Attachment 8 - Environmental Noise Assessment · MCU23/0078

of 66

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Environmental Noise Assessment
Noosa Civic Village Mixed Use Development
At Eenie Creek Road, Noosaville

On Behalf of Stockwell Development Group Pty Ltd

22BRA0078 R01_4
Full text of the other 65 pages

Page 2

         About TTM
         For 40 years, we’ve been at the centre of the
         Australian development and infrastructure industry.
         Our unique combination of acoustics, data, traffic
         and waste services is fundamental to the success of
         any architectural or development project.
         We have over 50 staff, with an unrivalled depth of
         experience. Our industry knowledge, technical
         expertise and commercial insight allow us to deliver
         an exceptional and reliable service.
         T: (07) 3327 9500
         F: (07) 3327 9501
         E: [email protected]




       Revision Record

          No.      Author                  Reviewed/Approved       Description                Date

         A         A Ashworth              S Yorke                 Internal draft         21/04/2023

         0         A Ashworth                                      Client draft           26/04/2023

         1         I Llamas                A Ashworth              Client issue           03/05/2023

         2         A Ashworth                                      DA Issue               24/05/2023

         3         S Yorke, I Llamas                               Council RFI response   05/10/2023

         4         A Ashworth                                      Updated Plans          22/11/2023




© 2023 - TTM Consulting Pty Ltd ABN 65 010 868 621
Level 8/369 Ann Street, Brisbane. PO Box 12015 Brisbane QLD 4003

Page 3

       Executive Summary
       TTM was engaged by Stockwell Development Group Pty Ltd to undertake an environmental
       noise assessment of the Noosa Civic Village Mixed Use Development located at Eenie Creek
       Road, Noosaville. The assessment was based on the Noosa Council Planning Scheme (Noosa
       Plan 2020) and is in response to Noosa Council RFI, reference MCU23/0078, 17th July 2023.

       Unattended noise monitoring was conducted to determine the current ambient noise levels at
       the site location and nearest sensitive receivers.

       Impacts from relevant onsite noise activities including the existing Noosa Civic Plaza were
       assessed. Compliance with the relevant planning scheme codes is predicted to be achieved
       with the inclusion of façade treatments and noise management measures as outlined in Section
       8 of this report.

       A road traffic noise assessment of Walter Hay Drive was conducted onto the development.
       Residential components of the development require up to QDC category 2 noise treatments as
       outlined in Section 8.

       Additional traffic from the development onto Walter Hay Drive is found to increase the noise
       levels by approximately 0.8dB at 2037 (development completion + 10 years). This is deemed a
       relatively minor increase in noise level (a single QDC category is 5dB).

       Mechanical plant screening is recommended in accordance with Acceptable Outcome AO79
       (Major Centre Zone Code). Additionally, it is recommended that a mechanical plant noise
       assessment be completed once plant selections are finalised during detailed design stage.

       Compliance with the Noosa Council Planning Scheme is predicted to be achieved based on the
       implementation of the recommendations outlined in Section 8 of this report.




© 2023 - TTM Consulting Pty Ltd ABN 65 010 868 621
Level 8/369 Ann Street, Brisbane. PO Box 12015 Brisbane QLD 4003

Page 4

Contents
Executive Summary .......................................................................................................................................2
1     Introduction ..........................................................................................................................................6
      1.1          Background .................................................................................................................................. 6
      1.2          References.................................................................................................................................... 6
      1.3          Scope ............................................................................................................................................ 6
2     Site Description .....................................................................................................................................7
      2.1          Site Location ................................................................................................................................. 7
      2.2          Current Site Conditions ................................................................................................................ 7
3     The Proposed Development ...................................................................................................................8
      3.1          Development Description............................................................................................................. 8
4     Measurements ......................................................................................................................................9
      4.1          Equipment .................................................................................................................................... 9
      4.2          Unattended Noise Monitoring ..................................................................................................... 9
      4.3          Noise Source Measurements .....................................................................................................10
      4.4          Results of Measurements ...........................................................................................................10
                   4.4.1 Ambient Noise Levels .....................................................................................................10
5     Noise Criteria....................................................................................................................................... 12
      5.1          Noosa Plan 2020.........................................................................................................................12
      5.2          Environmental Protection (Noise) Policy ....................................................................................16
                   5.2.1 Acoustic Quality Objectives ............................................................................................16
                   5.2.2 Background Creep ..........................................................................................................16
                   5.2.3 Sleep Disturbance...........................................................................................................17
      5.3          Road Traffic Noise ......................................................................................................................18
                   5.3.1 Queensland Development Code MP4.4 – Road Traffic Noise ........................................18
6     Analysis – Onsite Noise ........................................................................................................................ 20
      6.1          Noise Source Levels – Proposed Development - Noosa Civic Village .........................................22
      6.2          Noise Source Levels – Existing Development - Noosa Civic Plaza ...............................................22
      6.3          Noise Modelling and Assumptions .............................................................................................23
      6.4          Predicted Onsite Noise Levels at Offsite Receivers ....................................................................26
                   6.4.1 Acoustic Quality Objectives Leq (EPP)..............................................................................26


Site: Eenie Creek Road, Noosaville                                                                                                                               3
Reference: 22BRA0078 R01_4

Page 5

                   6.4.2 Background Creep (EPP) .................................................................................................27
                   6.4.3 Sleep Disturbance...........................................................................................................28
7     Analysis - Road Traffic Noise ................................................................................................................ 30
      7.1          Traffic Volumes ..........................................................................................................................30
      7.2          Noise Model ...............................................................................................................................30
                   7.2.1 Noise Modelling Parameters ..........................................................................................30
                   7.2.2 Noise Model Verification ................................................................................................31
      7.3          Predicted Road Traffic Noise Levels ...........................................................................................31
8     Recommendations............................................................................................................................... 35
      8.1          Onsite Residential Building Attenuation .....................................................................................35
      8.2          Management Strategies .............................................................................................................36
      8.3          Mechanical Plant Noise ..............................................................................................................37
9     Conclusion ........................................................................................................................................... 38
Appendix A         Development Plans................................................................................................................ 39
Appendix B         Unattended Noise Monitoring Graphs ................................................................................... 43
Appendix C         SoundPLAN Results - Onsite Noise Assessment ...................................................................... 52
Appendix D         SoundPLAN Results – Road Traffic Noise Assessment ............................................................. 58



Table Index
Table 1: Measured Ambient Noise Levels – Location 1.................................................................................... 11
Table 2: Measured Ambient Noise Levels – Location 2.................................................................................... 11
Table 3: Noosa Plan 2020 with Relevant Noise Requirements ........................................................................ 12
Table 4: Major Centre Zone Code – Relevant to Noise for this development .................................................. 12
Table 5: Dual Occupancy and Multiple Dwelling Code – Relevant to Noise for this development .................. 13
Table 6: Business Activities Code – Relevant to Noise for this development ................................................... 14
Table 7: Entertainment Activities Code – Relevant to Noise for this development ......................................... 14
Table 8: Acoustic Quality Objectives at Noise Sensitive Receivers (EPP2008) ................................................. 16
Table 9: Background Creep Noise Limits at Noise Sensitive Properties (EPP2008) – Location 1 ..................... 17
Table 10: Background Creep Noise Limits at Noise Sensitive Properties (EPP2008) – Location 2 ................... 17
Table 11: Sleep Disturbance Goals ................................................................................................................... 18
Table 12: Road Traffic Noise Category Levels – QDC MP4.4 (Schedule 3) ....................................................... 19
Table 13: Typical Noise Sources Associated with the Development ................................................................ 22
Table 14: Typical Noise Sources – Existing Shopping Centre ........................................................................... 23
Table 15: Acoustic Quality Objective Predictions – Offsite Receivers .............................................................. 26



