Skip to the record
Every meeting, every word.

Council archive · source document

Development Application IDAS Forms 1 & 6 - OPW12/0451

of 10

Text shows just the words. Original shows the document exactly as it was published.

                                                  ..




                                                                                                otlJU12/oLI- /
    111111                   Integrated Development Assessment System form


Application Details                              -     IDAS form 1                                                    11’’’"jii
                                                                                                                             80518767
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)


You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
                                                                                                                                        @
For all development applications, you must:

.
      complete this form (Application details          -
                                                           IDAS form 1)

.
      complete any other forms relevant to your application
.
      provide any mandatory supporting information identified on the forms as being required to accompany your
      application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.


Applicant details (note:the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is

correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)


Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.


                                                                Iprofessional   Tree Surgery




Fax number (non-mandatory)


e-mail address (non-mandatory)                                  [email protected]

                                                                                               Box:.   ~~J
Name/s (individual or company name in full)                     Bernard


For companies, contact name


Postal address                                                  Unit 12161 Gympie terrace called Sanoma


Contact phone number                                            10417756829
Mobile number (non-mandatory)


Fax number (non-mandatory)




  Department of Infrastructure and Planning                               QPlan                        ,


                                                                                                           .

                                                                                                           "
                                                                                                               ~-~. \. \
                                                                                                                -
                                                                                                                           Queensland
                                                                                                                    "Government
Full text of the other 9 pages

Page 2

ODD.
e-mail address (non-mandatory)




1. What is the nature of development proposed? (tick all applicable boxes)



o material change of use of premises
o building work
I:8J operational work
o reconfiguring a lot

2. What type of approval is being sought?



I:8J development permit
o preliminary approval
o both provide details below
                -




3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?



I:8J   No

DYes complete table A and then go to question 5
                -




4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)


Table B     -   street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

                                                                                  Lot n plan
                    Street Address
                                                                                  description
                                                                                                         Local government area
                    Unit   Street       Street name and official       Post             "Plan type       ...,
                                                                                                                ’fe.g. Logan,Cairns)
                                                                              Lot No.
                     No.    No.          suburb/locality name          code             and plan no.


            1       12     161      Gympie terrace                 4567                                 noosa



I:8J Street address / lot on plan
 Strret address / lot. on plan for the land adjoining or adjacent to the premises (appropriate for development in
owater
            e.g. jetty, pontoon)
Table C     -
                premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)


                    Coordinates (note: place each set of
                    coordinates in a separate row)                        Zone                                    Local government
                                                                                            Datum
                                                                        reference                                 area   (If applicable)
                      Easting       Northing   Latitude    Longitude

                                                                                        o GDA94
                                                                                        DWGS84
            1
                                                                                        o other




                                                                                                     Application Details    -
                                                                                                                                IDAS form 1
                                                                                                       Version 1.0 18 December 2009

Page 3

DDD
5. Total area of the premises on which the development is proposed (indicate hectares or m2)




6. Current usels of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)



                   units




7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)



to remove 2 Brushbox in court yard will need to call owner to gain access as locked gates



8. Is owner’s consent required for this application? (refer to notes at the end of this form for more information)



IZI   No

DYes complete either table D, table E or table F as applicable
               -




9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)



IZI No                                   DYes    -

                                                     complete table G



10. Identify if any of the following apply to the premises (tick applicable box/es)



o        adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) complete table H
                                                                                              -




o        on    strategic port land under the Transport Infrastructure Act 1994 complete table I
                                                                                  -




D        in a tidal water area     -

                                       complete table J

11. Are there any existing easements on the premises? (e.g.for vehicular access, electricity, overland flow,
      water, etc.)


IZI No      DYes      -
                          ensure the type, location and dimension of each easement is included in the    plans submitted

12. Does the proposal include new building work or operational work on the premises? (including any
      services)

IZI No DYes           -
                          ensure the nature, location and dimensions of   proposed works are included in plans submitted

13.ls the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
      end of this form for more information)


IZI No     -
               Go to question 15                     DYes


15. Has the local government agreed to apply a superseded planning scheme to this application under
      section 96 of the Sustainable Planning Act 2009?



IZI    No

DYes provide details below
               -




                                                                                                  Application Details   -
                                                                                                                            IDAS form 1
                                                                                                    Version 1.0 18 December 2009

Page 4

DDD
16. List below all of the forms and supporting information that accompany this application (include alllDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)

                                                                                                 Method of lodgement to
                              Description of attachment or title of attachment
                                                                                                   assessment manager


             1       HAVE MUD MAP




117. Applicant’s declaration
 !"VI By making this application, I declare that all information in this application is true and correct (note:it is
 I. unlawful to provide false or misleading information).


 Notes for completing this form


Question 8:
    Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
    for an application. Section 260(1)(e)of the Sustainable Planning Act 2009 provides that if the owner’s consent is
    required under section 263, then an application must contain, or be accompanied by, the written consent of the
    owner, or include a declaration by the applicant that the owner has given written consent to the making of the
    application.
    Owner’s consent is not required for a mobile and temporary ERA.


