Installation Guide - Load Support _v2021.3a

of 21
    Appendix: Neoloy Tough-Cells: Pre-Installation
    Site Preparation –Mandatory Items Checklist
No.     Description                           Responsibility         Images   Required    Status
                                               Client    PRS

                                              Preinstallation - General
1       Leveling, Drying and compaction         ✓
        of installation area

2       Preparing site for installation         ✓
        according to plan

3       Design approval                                  ✓
4       Filling material: quantity, quality     ✓
        (strength), and grading according
        to design requirements

5       Confirmation of laboratory results               ✓
6       Installation Supervision                         ✓
7       Delivery and reading installation       ✓        ✓
        guide

8       Installation Team                       ✓
9       Supply of geotextile fabrics            ✓
10      Monitoring and supervision              ✓        ✓
11      Ready-for-installation tools:           ✓




    PRS-EN-TD-LS-3000                                      17/21                         Ver. 2021.3

Log in to download the original (Installation Guide - Load Support _v2021.3a.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.