Site: Eenie Creek Road, Noosaville                                                                                                                        4
Reference: 22BRA0078 R01_4

Page 6

Table 16: Acoustic Quality Objective Predictions – Onsite Receivers .............................................................. 26
Table 17: Background Creep Predictions – Offsite Receivers........................................................................... 28
Table 18: Predicted Lmax Sleep Disturbance Noise Levels – Offsite Receivers .................................................. 28
Table 19: Predicted Lmax Sleep Disturbance Noise Levels – Onsite Receivers................................................... 28
Table 20: Traffic Volumes used in the Assessment .......................................................................................... 30
Table 21: Noise Modelling Parameters ............................................................................................................ 30
Table 22: Comparison of Measured and Predicted Road Traffic Noise Levels ................................................. 31
Table 23: QDC Noise Category Treatments - Road Traffic ............................................................................... 31
Table 24: Noise Category Treatments - Road Traffic and Onsite Noise Combined .......................................... 35
Table 25: Recommended Residential Building Attenuation ............................................................................. 36


Figure Index
Figure 1: Site Locality ......................................................................................................................................... 7
Figure 2: Site Plan – Ground Level ..................................................................................................................... 8
Figure 3: Noise Monitoring Locations .............................................................................................................. 10
Figure 4: Offsite Noise Sensitive Receivers ...................................................................................................... 20
Figure 5: Onsite Noise Sensitive Receivers....................................................................................................... 21
Figure 6: Noise Source Locations – Proposed Development............................................................................ 24
Figure 7: Noise Source Locations – Proposed Development............................................................................ 25
Figure 8: Corresponding Residential Buildings ................................................................................................. 32
Figure 9: Predicted Road Traffic Noise Levels at 1.8m AGL (Indicative only) ................................................... 33
Figure 10: Predicted Road Traffic Noise Levels at 4.8m AGL (Indicative only) ................................................. 33
Figure 11: Predicted Road Traffic Noise Levels at 7.8m AGL (Indicative only) ................................................. 34
Figure 12: Corresponding Residential Buildings ............................................................................................... 36




Site: Eenie Creek Road, Noosaville                                                                                                                           5
Reference: 22BRA0078 R01_4

Page 7

1 Introduction
1.1            Background
TTM was engaged by Stockwell Development Group Pty Ltd to undertake an environmental noise
assessment of the Noosa Civic Village Mixed Use Development located at Eenie Creek Road, Noosaville. This
report will form part of a development application for consideration by Noosa Council.

1.2            References
This report is based on the following:

         •     Noosa 2020 Planning Scheme

         •     Noosa Council RFI, reference MCU23/0078, 17th July 2023

         •     Queensland Development Code (QDC) MP4.4 – Buildings in a Transport Noise Corridor (August
               2015)

         •     Development plans shown in Appendix A

         •     Site inspection, noise measurements, analysis and calculations conducted by TTM

1.3            Scope
The assessment includes the following:

         •     Description of the development site and proposal.

         •     Measurement of existing ambient noise levels.

         •     Statement of assessment criteria relating to noise emissions.

         •     Assessment of noise generated by the development onto nearby sensitive receivers.

         •     Analysis of measured and predicted noise levels.

         •     Details of noise control recommendations to be incorporated to achieve predicted compliance.




Site: Eenie Creek Road, Noosaville                                                                        6
Reference: 22BRA0078 R01_4

Page 8

2 Site Description
2.1            Site Location
The site is described by the following:

•    Noosa Civic Shopping Centre, Eenie Creek Road, Noosaville

The site locality is shown in Figure 1.

Figure 1: Site Locality




2.2            Current Site Conditions
The current acoustic environment at the site and surrounding area is primarily comprised of noise activities
associated with the Noosa Civic Shopping Centre and local road traffic noise.




Site: Eenie Creek Road, Noosaville                                                                        7
Reference: 22BRA0078 R01_4

Page 9

3 The Proposed Development
3.1            Development Description
The proposal is for the Noosa Civic Village Mixed Use Development. The development is proposed to consist
of commercial, retail, food and drink (including outdoor dining), entertainment and residential uses. The
proposed operating hours for each use are predominantly in accordance with the planning scheme code
acceptable outcomes (excluding the theatre) and are as follows:

         •     Commercial and retail: 7am – 9pm (7 days)
         •     Indoor entertainment: 7am – 9pm (7 days)
         •     Food and drink (incl. outdoor dining): 7am – 10pm (7 days)
         •     Theatre (cinema): 9am – 12am (7 days)
         •     Village green 7am – 9pm (7 days) (infrequent events):
               Live music: 7am - 9pm
               Amplified live music: 7am - 7pm
         •     Deliveries: (same as existing shopping centre)
               5am – 9pm (Monday – Saturday)
               8am – 6pm (Sunday)

A site plan of the redevelopment is presented in Figure 2. Further samples of the development plans are
shown in Appendix A.

Figure 2: Site Plan – Ground Level




Site: Eenie Creek Road, Noosaville                                                                        8
Reference: 22BRA0078 R01_4

Page 10

4            Measurements
4.1            Equipment
The following equipment was used to measure existing noise levels:

         •     ARL EL 316 Environmental noise logger (SN# 16-707-016)

         •     Norsonic 140 Environmental noise logger (SN# 1406507)

         •     Norsonic 131 Sound Level Meter (SN# 1313158)

         •     RION NC-73 Sound Calibrator (SN# TTMNC73-01)

All equipment was calibrated by a National Association of Testing Authorities (NATA) accredited laboratory.
The equipment was field calibrated before and after the measurement session. No significant drift from the
reference signal was recorded.

4.2            Unattended Noise Monitoring
Unattended noise monitoring was conducted between Thursday 23rd and Thursday 30th March 2023 to
establish the existing ambient noise levels at the site location and nearest residential receivers. The noise
monitoring locations are shown in Figure 3. The ambient monitors were in a position considered
representative of the ambient noise levels experienced at the site and surrounding locations with
consideration to both access and equipment security requirements.

The microphones were in free-field locations and 1.5m above ground level. The noise monitors were set to
measure statistical noise levels in 'A'-weighting, 'Fast' response, over 15 minute intervals. Ambient noise
levels were measured in accordance with Australian Standard AS1055:2018 Acoustics – Description and
Measurement of Environmental Noise (AS1055). Weather during the monitoring period was generally fine
with approx. 2mm of rain on the 29th of March and no / negligible rainfall on all other days. Rainfall affected
data was excluded from the analysis (source: Bureau of Meteorology).




Site: Eenie Creek Road, Noosaville                                                                              9
Reference: 22BRA0078 R01_4

Page 11

Figure 3: Noise Monitoring Locations




                                                                       Noise Monitor
                                                                        Location 1




                                                                                  Noise Monitor
                                                                                   Location 2




4.3            Noise Source Measurements
Noise levels associated with typical on-site activities were taken from similar investigations conducted by
TTM. All measurements were conducted generally in accordance with AS1055.

4.4            Results of Measurements
4.4.1          Ambient Noise Levels
Table 1 presents the measured ambient noise levels. The Rating Background Level (RBL) is an average
minimum background noise level (10th percentile average) in accordance with planning scheme
requirements. Graphical presentation of the measured levels is shown in Appendix B. The measurement
results were used to determine the assessment criteria for the development.


