Original source · versioned page text
Installation Guide - Load Support _v2021.3a
Required Tools and Equipment
Palletized Neoloy Sections Stakes – iron, wood, other material
& Neo-clip™ (optional)
Pneumatic Stapler Air Compressor and Generator
& 1/2" (13 mm) Galvanized Staples (60 psi /4 bar pressure) & Pneumatic
Hammer with Head (optional)
Additional Geosynthetics
a) Geotextiles (if specified in the project design)
b) Geogrids (if specified in the project design)
Standard Construction Tools
c) Hand Tools – shovels, rakes, sledge hammers and nails, utility knives
d) Lumber – long planks and/or rectangular boards used for walking over empty cells
Mechanical Construction Equipment
a) Front-end loaders with buckets for the infill process, although excavators or dozers may be used.
b) Compaction equipment includes rammers, vibratory plates and rollers.
c) Water trucks and graders according to need.
PRS-EN-TD-LS-3000 6/21 Ver. 2021.3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Installation Guide - Load Support _v2021.3a.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.