Question 9:
    Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
    regulation may require the application to be supported by certain evidence prescribed under the regulation.
    Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
    required to be given, and the evidence required, to support the application.

Question 13:
    The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
    long service leave levy is payable.
    The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
    are   prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:
    The portable long service leave levy need not be paid when the application is made, but the Building and
    Construction Industry (Portable Long Service Leave)Act 1991 requires the levy to be paid before a development
    permit is issued.
    Building and Construction Industry Notification and Payment Forms are available from any Queensland post
    office or agency, on request from QLeave, or can be completed on the QLeave website at
    www.gleave.gld.gov. au. For further information contact QLeave on 1800803481 or www.gleave.gld.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP)in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a

purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.


OFFICE USE ONLY



Date received
                 I                          I   Reference numbers
                                                                     I


                                                                                            Application Details   -
                                                                                                                      IDAS form 1
                                                                                               Version 1.0 18 December 2009

Page 5

ODD
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER



                                                      Council. I have been engaged as the private certifier for the
To:
                                                      building work referred to in this application.


Date of                                                                    BSA Certification         Building
                     Name
engagement                                                                 license number            classification/s




QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)



                                                                                 Date receipted
                                         QLeave Project   Amount                 form sighted by Name of officer who
               Description of the work                               Date paid
                                         Number           paid ($)               assessment          sighted the form
                                                                                 manager



          11
The Sustainable Planning Act 2009 (SPA)is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.




                                                                    @
                                                                     [email protected]

                                                  ~1-z,~~ <’’’? ~(9,,1’00
                                                                ,




                                                              0(’)’
                                                   ~OC’Q~~rv
                                                                  ~.v"t6/’
                                                                                     .I’


                                                                     "vq,~@ .~."
                                                                                           ,




                                                                                           Application Details   -
                                                                                                                     IDAS form 1
                                                                                               Version 1.0 18 December 2009

Page 6

     111111                   Integrated Development Assessment System form



Building or operational work assessable
against a planning scheme IDAS form 6                                            -




(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

This form must be completed for development applications for building works or operational work assessable against
a   planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all

necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:

.
       complete Applicant details     -
                                          IDAS form 1

.
       complete any other forms relevant to your application
.
       provide any mandatory supporting information identified on the forms as being required to accompany your
       application.


All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.


1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)



D building work complete table A
                    -

                                                     ~ operational work complete table B
                                                                            -




Table A



What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, moving or demolishing a building)?




What type of approval is being sought? (if you have indicated multiple works in the above question, please generate
another Table A to detail each approval request)



          D development permit                D preliminary approval

Are there any current approvals associated with this application? (e.g. material change of use)



          ~No                               DYes     -

                                                         provide details below




    Department of Infrastructure and Planning                            QPlan               k~\..’ Queensland
                                                                                             l_~’   Government

Page 7

DDD

Table B



       What is the nature of the operational work made assessable in the planning scheme? (tick applicable boxles)



          o road works               o stormwater             o water infrastructure
          o drainage Works           o earthworks             o sewerage infrastructure
          o landscaping              o sign age               I:8J clearing vegetation under the planning scheme
          o other please specify below
                  -




       What type of approval is being sought? (if you have indicated multiple works in the above question, please
       use an attachment to this form to detail each     approval request)

       I:8J development permit           o preliminary approval              o both specify below
                                                                                    -




       Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)



       I:8J No        DYes specify the number of lots being created
                             -




       Are there any current approvals associated with this application? (e.g. material change of use)



       I:8J No        DYes   -

                                 provide details below


2. What is the dollar value of the proposed building work? (inc GST, materials and
                                                                                          labOUr)1   $ 1,320.00




                                            Building and operational work assessable against a planning scheme IDAS form 6
                                                                                                              -




                                                                                            Version 1.018 December 2009

Page 8

DDD
3. Confirm the following mandatory supporting information accompanies this application

                                                                                Confirmation
                                                                                                  Method of lodgement
                                                                                of lodgement
All applications for operational works

site plans drawn to scale which show the following:

.  the location and site area of the land to which the application relates

   (relevant land)
.  the north point
.  the boundaries of the relevant land
.  the allotment layout showing existing lots, any proposed lots (including
   the dimensions of those lots), existing or proposed road reserves,           IZI confirmed
   building envelopes and existing or proposed open space (note:
   numbering is required for all lots)
.
   any existing or proposed easements on the relevant land and their
   function
.
   any access limitation strips
.  all existing and proposed roads and access points on the relevant land


a statement about how the proposed development addresses the local

government’s planning schemes and any other planning documents                  oconfirmed
relevant to the application

Applications for operational works involving earthworks (filling and excavating)


drawings showing:
.
   existing and proposed contours
.areas    to be cut and filled
.  the location and level of any permanent survey marks or reference
   stations used as datum for the works                                         oconfirmed
.  the location of any proposed retaining walls on the relevant land and
   their height
.  the defined flood level (if applicable)
.  the defined fill level (if applicable)