Site: Eenie Creek Road, Noosaville                                                                            10
Reference: 22BRA0078 R01_4

Page 12

Table 1: Measured Ambient Noise Levels – Location 1

 Time Period                                 Measured Noise Levels, dB(A)
                                            RBL L90                 L eq
 Day (7am – 6pm)                              61                    74
 Evening (6pm – 10pm)                         40                    69
 Night (10pm – 7am)                           29                    66
 Operating hours (night)
 Night (10pm – 12am)                          34                    64



Table 2: Measured Ambient Noise Levels – Location 2

 Time Period                                 Measured Noise Levels, dB(A)
                                            RBL L90                 L eq
 Day (7am – 6pm)                              49                    66
 Evening (6pm – 10pm)                         37                    60
 Night (10pm – 7am)                           29                    59
 Operating hours (night)
 Night (10pm – 12am)                          33                    55




Site: Eenie Creek Road, Noosaville                                          11
Reference: 22BRA0078 R01_4

Page 13

5               Noise Criteria
The Noosa Shire Council (NSC) planning scheme, Noosa Plan 2020, details site specific planning scheme
zones, overlays and codes relevant to a site in the NSC local government area. Table 3 summarises the
planning scheme requirements for the site which are relevant to the noise assessment.

Table 3: Noosa Plan 2020 with Relevant Noise Requirements

      Location                       Zone Code                  Development Code                       Policies
                                                           Dual Occupancy and Multiple
                                                                   Dwelling Code                 Preparing a well-made
         Site              Major Centre Zone Code
                                                              Business Activities Code          application - Appendix 1
                                                           Entertainment Activities Code
       Nearest              Residential Zone Code
                                                                       N/A                                N/A
      Receivers            Major Centre Zone Code
Note: Safety and Amenity (Table 9.3.5.3 part) does not reference noise


5.1          Noosa Plan 2020
The Major Centre Zone Code specifies relevant noise requirements as presented in Table 4.

Table 4: Major Centre Zone Code – Relevant to Noise for this development

                         Performance Outcome                                               Acceptable Outcome
   PO39                                                                AO39.1
   Mixed-use buildings are designed and operated to ensure:            Dwellings are designed to incorporate suitable noise
                                                                       attenuation and privacy measures to reduce amenity impacts
   (a) business uses manage potential impact on residents,             from business uses.
   including impacts associated with:
         1. visual and acoustic privacy;
         2. safety and security; and
         3. lighting.
   (b) residential uses do not limit the business opportunities of
   the site.
   Safety and Amenity                                                  AO78.2
   PO78                                                                Where adjoining non residential uses, dwellings are designed
   Development:                                                        to incorporate suitable noise attenuation measures to reduce
        a) provides a high level of residential amenity to users of    amenity impacts to occupants of residential uses.
             the subject site; and
        b) does not unreasonably impact on the amenity
             enjoyed by users of adjoining or nearby premises,
             including privacy and access to sunlight.

   Editor's note—Provisions for sill height, glazing, screening and
   window openings are to improve the residential amenity for
   occupants. Thermal performance requirements are contained in
   Queensland Development Code MP4.1 Sustainable Buildings.
   Energy efficiency requirements are contained in the National
   Construction Code.




Site: Eenie Creek Road, Noosaville                                                                                              12
Reference: 22BRA0078 R01_4

Page 14

   PO79                                                           AO79.3
   Development, including mechanical plant, vehicle manoeuvring   Mechanical plant is:
   and communal outdoor recreation uses:                              a) located at least 2 metres from side or rear property
        a) do not have an adverse effect on the amenity enjoyed           boundary;
           by users of adjacent or nearby premises through            b) where located at ground level, screened by fencing
           emission of noise, light, fumes or smoke;                      1.5 metres in height or dense vegetation of at least
        b) do not cause unreasonable disturbance to local fauna           1.5 metres in width incorporating grouped trees
           through light or smoke emissions.                              and shrubs with maximum separation distance of 1
                                                                          metre measured from the centre of the plant;
                                                                      c) where located above ground level, enclosed or
                                                                          screened such that it is not visible from the
                                                                          street frontage nor adjoining properties; and
                                                                      d) visually integrated into the line and plane of
                                                                          the building and roof design and does not project
                                                                          beyond the height or width of the building when
                                                                          viewed from the street and adjoining properties.

                                                                  Editor’s Note— Mechanical plant includes generators,
                                                                  motors, compressors and pumps such as air-conditioning or
                                                                  pool equipment.


To comply with AO39.1 and AO78.2, onsite activities have been assessed against the Environmental
Protection (Noise) Policy 2008 (EPP 2008).

To comply with AO79 it is recommended all mechanical plant is acoustically screened from nearby sensitive
receivers.

The Dual Occupancy and Multiple Dwelling Code specifies relevant noise requirements as presented in Table
5.

Table 5: Dual Occupancy and Multiple Dwelling Code – Relevant to Noise for this development

                       Performance Outcome                                          Acceptable Outcome
   PO5                                                         AO5
   Development is designed to minimise noise carrying          Bedroom windows are at least 3 metres away from shared
   between dwelling units or accommodation units by locating   driveways, car parking areas, mechanical plant, refuse and
   noise sensitive spaces such as bedrooms away from noise     recycling areas, vents and exhausts.
   generating areas of the development, such as car parking
   areas or mechanical plant and equipment or recreational
   facilities.
   PO6                                                         AO6.4
   Where dwellings form part of a mixed use development, the   Dwellings are designed to incorporate suitable noise attenuation
   development provides residents with reasonable privacy      and privacy measures to reduce amenity impacts from business
   and security.                                               uses.




It is recommended that the design of the development complies with Acceptable Outcome AO5 for
minimum residential facade setbacks (3m) from shared driveways, car parking areas, mechanical plant,
refuse and recycling areas, vents and exhausts.




Site: Eenie Creek Road, Noosaville                                                                                           13
Reference: 22BRA0078 R01_4

Page 15

To comply with AO6.4, onsite activities have been assessed against the Environmental Protection (Noise)
Policy 2008 (EPP 2008).

The Business code specifies relevant noise requirements as presented in Table 6.

Table 6: Business Activities Code – Relevant to Noise for this development

           Performance Outcome                                                   Acceptable Outcome
   PO11                                         AO11.1
   Business activities are operated in a        The use or activity does not operate outside the hours of 7:00am to 9:00pm, seven
   manner that avoids or minimises              days a week, where the site directly adjoins land in the following zones:
   evening, early morning or weekend
   noise nuisances to sensitive land uses,           a)   All residential zones, except for the Tourist accommodation zone
   particularly surrounding residential              b)   Major centre zone – High density residential precinct; or
   uses.                                             c)   Rural residential zone.

                                                AO11.2
                                                Where the site is not specified above in AO11.1 the use does not operate outside the
                                                hours of 6:00am to 10:00pm, seven days a week, except that a business use such as
                                                a food and drink outlet, may operate until 12:00 midnight on a Friday and Saturday.


   Noise, visual and odour impacts
   PO13                                         AO13.1
   Business activities are designed, sited      Undesirable noise, visual or odour impacts on public spaces and residential uses, are
   and operated to avoid environmental          avoided or reduced by:
   nuisances such as noise, visual or
   odour impacts that unreasonably
   diminish the amenity of the area or               a)   providing vehicle loading/unloading and refuse storage/collection facilities
   surrounding uses.                                      within enclosed service yards or courtyards; and
                                                     b)   not locating site service facilities and areas along any frontage to a street or
                                                          other public space.
                                                AO13.2
                                                Where the business activity requires the use of acoustic attenuation measures to
                                                mitigate adverse impacts on nearby sensitive land uses, such measures are designed
                                                and constructed to be compatible with the local streetscape.


To comply with PO11 and PO13, onsite activities have been assessed against the Environmental Protection
(Noise) Policy 2008 (EPP 2008).

The Entertainment Activities Code specifies relevant noise requirements as presented in Table 7.

