6. Wave Pool water level management report · MCU19/0117
Appendix B: 5% Driest Rainfall & Evaporation Rates
Page 5 of 5
[OCR of page images]
TOD
engineers & project managers
Appendix B: 5% Driest Rainfall & Evaporation Rates
NOOSA NORTH SHORE WAVE POOL - WATER LEVEL MANAGEMENT
Location Noosa Heads, QL, AUS
DataSource http:/Awww.bom.gov.au/watl/evaporation/ . "
hittp:/ Awww.bom.gov.au/jsp/ncc/climate_averages/rainfall/indexjsp engineers & project managers
Sth %ile
SurfPool Area (m2) 4,000 Monthly
Annual Jan Feb Ma Apr May Jun Jul Aug Sep Oct Nov Dec
Evaporation (mm) 1,300 150 150 125 8 50 50 8 80 100 125 125 150
Evaporation (L) 5,200,000 600,000 600,000 500,000 320,000 200,000 200000 320,000 320,000 400,000 500,000 500,000 600,000
5% Rainfall (mm) 1,090 as 10 412 94.1 333 48.8 B7 22 1 39 22.4 12 32
Rainfall (L) 4,360,000 40,000 164,800 376,400 133,200 195,200 94,800 8,800 4,000 15,600 89,600 48,000 128,000
Net Rain(+)/Evap(-) ** -840,000 (_) -560,000 ~435,200 -123,600 -186,800 4,800 -105,200 -311,200 -316,000 -384,400 ~410,400 -452000 ~472,000
(varies monthly)
Less Operational Tolerance 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000
cumulative shortfall (Oct-Feb)
Shortfall = -329,600 litres -160,000 -35,200 -10,400 -52,000 -72,000
** note annual is not total of individual months but represents the 5%ile annual figure
** Does not take into account losses from: filtration backwash; bather splash or carry-out; and, airborn mist created from breaking waves.
Page 5 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
6. Wave Pool water level management report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 233 KB (small file)
- File type
No other editions are linked here.