Installation Guide - Load Support _v2021.3a
Appendix: Neoloy Tough-Cells: Pre-Installation
Site Preparation –Mandatory Items Checklist
No. Description Responsibility Images Required Status
Client PRS
Preinstallation - General
1 Leveling, Drying and compaction ✓
of installation area
2 Preparing site for installation ✓
according to plan
3 Design approval ✓
4 Filling material: quantity, quality ✓
(strength), and grading according
to design requirements
5 Confirmation of laboratory results ✓
6 Installation Supervision ✓
7 Delivery and reading installation ✓ ✓
guide
8 Installation Team ✓
9 Supply of geotextile fabrics ✓
10 Monitoring and supervision ✓ ✓
11 Ready-for-installation tools: ✓
PRS-EN-TD-LS-3000 17/21 Ver. 2021.3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Installation Guide - Load Support _v2021.3a.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.