Table 7: Entertainment Activities Code – Relevant to Noise for this development

        Performance Outcome                                                    Acceptable Outcome
   Operation Management Plan                 AO11
   PO11                                      An Operation Management plan is provided outlining how the entertainment activity will
   Entertainment activities are              minimise potential adverse impacts including:
   located, designed and operated to             a) noise mitigation and noise management protocols;
   avoid significant adverse impacts             b) safety and security measures;
   associated with noise, privacy,
                                                 c) crowd control;
   security, waste, and lighting, on
   the amenity of the area.                      d) lighting;
                                                 e) waste management and collection; and complaint procedures.




Site: Eenie Creek Road, Noosaville                                                                                                      14
Reference: 22BRA0078 R01_4

Page 16

   Noise
   PO13                                AO13
   Entertainment activities avoid      Noise attenuation measures are designed to be consistent with the local streetscape and
   noise emissions that unreasonably   do not include external roller shutters.
   impact on the amenity of the area
   and residential landuses.

   Editor’s Note— An acoustic report
   may be required to meet PO13.
   Live Music
   PO14                                AO14.1
   Live music creates entertainment    Where the site is adjacent to land in a residential zone (excluding Tourist Accommodation
   for patrons and vibrancy within     Zone), the Noosa Business Centre High Density Residential Precinct or includes a nightclub
   the streetscape and is sited to     entertainment facility, live music is contained within an enclosed acoustically treated
   avoid significant impacts on        environment.
   surrounding residential landuses.
                                       AO14.2
                                       Acoustic live music (not reliant on electric or electronic equipment) ceases to operate in
                                       outdoor spaces by 9:00pm Sunday – Thursday, and by 10:00pm Friday and Saturday, with
                                       the exception of within the Hastings Street Mixed Use Precinct or Noosa Junction
                                       Hospitality precinct where it can operate until 10:00pm Sunday - Thursday, and by 12:00
                                       midnight Friday and Saturday.

                                       AO14.3
                                       Amplified live music ceases to operate in outdoor space by 7:00pm seven days per week,
                                       except if located within Hastings Street Mixed use precinct or Noosa Junction Hospitality
                                       precinct where it can operate until 9:00pm Sunday - Thursday and 10:00pm Friday and
                                       Saturday.

                                       Editor’s Note— Liquor licences and noise matters are separately dealt with through
                                       the Office of Liquor and Gambling.


The indoor entertainment retail tenancy (eg. Timezone etc) is enclosed by the building façade and complies
with code acceptable operating hours. Internal noise is expected to be contained within the building
envelope and not adversely impact any sensitive receiver during the proposed operating hours.

The village green may be infrequently used for live music purposes. The proposed operating hours comply
with the acceptable outcomes AO14.2 and 14.3. Therefore, no further assessment is required. Additionally,
façade treatment is recommended for habitable rooms adjacent to the plaza area (outdoor dining) which will
also attenuate noise sources from the village green.




Site: Eenie Creek Road, Noosaville                                                                                             15
Reference: 22BRA0078 R01_4

Page 17

5.2          Environmental Protection (Noise) Policy
Schedule 6 Planning scheme policies part SC6.2 - PSP1 Preparing a well-made application, SC6.2.4 Appendix
1, states that noise emissions from onsite activities are assessed against the Environmental Protection (Noise)
Policy 2008 (EPP 2008). Details of the criteria and established noise limits are presented in the following
sections.

5.2.1        Acoustic Quality Objectives
Table 8 presents the acoustic quality objectives at noise sensitive receivers as detailed in Schedule 1 of the
EPP2008.

Table 8: Acoustic Quality Objectives at Noise Sensitive Receivers (EPP2008)

                                                   Acoustic Quality Objectives, dB(A)
   Sensitive Receiver        Time of Day
                                               L Aeq,adj,1hr   L A10,adj,1hr   L A1,adj,1hr
   Dwelling                  Day and Evening
                                                   50              55              65
   (Outdoors)                (7am – 10pm)
                             Day and Evening
                                                   35              40              45
   Dwelling                  (7am – 10pm)
   (Indoors)                 Night
                                                   30              35              40
                             (10pm – 7am)



5.2.2        Background Creep
This criterion is to prevent background noise progressively increasing or creeping higher over time with the
establishment of new developments in a locality. EPP2008 states that:

      1. This section states the management intent for an activity involving noise.

      2. To the extent that it is reasonable to do so, noise from an activity must not be—

     -    for noise that is continuous noise measured by LA90,T—more than nil dB(A) greater than the existing
          acoustic environment measured by LA90,T; or

     -    for noise that varies over time measured by LAeq,adj,T—more than 5dB(A) greater than the existing
          acoustic environment measured by LA90,T.

In accordance with the Environmental Protection Regulation 2008, the time period (T) is considered to be a
time interval of at least 15 minutes.




Site: Eenie Creek Road, Noosaville                                                                            16
Reference: 22BRA0078 R01_4

Page 18

The Background Creep criteria for Location 1 for steady-state and transient noise sources are stated in Table
9.

Table 9: Background Creep Noise Limits at Noise Sensitive Properties (EPP2008) – Location 1

   Time Period                       Steady-State Noise Emission Criteria,   Time Varying Noise Emission
                                                    dB(A)                          Criteria, dB(A)
                                                     L A90,T                            L Aeq,T
   Day (7am – 6pm)                                    61                                 66
   Evening (6pm – 10pm)                               40                                 45
   Night (10pm – 7am)                                 29                                 34
   Operating hours (night)
   Night (10pm – 12am)                                34                                 39



The Background Creep criteria for Location 2 for steady-state and transient noise sources are stated in Table
10.

Table 10: Background Creep Noise Limits at Noise Sensitive Properties (EPP2008) – Location 2

   Time Period                       Steady-State Noise Emission Criteria,   Time Varying Noise Emission
                                                    dB(A)                          Criteria, dB(A)
                                                     L A90,T                            L Aeq,T
   Day (7am – 6pm)                                    49                                 54
   Evening (6pm – 10pm)                               37                                 42
   Night (10pm – 7am)                                 29                                 34
   Operating hours (night)
   Night (10pm – 12am)                                33                                 38



5.2.3 Sleep Disturbance
The Planning for Noise Control Guideline (Department of Environment and Science, Qld Government 2004)
specifies maximum noise levels for sleep disturbance based on research by the World Health Organization
(WHO).
The guideline recommends that maximum instantaneous internal noise levels in sleeping areas should not
exceed approximately 45 dB(A) more than 10 to 15 times per night. The corresponding external maximum
noise levels (LAmax), which should protect at least 90% of the population (i.e. a probability of only 10%
awakenings) are presented in Table 11. These levels differ according to window types and whether windows
are open or closed.




Site: Eenie Creek Road, Noosaville                                                                         17
Reference: 22BRA0078 R01_4

Page 19

Table 11: Sleep Disturbance Goals

   Window Type and Setting                          External L Amax Noise Level, dB(A)*
   Wide open                                                        47
   Partially open                                                   52
   Single glazed, closed                                            62
   Thermal double glazed, closed                                    67
*Assumes typical noise reduction of 5 dB(A) across a wide open window, 7 dB(A) across partially closed, 20 dB(A)
single glazed, closed and 25 dB(A) thermal double glazed and closed.

Based on the above, an external night-time noise level assessment criterion for instantaneous noise sources
of LAmax 52 dB(A), for partially closed windows, is proposed for the project in order to assist with the assessment
and management of night time noise impacts. A limit of LAmax 52 dB(A) is also in line with the criteria of the
NSW Noise Policy for Industry.

5.3            Road Traffic Noise
Noosa Council requested that road traffic noise be assessed for Walter Hay Drive. Applicable noise criteria
can be found within theQueensland Development Code Part MP 4.4 - 'Buildings in a Transport Noise Corridor'
August 2015 (QDC).

