are over 1m high. Slope and batters are a maximum grade of: 1 in 6 where in proximity to waterbodies 1 in 4 for grassed areas. 1 in 3 for planted areas 1 in 2 for combined structural engineering and planting solutions. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (e.g. by blocking or interfering with natural overland flows). Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3. Prior to the completion of the development, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium- to long-term (refer to E&SC Advisory Notes). For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Erosion and Sediment Control Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection Regulation 2019) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. Sediment and erosion control measures must be in place prior to works commencing. If such measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such fines can be issued if sediments from the site are found to enter or have the potential to enter Council’s stormwater system, natural waterways, any downstream stormwater filtration system or adversely impacting on other properties. The sediment and erosion control design and measures have NOT been approved, it is the site's Supervising Engineer who is responsible for ensuring that the sediment and erosion control measures have: Been duly designed by an RPEQ or CPESC and constructed in accordance with "best practise" methods, Been revised by an RPEQ or CPESC to address the issues raised by changes in the projected construction schedule and/or methods, Been revised to address predicted rainfall events, and Achieve the desired environmental outcomes. Council may request further controls to be installed should the implemented measures be found inefficient. The erosion and sediment control measures must be designed, installed and maintained in accordance with the supervising engineer instructions and the current best practice standards * (Refer to Advisory Note). The developer must ensure non-essential exposure of soil is prevented by restricting the extent of disturbance and minimising the duration of soil exposure to adverse weather conditions and effectively turf, cover or stabilise any disturbed area without delay and prior to rainfall occurring. The developer must ensure sediment does not leave the site or enter onto adjoining properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or machinery. It is essential to implement appropriate approved erosion and sediment control measures throughout the site during all phases of construction including vehicle shakedown pad/grid (or similar) at the access to the construction site. Where sediments or other contaminants are deposited on a road, they must be removed so as not to enter Council’s drainage system or waterways. Prior to the completion of the development and commencement of use, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Drainage paths must be regularly inspected to ensure the sediment fences/measures are not being bypassed as a result of sediment build up. Sediment laden runoff must be prevented from leaving the subject site and entering neighbouring properties and/or stormwater systems. A log book for the Erosion and Sediment Control measures and inspections must be maintained by the site manager and made readily available to Council when requested. The supervising engineer must verify and endorsed the E&SC measures upon their installation, and periodically check these measures and the log book during construction and the stabilisation stages. Any defects in erosion and sediment control devices, such as sediment fences, are to be inspected and documented. Upon Inspection, the contractor is to determine whether the device should be replaced or repaired. Documentation is to include how the damage was caused and what measures can be implemented to reduce the possibility of repeat occurrences. Any damage to either permanent or temporary water quality control structures or devices is to be immediately rectified at the contractor’s expense. The effectiveness of the erosion and sediment control devices must be monitored. All ESC measures are to be inspected: At least daily (when work is occurring on site) or weekly (when work is not occurring on site); or Within 24 hours of expected rain; or Within 18 hours of a rainfall event (i.e. an event of sufficient intensity and duration to mobilise sediment on site). Landscape The finished level of all mulch in garden beds and landscaped medians is to be a minimum of 50mm below the level of the adjacent top of kerb. All landscaping is to be constructed in accordance with Council’s Planning Scheme Policy PSP2 Landscaping. An inspection is to be carried out with the relevant Council officers, the Contractor and Supervising Engineer after road centrelines have been established, and prior to clearing being carried out. This inspection is to deal with the limits of clearing to be carried out for this development. This meeting is to take place prior to the “Pre-start” meeting. