Planning & Environment Court Appeal No. 2698 Of 2025 – Application For A Material Change Of Use For A Dwelling House 6 Arakoon Crescent, Sunshine Beach · Attachment 2 - Proposal Plans
Plans and drawings: the text below has words only, no drawings.
Very large file (67.7 MB): may take a few minutes to open.
6 5 4 1.9m 3 2 1
4230 1630 1900 2740 1490
1 1 1 1 1 1 1
site boundary
site boundary
N320.01N400.07 N400.00 N400.08 N400.01 N400.06 N320.00
roof
RL33.950
900
parapet
RL33.050
3000
gls01 gls01 ngl +8.0m
2m
bal02
2.01m upper floor
con01 RL30.050
con01
3m
3m
3150
gls01
2.03m bal02 ground floor
7.59m
7.73m
RL26.900
con01
4.5m
3150
4.5m
ngl +2.0m
lower floor
RL23.750
rgl existing
ngl
general notes general items legend
RL 60.200 spot level L1 (level) window code. refer to window component code. 20 step up code. note step line
1. all works to be carried out in accordance with the general construction 6. levels and services locations for civil works may vary from those shown -
notes in coversheets of this package. verify all levels and services locations prior to commencement of tos = top of step w01 (window ref) elevations + door/window dp01 (refer material code for similar) occurs on low side of level
2. all works to be carried out in accordance with the DA (if required) and BA construction. bos = bottom of step hardware schedules low lvl low lvl + 20 mm change
including drawings & conditions. 7. concrete profile and blockwork setout is provided on 220 (series) of RL = lvl at point (AHD typ)
3. handrails are required to all stairways where a change of level of drawings, refer to these for setout. licensed surveyor to establish grids.
RL xx.xxx top of wall (surface) level door/gate code. refer to window ceiling code hose cock. refer serivces
1000mm or greater occurs as per BCA 2013 Part 3.9.2.4. where discrepancies occur the 220 series drawings are to take L1 (level)
d01 elevations + door/window 2700 * heights are relative to assocaited schedule. client to confirm
4. where boundary locations are not clear, the builder shall arrange for precedent. (door/gate ref) height* hc
hardware schedules Ipb01 finish** finished floor locations
survey to locate the boundaries and complete an identification survey
* refer finishes schedule
prior to setting out the new work. SSL xx.xxx structural slab level
5. contours shown are existing and do not represent finished levels.
material code. refer finishes J0.1 joinery code. refer to cabinetry (cos) check on site
Ipb01 Ipb01 schedule (typical). elevations on 820 (series) and (mir) mirrored detail
FFL xx.xxx finished floor level (refer also to sanitary/ applicances/
level joinery
details on 830 (series) drawings (sim) similar detail
reference
lighting/services as appropriate) (part) partial detial
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0428
aca C 04/03/2024 townplanning review 4-6 Arakoon Crescent BV Investments Pty Ltd northern house SD N300.00 F SCALE 1 : 100
aca D 11/03/2024 client review Sunshine Beach QLD 4567
A3
east elevation
aca E 18/04/2024 client review
aca F 11/06/2024 DA issue review
schematic design 1:1 @
Document Set
Do not scale ID:
from 23546429
24063178
drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
Version: 1, Version Date: 28/08/2025
12/02/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.