5.3.1          Queensland Development Code MP4.4 – Road Traffic Noise
The Queensland Development Code Part MP 4.4 - 'Buildings in a Transport Noise Corridor' August 2015 (QDC)
specifies Noise Categories to ensure that habitable rooms of residential buildings are adequately protected
from transport noise over a 10-year planning horizon.

The Noise Categories list the minimum acoustic RW ratings for each building component to comply with the
indoor sound levels as outlined in Australian Standard AS21071. Details regarding the noise categories and
acceptable forms of construction can be found within Schedule 1 and 2 of the QDC document (see 0). The
triggers for each noise category are summarised in Table 12.




1 AS NZS 2107:2016. Acoustics - Recommended design sound levels and reverberation times for building interiors




Site: Eenie Creek Road, Noosaville                                                                                 18
Reference: 22BRA0078 R01_4

Page 20

Table 12: Road Traffic Noise Category Levels – QDC MP4.4 (Schedule 3)

                                     Level of Transport Noise* L A10,18Hour for State-Controlled
            Noise Category
                                         Roads and Designated Local Government Roads
               Category 4                                    ≥ 73 dB(A)
               Category 3                                  68 – 72 dB(A)
               Category 2                                  63 – 67 dB(A)
               Category 1                                  58 – 62 dB(A)
               Category 0                                    ≤ 57 dB(A)
*Measured at 1 metre from the façade of the proposed or existing building.




Site: Eenie Creek Road, Noosaville                                                                 19
Reference: 22BRA0078 R01_4

Page 21

6 Analysis – Onsite Noise
An assessment of relevant on-site activities associated with the proposed development was conducted to
determine potential impacts at the nearest noise sensitive receivers.

The nearest noise sensitive receivers are outlined below and shown in Figure 4 and Figure 5.

         •     Receivers A-D: Proposed onsite residential dwellings
         •     Receiver 1: Existing residential dwellings to the north of the site
         •     Receiver 2: Existing residential dwellings to the southwest of the site
         •     Receiver 3: Proposed offsite residential dwellings to the west of the site

If compliance can be achieved at these receivers, then all remaining noise sensitive locations are expected to
comply.

Figure 4: Offsite Noise Sensitive Receivers


                                                  Receiver 1




                                     Receiver 3



        Receiver 2




Site: Eenie Creek Road, Noosaville                                                                        20
Reference: 22BRA0078 R01_4

Page 22

Figure 5: Onsite Noise Sensitive Receivers




                                             Receiver A
                                                                       Receiver B




                                                          Receiver D    Receiver C




Site: Eenie Creek Road, Noosaville                                                   21
Reference: 22BRA0078 R01_4

Page 23

6.1          Noise Source Levels – Proposed Development - Noosa Civic
             Village
Table 13 presents the typical noise sources associated with the development with the potential to impact
the nearest noise sensitive receivers. The noise source levels were calculated to one metre and include
corrections for tonality and impulsiveness as per AS1055. The number of events was estimated for a ‘peak’
one-hour time period providing a ‘worst case scenario’ applied to all relevant operating hour time periods.

Table 13: Typical Noise Sources Associated with the Development


                                     Measured       Sound Power Level        ‘Peak’ events
                                                                                             Operating
   Noise Source                      Duration                                 per hour or
                                                 SWL, L eq,    SWL, Lmax ,                    Hours
                                      (sec)                                   % of period
                                                  dB(A)          dB(A)
   Car door close                       2           83*           91*            565
   Car pass-by                          6           77            N/A^           565         7am – 12am
   Car engine start                     3           80             82            565
   Truck pass-by / manoeuvring
                                        20          88#           91#             9
   (incl. reverse alarm)
   Delivery activities                  60          93#           94#             9
                                                                                             5am – 9pm
   Roller door operation                5           77*           87*             9
   Waste collection                     40         101*           113*            4
   Waste compaction                     90          94#           103#            1
                                     Long term      73            N/A^
   Conversation                                                                 100%         7am – 12am
                                        avg
                                     Long term
   Outdoor dining                                   83            N/A^          100%         7am – 10pm
                                        avg
*Includes 2dB(A) adjustment to account for impulsiveness characteristics in accordance with AS1055
# Includes 5dB(A) adjustment to account for tonal noise characteristics in accordance with AS1055
^People and vehicle pass-by noise, and other ‘non-impact’ type sources, are excluded from Lmax assessment in
accordance with the noise policy

6.2          Noise Source Levels – Existing Development - Noosa Civic Plaza
Table 13 presents the typical noise sources associated with the existing Noosa civic centre with the potential
to impact the nearest noise sensitive receivers. The noise source levels were calculated to one metre and
include corrections for tonality and impulsiveness as per AS1055. The number of events was estimated for a
‘peak’ one-hour time period providing a ‘worst case scenario’ applied to all time periods.




Site: Eenie Creek Road, Noosaville                                                                             22
Reference: 22BRA0078 R01_4

Page 24

Table 14: Typical Noise Sources – Existing Shopping Centre

                                                Sound Power
                                     Measured      Level      ‘Peak’ events   Operating
    Noise Source                     Duration                  per hour or      Hours
                                      (sec)      SWL, L eq,    % of period    (between)
                                                  dB(A)
    Car door close                      2           83*           1566
    Car pass-by                         6           77            1566
                                                                              7am - 10pm
    Car engine start                    3           80            1566
    Mechanical plant                    60          84           100%
    Truck pass-by / manoeuvring
                                        20          88#            9
    (incl. reverse alarm)
    Delivery activities                 60          93#            9
                                                                              5am – 9pm
    Roller door operation               5           77*            9
    Waste collection                    40         101*            4
    Waste compaction                    90          94#            1
*Includes 2dB(A) adjustment to account for impulsiveness characteristics in accordance with AS1055
#
  Includes 5dB(A) adjustment to account for tonal noise characteristics in accordance with AS1055



6.3          Noise Modelling and Assumptions
A noise assessment of the proposed development was conducted as a 3D noise emission model using
SoundPLAN V9.0 with the following parameters and assumptions:
•    Elevation data of the surrounding area is taken from the Intergovernmental Committee on Surveying and
     Mapping Elevation and Depth (ELVIS) database.

•    Noise sources such as car door closure noise that are located internally do not require assessment as the
     building structure will provide significant shielding.

•    Building layouts as per site plans (Appendix A).

•    The Noosa Civic Village and existing Noosa Civic centre were both assessed together.

•    The onsite traffic generation rate (supplied by SLR Traffic) in the peak (1 hour) period was applied.

•    Waste collection was assumed as a maximum of 2 collections per hour per loading area (4 per hour).

•    Truck deliveries and waste collection were predicted from the nearest loading bay and include all
     activities associated with loading and unloading.

•    Conversation noise was assumed from the nearest loading bay, car parking or driveway area to the
     receiver.

•    Conversation noise was based on a ‘male’ voice with ‘raised’ vocal effort as reported in published data
     contained in Harris, C.M., Handbook of Acoustical Measurements and Noise Control – 3rd ed. Ch 16.3,
     Mc Graw-Hill Inc, 1991. Noise duration was assumed to be continuous over the time period.


Site: Eenie Creek Road, Noosaville                                                                           23
Reference: 22BRA0078 R01_4

Page 25

•    Outdoor dining was predicted from the outdoor dining area. The noise duration was assumed to be
     continuous during the assessment time period. The sound level includes allowance for low-level
     background amplified music.

•    Offsite receivers: Noise attenuation of 7dB through an open window at a receiver was applied for
     internal predictions. It is noted that between 15 and 20dB could be expected to be achieved through a
     closed window or door with standard construction.

