Skip to the record
Search everything, all in one place.

Original source · versioned page text

Installation Guide - Load Support _v2021.3a

of 21
Required Tools and Equipment




              Palletized Neoloy Sections                         Stakes – iron, wood, other material
                                                                       & Neo-clip™ (optional)




                  Pneumatic Stapler                                 Air Compressor and Generator
          & 1/2" (13 mm) Galvanized Staples                      (60 psi /4 bar pressure) & Pneumatic
                                                                    Hammer with Head (optional)


Additional Geosynthetics
    a) Geotextiles (if specified in the project design)
    b) Geogrids (if specified in the project design)

Standard Construction Tools
    c) Hand Tools – shovels, rakes, sledge hammers and nails, utility knives
    d) Lumber – long planks and/or rectangular boards used for walking over empty cells

Mechanical Construction Equipment
    a) Front-end loaders with buckets for the infill process, although excavators or dozers may be used.
    b) Compaction equipment includes rammers, vibratory plates and rollers.
    c) Water trucks and graders according to need.




PRS-EN-TD-LS-3000                                         6/21                                             Ver. 2021.3

Log in to download the original (Installation Guide - Load Support _v2021.3a.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.