Applications for operational works involving roadworks

drawings showing:
.
   existing and proposed contours
.  the centreline or construction line showing chainages, bearings, offsets
   if the construction line is not the centreline of the road and all
   intersection points
.  information for each curve including tangent point chainages and
   offsets, curve radii, arc length, tangent length, superelevation (if
 applicable) and curve widening (if applicable)
.kerb lines including kerb radii (where not parallel to centreline) and

 tangent point changes (where not parallel to centreline)
.
 edge of pavement where kerb is not constructed                                 oconfirmed
.
   position and extent of channelisation
.  location and details of all traffic signs, guideposts, guardrail and other
   street furniture
.
   pavement markings including details on raised pavement markers
.
   catchpit, manhole and pipeline locations
.
   drainage details (if applicable)
.cross   road drainage culverts (if applicable)
.  concrete footpaths and cycle paths
.  location and details for access points, ramps and invert crossings
.
   changes in surfacing material

                                             Building and operational work assessable against a planning scheme   -
                                                                                                                      IDAS form 6
                                                                                                Version 1.0 18 December 2009

Page 9

DDD
                                                                                Confirmation
                                                                                                 Method of lodgement
                                                                                of lodgement

Applications for operational works involving stormwater drainage

drawings showing:
.
    existing and proposed contours
.
    drainage locations, diameters and class of pipe, open drains and
    easements
                                                                                Dconfirmed
.   manhole location, chainage and offset or co-ordinates and inlet and
    outlet invert levels
.   inlet pit locations, chainage and offset or co-ordinates and invert and
    kerb levels

Applications for operational works involving water reticulation


drawings showing:
.   kerb lines or edge of pavement where kerb is not constructed
.   location and levels of other utility services where affected by water
    reticulation works
.
    pipe diameter, type of pipe and pipe alignment
.  water main alignments
                                                                                D confirmed
.  water supply pump station details (if applicable)
.   minor reservoir details (if applicable)
.   conduits
.   location of valves and fire hydrants
.   location of house connections (if applicable)
.   location of bench marks and reference pegs

Applications for operational works involving sewerage reticulation

drawings showing:
.   location of all existing and proposed services
.   location of all existing and proposed sewer lines and manhole locations
.   location of all house connection branches
.kerb lines or edge of pavement where kerb is not constructed
.
 chainages
                                                                                O onfirmed
.
 design sewer invert levels
.
 design top of manhole levels
.
   type of manhole and manhole cover
.
   pipe diameter, type of pipe and pipe alignment
.  location of house connections (if applicable)
.sewer
           pump station details (if applicable)

Applications for operational works involving street lighting

drawings showing:
.  location of all light poles and service conduits
.  location of all other cross road conduits
.
   type of wattage and lighting
                                                                                Dconfirmed
.
   any traffic calming devices
.  additional plans for roundabouts and major roads (if applicable)
.  details of any variations to normal alignment
.  details of lighting levels




                                              Building and operational work assessable against a planning scheme IDAS form 6
                                                                                                              -




                                                                                              Version 1.0 18 December 2009

Page 10

DDD
                                                                               Confirmation
                                                                                                Method of lodgement
                                                                               of lodgement

Applications for operational works involving public utility services

drawings showing:
.
   any existing light poles and power poles
.
   any existing underground services
                                                                               Dconfirmed
.  details of proposed services
.  alternation to existing services

Applications for operational works involving landscaping works

drawings showing:
.  the location of proposed plant species
.a
     plant schedule indicating common and botanical names, pot sizes
   and numbers of plants
.
 planting bed preparation details including topsoil depth, subgrade
 preparation, mulch type and depth, type of turf, pebble, paving and           Dconfirmed
 garden edge
.the location and type of any existing trees to be retained
.construction details of planter boxes, retaining walls and fences
.the proposed maintenance period
.
 irrigation system details


Notes for completing this form:
.  This form can also be used for development applications for building works or operational works assessable

   against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
   mentioned, take it to mean the land use plan for the airport land.



Privacy -please            your assessment manager for further details on the use of information recorded in
this form.



                           ~I   .




                             ;q;)~
                                    "~

         eivedk"         ~1>/R~fe
                          <’?                  nce Numbers

                  ~
                  ~AOC>-
                   ’0, /<3
                             c.’),"
                               "-’~
The Sustainable       n’f;>NJ!J~ct 20~ admin~)d b         he Department of Infrastructure and Planning. This form and
                                         should be se
all other required app’
                          afi~~terials                  to your assessment manager and any referral agencies.


                                O.r~




                                            Building and operational work assessable against a planning scheme   -   IDAS form 6
                                                                                              Version 1.0 18 December 2009

Used in these records

About this file

File size
5.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application IDAS Forms 1 & 6 - OPW12_0451.pdf · 5.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.