•    Onsite receivers: Internal predictions include façade attenuation as habitable room facades are able to
     be designed and constructed to a specified acoustic rating for onsite receivers. Façade construction for
     habitable rooms to achieve a minimum noise attenuation of 25dB. Façade construction for habitable
     rooms adjacent to the plaza area (outdoor dining) to achieve a minimum noise attenuation of 30dB.

•    Noise source locations are shown in Figure 6.

     -    1: Deliveries, Waste collection, Roller Door, Compactor
     -    2: Car door closure, Car engine start, Conversation
     -    A: Truck pass by / manoeuvring
     -    B: Car
Figure 6: Noise Source Locations – Proposed Development




Site: Eenie Creek Road, Noosaville                                                                         24
Reference: 22BRA0078 R01_4

Page 26

Figure 7: Noise Source Locations – Proposed Development




Site: Eenie Creek Road, Noosaville                        25
Reference: 22BRA0078 R01_4

Page 27

6.4                  Predicted Onsite Noise Levels at Offsite Receivers
The predicted noise levels from typical onsite activities are based on the noise sources presented in Table 13
and the assumptions outlined in Section 6.3. SoundPLAN results are included in Appendix C.

6.4.1 Acoustic Quality Objectives Leq (EPP)
Table 15 presents the predicted acoustic quality objective noise levels at the nearest offsite sensitive
receivers. The maximum noise impact per receiver is displayed in the table.
Table 15: Acoustic Quality Objective Predictions – Offsite Receivers

                                                           Predicted Noise Level
                                                                     L Aeq, 1hr
                  Noise Source                        Outdoors                      Indoors
   Receiver




                                                       Criteria         Criteria          Criteria
                                                    Day & Evening      Day & Eve           Night
                                                      50dB(A)           35dB(A)           30dB(A)

                  Proposed Noosa Civic Village &
  1               Existing Noosa Civic Plaza             29                22                 <10
                  Cumulative

                  Proposed Noosa Civic Village &
  2               Existing Noosa Civic Plaza             27                20                 17
                  Cumulative

                  Proposed Noosa Civic Village &
  3               Existing Noosa Civic Plaza             33                26                 20
                  Cumulative
Notes: Day & Evening 7am-10pm, Night 10pm-7am.
Noise impacts are predicted to comply with the noise criteria at offsite receivers.
Table 16 presents the predicted acoustic quality objective noise levels at the nearest onsite sensitive
receivers. Internal noise levels include the recommended minimum façade attenuation. The maximum noise
impact per receiver is displayed in the table and full results are presented in Appendix C.
Table 16: Acoustic Quality Objective Predictions – Onsite Receivers

                                                              Predicted Noise Level
                                                                       L Aeq, 1hr
                   Noise Source                         Outdoors                      Indoors
       Receiver




                                                        Criteria          Criteria            Criteria
                                                     Day & Evening       Day & Eve             Night
                                                       50dB(A)            35dB(A)             30dB(A)

                   Proposed Noosa Civic Village &
      A            Existing Noosa Civic Plaza             58                 28                 24
                   Cumulative




Site: Eenie Creek Road, Noosaville                                                                         26
Reference: 22BRA0078 R01_4

Page 28

                                                       Predicted Noise Level
                                                                L Aeq, 1hr
               Noise Source                       Outdoors                   Indoors
    Receiver




                                                   Criteria        Criteria        Criteria
                                                Day & Evening     Day & Eve         Night
                                                  50dB(A)          35dB(A)         30dB(A)

               Proposed Noosa Civic Village &
    B          Existing Noosa Civic Plaza            45               20               <10
               Cumulative

               Proposed Noosa Civic Village &
    C          Existing Noosa Civic Plaza            38               13               <10
               Cumulative

               Proposed Noosa Civic Village &
    D          Existing Noosa Civic Plaza           52*               22               14
               Cumulative

Notes: Day & Evening 7am-10pm, Night 10pm-7am. Predicted noise levels that exceed criteria are shown in ‘bold’ font.

*A 1-3dB exceedance of criteria is considered a ‘marginal compliance’ as a 1-3dB change in noise level is typically not
discernible to the human ear in an environmental setting
Noise impacts are predicted to comply with the noise criteria at onsite receivers, with the recommended
minimum façade attenuation, with the exception of:

•     External criteria due to outdoor dining at Receiver A (southwest façade) and Receiver D (northeast
      facade) (marginal compliance) . It will be recommended that balconies have solid balustrades at these
      locations to improve the outdoor amenity. It is noted that compliance with indoor noise criteria is
      achieved.

Refer to Section 8 for recommended noise mitigation measures.

6.4.2 Background Creep (EPP)
Table 17 presents the predicted background creep noise levels at the nearest sensitive receivers. Background
creep applies to offsite receivers. The maximum noise impact per receiver is displayed in the table and full
results are presented in Appendix C.




Site: Eenie Creek Road, Noosaville                                                                                    27
Reference: 22BRA0078 R01_4

Page 29

Table 17: Background Creep Predictions – Offsite Receivers

                                                 Predicted External
                                                  Noise Level, L Aeq               Complies with Criteria?
                                                       dB(A)
 Receiver      Noise Source
                                                                           Day         Evening            Night
                                                 Day/Eve     Night     (7am–6pm)     (6pm–10pm)        (10pm–7am)
                                                                         66dB(A)       45dB(A)           34dB(A)
               Proposed Noosa Civic Village &
      1        Existing Noosa Civic Plaza           29        <10            ✓             ✓                 ✓
               Cumulative
                                                                           Day         Evening            Night
                                                                       (7am–6pm)     (6pm–10pm)        (10pm–7am)
                                                                         54dB(A)       42dB(A)           34dB(A)
               Proposed Noosa Civic Village &
      2        Existing Noosa Civic Plaza           27         23            ✓             ✓                 ✓
               Cumulative

               Proposed Noosa Civic Village &
      3        Existing Noosa Civic Plaza           33         27            ✓             ✓                 ✓
               Cumulative


Noise impacts are predicted to comply with the noise criteria.

6.4.3          Sleep Disturbance
Table 18 and Table 19 present the predicted sleep disturbance noise emission level for night time ‘impact /
short duration’ noise sources at the nearest sensitive receivers, from the proposed Noosa Village
development (Lmax is not a cumulative noise descriptor, hence the existing shopping centre is not applicable).
The maximum noise impact per receiver is displayed in the table and full results are presented in Appendix C.

Table 18: Predicted Lmax Sleep Disturbance Noise Levels – Offsite Receivers

                                                                Complies with
                       Predicted External Noise Level
   Receiver                                                    External Criteria
                                 L max dB(A)                       52 dB(A)
          1                          24                                ✓
          2                          45                                ✓
          3                          48                                ✓


Noise impacts are predicted to comply with the noise criteria at offsite receivers.

Table 19: Predicted Lmax Sleep Disturbance Noise Levels – Onsite Receivers

                                                                Complies with
                       Predicted Internal Noise Level
   Receiver                                                    Internal Criteria
                                 L max dB(A)                       45 dB(A)
          A                          42                                ✓
          B                          35                                ✓



Site: Eenie Creek Road, Noosaville                                                                                  28
Reference: 22BRA0078 R01_4

Page 30

                                                         Complies with
                       Predicted Internal Noise Level
   Receiver                                             Internal Criteria
                                 L max dB(A)
                                                            45 dB(A)
        C                            30                        ✓
       D                             38                        ✓


Noise impacts are predicted to comply with the noise criteria at onsite receivers with the recommended
minimum façade attenuation.

Refer to Section 8 for recommended noise mitigation measures.




Site: Eenie Creek Road, Noosaville                                                                       29
Reference: 22BRA0078 R01_4

Page 31

7              Analysis - Road Traffic Noise
An assessment of road traffic noise onto the proposed development was conducted to determine the
acoustic treatment requirements for predicted compliance with the relevant criteria.

