Skip to the record
Every meeting, every word.

Council archive · source document

6. Wave Pool water level management report · MCU19/0117

of 5

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

3.0 Conclusions and Recommendations
As noted above we have demonstrated that the water levels in the wave pool can be successfully
and simply managed using two 280,000 litre water tanks, one with an unsealed base for disposal
of excess water via infiltration and one for storage for top up during dry periods. This may still result
in some “down” days where the water level in the pool exceeds the operational tolerance level, so
there is an option to double the number of tanks to reduce (or virtually eliminate) any “down” days.




Doug Reynolds, Director – Civil Group
PREQ 9072
07 5449 9600 | [email protected]
TOD consulting engineers




                                              Page 3 of 5

Used in these records

About this file

File size
233 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

6. Wave Pool water level management report.pdf · 233 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.