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: Where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or Where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. FOLLOWING CONSTRUCTION Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. Bonds Bonds must: Meet the requirements of council’s relevant Planning Scheme Policy for performance and uncompleted works; Be calculated using a schedule of works and relevant bond equation Include GST; Have approval of the bond calculations and amount from Council prior to lodgement; Be lodged with Council and accompanied by the Bond Administration Fee/s; and Be requested for release by writing to Council, when relevant approval requirements have been met. As Constructed Plans and ADAC XML Files (Council) Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory “As-Constructed” records must be submitted to Council. The bundle of “As Constructed” information shall include: As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files); ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed) prepared in accordance with industry standards and recorded in “MGA - UTM56 / GDA94” projection; Please Note: Further information and advice relating to the as-constructed drawing presentation, as-constructed survey capture and associated guidelines for preparation of a compliant ADAC XML digital file are available on the webpage titled “As-Constructed Guidelines” and accessible at the Noosa Council Website: Planning & Development / Development Tools & Guidelines / As-Constructed Guidelines; The “As-Constructed” drawings will require certification by a: Qualified experienced Civil Engineer (RPEQ) confirming design intent and conformance with applicable standards and specifications, along with the relevant descriptions of assets, services and structures; and Licensed Surveyor in regard to the cadastral and locational information, levels and applicable survey datum. The data must be in accordance with Council’s “Planning Scheme Policy 6 – Engineering Design Standards”, and fully detail the levels for all engineering works including but not limited to the drainage network and structures, finished ground and pavement surface levels; Landscaping, including all assets and improvements within parks, open space and road reserves areas are to be shown on an accompanying separate landscape plan (prepared in .dwg file format with accompanying hardcopy PDFs) and include a compliant ADAC XML file. Details of the landscaping and all associated assets and improvements may be included in the ADAC XML digital file prepared for associated civil infrastructure, or alternatively, be provided as a separate ADAC XML digital file containing landscape and asset information only; and The building envelope data must be submitted in both hardcopy and digital format (ADAC XML Digital File). ADAC - Asset Design As Constructed, is to be prepared in accordance with industry standards and recorded in “MGA - UTM56 / GDA94” projection. On Maintenance All municipal works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy prior to commencement of the use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council: Certification that all works have been undertaken and completed in accordance with the requirements of this Permit; As Constructed details in accordance with Council’s Planning Scheme Policy; and Maintenance and operational manuals for all proprietary or site specific devices. Off Maintenance Prior to requesting an Off Maintenance inspection the developer must provide a written request for the Off Maintenance inspection. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged where: A Council inspection reveals works do not comply with approval requirements; and Submitted certification falsely states works comply with approval requirements. A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the inspection. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes As this driveway is a private structure, the owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the driveway to ensure that the driveway is constructed in accordance with standard drawings RS-049 and RS-050. Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by an RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise. Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include International Erosion Control Association Australasia Best Practice Erosion and Sediment Control Qualified Person, for the purpose of erosion and sediment control is a Certified Professional in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional Engineer of Queensland (RPEQ). As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the commencement of the use: Methods of stabilisation are: Appropriate for slopes and slope lengths; and Are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual. Landscaping Qualified Person, for the purpose of: Managing Fauna protection is considered to be a certified Fauna Spotter Catcher. Public amenity trees are defined as any tree located within public streets, parks or areas that will become publically owned as a result of this development. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 2 of 14 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image1.png (image text)] Runchine Beaeuisice) Py Sunshine oup Co [Attachment: image2.png (image text)] / Clie £Snatenconnecroon Yo se Unetabe® 0 Uw REQUIREMENTS susuneacesTo onan See 5Ceternea an TeLeconelncaON® CONNECTONS TO SUTHORTES STANDARDS ula w re ten "ANI Bi ak tatty ig 3550 3 # e UNIT 2 wa '+3550080W sopra orm # 23 UNIT 1 2 H ® tle Co “SET 0g] gOS \ som oo ~ he: some : $ $ emmpgem : sn Mee omer ere S PROPOSED LAYOUT —Tomnsurerunm——serenrosteucrunat Seer MMR a Sas [Attachment: image3.png (image text)] [= J 3 PEEL ’ sem 4 _om | I at a= a | 7 aed VM roo nex EEEEL a =a
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.