7.1          Traffic Volumes
Traffic volumes and growth rates were obtained from the SLR Consulting. The traffic volumes used in the
assessment are presented in Table 20. These traffic volumes were used to determine the increase in road
traffic noise over the 10 year planning horizon to be applied to the measured noise levels. Heavy vehicle rate
was obtained from Queensland Government Traffic Data 2019 traffic.
Table 20: Traffic Volumes used in the Assessment

                                                Traffic Volumes (AADT)                      Growth             % Heavy
   Road
                                        2022              2023                 2033         Rate (%)           Vehicles

   Walter Hay Drive                    18,492            18,640             25,202            0.8%              8.8%



The 18 hour traffic volumes used in the noise model are taken to be 95% of the AADT (Annual Average Daily
Traffic).

7.2          Noise Model
7.2.1        Noise Modelling Parameters
Road traffic noise predictions were conducted using ‘SoundPLAN v9.0’, a CoRTN based modelling program.
The basis of the ‘SoundPLAN’ model is presented in Table 21.

Table 21: Noise Modelling Parameters

   Description                                                    Value
   Noise modelling standard                                       CoRTN (UK)
   Grid spacing (noise maps)                                      2m
   Road surface type                                              Impervious (+1.5 dB(A))
   CoRTN correction for QLD roads                                 -0.7dB(A) (free-field)
   (Except Pacific Motorway between Logan Motorway to Nerang)     -1.7dB(A) (1m in front of building façade)
   Ground contours                                                Queensland Lidar data - 1m DEM
   Walter Hay Drive Speed limit                                   70 km/h
   Noise source height above grade                                0.5m
   Floor heights                                                  2.8m
   Receiver heights                                               1.8m above ground level
   Façade correction                                              +2.5 dB(A)




Site: Eenie Creek Road, Noosaville                                                                                        30
Reference: 22BRA0078 R01_4

Page 32

7.2.2         Noise Model Verification
To verify the road traffic noise model, the LA10, 18hour noise levels were modelled and compared to the
measured levels as presented in Table 22. As the noise monitor was in a free-field location, the predicted
noise level is also shown as free-field.

Table 22: Comparison of Measured and Predicted Road Traffic Noise Levels

      Measured L A10, 18 hour        Predicted L A10, 18 hour        Required Correction

                 74.5                          74.7                           0


The modelled level is within the allowable tolerance of 2 dB(A) of the measured level, therefore no
correction is required to the model.

7.3              Predicted Road Traffic Noise Levels
Modelling was conducted to determine road traffic noise levels at the development in the 10 year planning
horizon. The predicted future noise levels consider the 2037 traffic volumes.
Table 23 presents the road traffic noise QDC noise category results for the residential development. Single
point receiver results are shown in Appendix D.
Table 23: QDC Noise Category Treatments - Road Traffic

                                                QDC Noise Category By Façade and Floor
                                                          Road Traffic Noise
      Building           Floor
                                                           Habitable Rooms
                                     Northeast           Southeast       Southwest         Northwest
                         First                           All facades are Category 0
        A.1
                        Second                           All facades are Category 0
                         First                           All facades are Category 0
        A.2
                        Second            1                     0            0                 0
                         First            1                     1            0                 0
        A.3
                        Second            1                     1            0                 0
                         First            2                 N/A*             1                 0
        B.1
                        Second            2                 N/A*             1                 0
                         First            1                 N/A*             1                 0
        B.2
                        Second            1                 N/A*             1                 0
                        Ground            0                     1            1                 0
         C               First            1                 N/A*             1                 0
                        Second            1                 N/A*             2                 0
                        Ground          N/A*                    0            0               N/A
         D               First            0                     0            1               N/A*
                        Second            0                     1            1                 0
*An enclosed corridor separates habitable rooms from the external environment


Site: Eenie Creek Road, Noosaville                                                                           31
Reference: 22BRA0078 R01_4

Page 33

Figure 8 shows the corresponding building assignment.
Figure 8: Corresponding Residential Buildings




                                                                          B.1
                        A.1             A.2           A.3


                                                                          B.2




                                                            D              C




The following figures presents the noise contours for the indicative road traffic QDC noise categories. Note
the noise contours shown are above ground level and due to ground level variation are not representative of
any one specific floor and should be considered indicative only.




Site: Eenie Creek Road, Noosaville                                                                      32
Reference: 22BRA0078 R01_4

Page 34

Figure 9: Predicted Road Traffic Noise Levels at 1.8m AGL (Indicative only)




Figure 10: Predicted Road Traffic Noise Levels at 4.8m AGL (Indicative only)




Site: Eenie Creek Road, Noosaville                                             33
Reference: 22BRA0078 R01_4

Page 35

Figure 11: Predicted Road Traffic Noise Levels at 7.8m AGL (Indicative only)




Based on the noise modelling results, the development is predicted to be impacted by road traffic noise at
QDC MP4.4 noise category 0-2.
Refer to Section 8 for recommended noise mitigation measures.




Site: Eenie Creek Road, Noosaville                                                                       34
Reference: 22BRA0078 R01_4

Page 36

8 Recommendations
Compliance with the criteria outlined in Section 5 is predicted to be achieved based on the inclusion of the
recommendations outlined below.

8.1           Onsite Residential Building Attenuation
For onsite noise and road traffic noise it is recommended to incorporate façade attenuation into the
proposed onsite residential buildings for habitable rooms.
Road traffic noise façade treatment requirements are presented in Table 23.
For onsite noise attenuation, it is recommended all onsite residential dwellings are constructed to achieve a
façade noise reduction of min. 25dB for habitable rooms (equivalent to QDC Noise Category 1). Onsite
habitable rooms adjacent to the proposed plaza area (outdoor dining) to achieve a façade noise reduction of
min. 30dB for habitable rooms (equivalent to QDC Noise Category 2).
Table 24 presents the recommended façade treatment requirements for road traffic noise and onsite noise
combined.
Table 24: Noise Category Treatments - Road Traffic and Onsite Noise Combined

                                             QDC Noise Category By Façade and Floor
                                               Road Traffic Noise and Onsite Noise
      Building       Floor Level
                                                        Habitable Rooms
                                     Northeast     Southeast      Southwest       Northwest
                         First           1             1               2               1
        A.1
                        Second           1             1               2               1
                         First           1             1               2               1
        A.2
                        Second           1             1               2               1
                         First           1             1               2               1
        A.3
                        Second           1             1               2               1
                         First           2            N/A*             1               1
        B.1
                        Second           2            N/A*             1               1
                         First           1            N/A*             1               1
        B.2
                        Second           1            N/A*             1               1
                        Ground           1             1               1               1
         C               First           1            N/A*             1               1
                        Second           1            N/A*             2               1
                        Ground         N/A             1               1              N/A
         D               First           2             1               1              N/A*
                        Second           2             1               1               2
*An enclosed corridor separates habitable rooms from the external environment

Figure 12 shows the corresponding building locations.



Site: Eenie Creek Road, Noosaville                                                                         35
Reference: 22BRA0078 R01_4

Page 37

Figure 12: Corresponding Residential Buildings




                                                                                               B.1
                        A.1                    A.2                   A.3


                                                                                               B.2




                                                                            D                   C




Details regarding sound reduction requirements are presented in Table 25
Table 25: Recommended Residential Building Attenuation

                                         Required Acoustic Rating (R w ) for Habitable Rooms
    QDC Noise
     Category                Glazing                  Glazing           External Walls         Roof and Ceiling
                            > 1.8m 2 *               ≤ 1.8m 2 *

     Category 2               RW 35                   RW 32                  RW 41                      RW 38
     Category 1               RW 27                   RW 24                  RW 35                      RW 35

*Glazing area refers to total glazing area in a room, not the area of a single window / sliding door.
Based on sound reduction requirements from Queensland Development Code MP4.4, Schedule 1 (Appendix D)

8.2          Management Strategies
The following management strategies are recommended:
     a. Operating hours as outlined in Section 3.1 (which are predominately in accordance with the code
        acceptable outcomes).

     b. Balconies to have solid balustrades at Receiver A (all southwest façades) and Receiver D (northeast
        facade) .

     c. Amplified music for restaurants to be limited to low level background music only.

     d. Any speed humps should be bitumen, concrete (as part of the slab) or rubber, not metal.


Site: Eenie Creek Road, Noosaville                                                                                36
Reference: 22BRA0078 R01_4

Page 38

     e. Any grates or other protective covers in the car parking area should be rigidly fixed in position to
        eliminate clanging and be maintained.

8.3          Mechanical Plant Noise
As detailed plant selections are not available at this stage, it is not possible to carry out a detailed
examination of the noise control measures that may be required to achieve the noise targets for mechanical
plant.

To comply with code acceptable outcomes (AO79), it is recommended that exposed mechanical plant in
proximity to noise sensitive receivers is acoustically screened.

A mechanical plant noise assessment can be conducted by a suitably qualified acoustic consultant during
detailed design stage once plant selections are finalised.




Site: Eenie Creek Road, Noosaville                                                                             37
Reference: 22BRA0078 R01_4

Page 39

9 Conclusion
TTM was engaged by Stockwell Development Group Pty Ltd to undertake an environmental noise
assessment of the Noosa Civic Village Mixed Use Development of Noosa Civic Shopping Centre located at
Eenie Creek Road, Noosaville. The assessment was based on the Noosa Council Planning Scheme (Noosa Plan
2020).

Compliance with the Noosa Council Planning Scheme is predicted to be achieved based on the
implementation of the recommendations outlined in Section 8 of this report.




Site: Eenie Creek Road, Noosaville                                                                 38
Reference: 22BRA0078 R01_4

Page 40

Appendix A                           Development Plans




Site: Eenie Creek Road, Noosaville                       39
Reference: 22BRA0078 R01_4

Page 41

ttm

NVHON

ORY

wreegons

—=

 

 

 

 

 

 

 

 

 

 

 

 

NOVSTSA SNEOTSISS oe

 

 

 

eam

903% C7 aMNeSCON
Bu ¥2200 ames gC

ANaWdO73A30 3SN G3xXIW
ZOVTUA JIAID VSOON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

40

Site: Eenie Creek Road, Noosaville

Reference: 22BRA0078 RO1_4

Page 42

ttm

NVHON&

 

Nv 3NO 73031

——=

 

 

 

 

 

 

 

 

 

 

i
yA yey a

 

 

 

 

NOUVSRE GNOTSISS owe

 

 

 

am

903% C7 aNesCON
Bey ¥810 Sues BT

-LN3WdOTSA30 3M G3XIM
ZOVTIA JIAID VSOON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

scenncenenneeaf

\

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

\ 4

boi oh 14 dhe

Oo

| oy ONT

\ @ <=
rae

@
we \S4

41

Site: Eenie Creek Road, Noosaville

Reference: 22BRA0078 RO1_4

Page 43

ttm

sorte am

NVHONE [==

way

NV id OML "BAST

a

 

 

 

 

 

 

 

 

 

 

 

 

 

SS
ma

 

905% C70 AMMeSCON
Buy ¥98n0 283 6

4AN3WdO713A30 3SN G3XI
SOVTIIA SIAID VSOON

 

 

 

 

 

 

= Saree

= Tae woe

5 ‘tet woe [on
Taare crema [=]

 

 

 

 

 

 

 

 

 

 

 

 

 

en i MOE
== Era

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

42

Site: Eenie Creek Road, Noosaville

Reference: 22BRA0078 RO1_4

Page 44

Appendix B                           Unattended Noise Monitoring
                                     Graphs




Site: Eenie Creek Road, Noosaville                                 43
Reference: 22BRA0078 R01_4

Page 45

it

Logger Location 1

Thursday, 23 March 2023

WWQ panna nn nn nn nn nn nn no no nn no no no nn no nn nn nn nn nn nn nn nn nnn nn enn nn nn nn en nn nn nn nnn enn nn nnn

90 panna nnn nnn nn nnn nnn nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn nnn nn nn nn nn nn nn nn nn nn nn nn nn nn nn ene

 

 

--=-+ Leg

—-—L10

L90
Excl

 

 

  

(vlap ‘texa7 aston

 

weod'on'6

Weedon:

we oa'nn:2

We00:00°9)

wieen'n0:s

We oor00:H

Ws00:00:e

We o0:00°2,

We00:00:T

Wd 00:0027

WAY 00:008 TT

Wy o0:00:0T

WY 00:06

wy an:onrs

vay aotoore

 

wy coins

Wy oo:00's

wy coon

NV 0000"

 

wy coon

wy ao:onrr

Woy 00:00°2r

Time

Friday, 24 March 2023

100 pa nn nn nn en ne nn nn nn nn nn nn nn nn en nn ne nn re ene

90 penn nnn ne ne nnn nn nn nn nn nnn nn nnn nn nnn nn nn nn en nnn nn nn nn nnn en nn nnn ne nen nnn ne

 

 

----+Leq

Excl

 

 

 

(v)ap “fa437 aston,

We 00:00:11

Weeo:00:0T

wid ooroa's:

Wa oe00:s

wid ooro0%e

wid ooroa's)

wa 0000's

Wd 00°00:

Wid ooro0'e

   

wid ooroa:2,

Wa 00e00:t

W600:00:7T

WW 00:00:77

wy oo:00'0r

Ww 00:00:65

wy co:00:8

www eo:00:e

wv 60:00:9

wv 00:00'5

wy eo:00:

wv oc:00:€

ww 00:00:2

vy eo:00°7

wy oatoa'zt

Time

44

Site: Eenie Creek Road, Noosaville

Reference: 22BRA0078 RO1_4

Page 46

it

Saturday, 25 March 2023

MOQ aan nnn nnn nn nn nnn nn eo nn nn eo ne nen nn eo enn nn eon en nen nn ne neon nn ne ee nono ne-ee--y

0

 

 

n----Leq

——110

L90
Excl

 

 

 

(v)ap ‘1ena7 asion

 

We 00:00:17

 

We 00:0

Wd 00:00:6

Wd 00:00:8

Wd 00:00:2

Wd 00:00:9

Wd 00:00:

Wd 00°00"

Wd 00:00:

Wd 00:00:2

Wd 00:00:

We 00:00°7r

WV 00:00: TT

Wy 00:00'0T

wv 00'00's

Wwv00'00'8

wv ooron

wv 00009

wwv00'00's

wv 00007

wv 0000

wv oon:

wv ooo0't

Wy 00002

  

Time

Sunday, 26 March 2023

MOQ wane nn nnn en nnn nnn nnn nnn nn nnn nn nn nnn nn nn nnn nn nnn nnn nn nnn nn nn nn nnn nn nn enn nn eee e nee

90 wae enn en nn en rn en en nn enn en nn nee

g9 ---------------------------------------------------------------------------------------------

 

 

 

——110

L90.
Excl

 

 

-a~-n

erent ene

a,

 

a

    

(v)ap ‘12097 asion

Wd 00:00: EE

 

 

w

 

Wa 00-008

 

Wa 00:00:

Wa 00:00:

Wa 00:00:2

 

a0:

wa oaoar2

Wy 00:00:17

Ww 00:00:07

wv 00:00:6

wv 00:00:8

wv 00:90

wv 90'00:9

 

Ww 00:00:

ww 00:00:€

Ww 00:00:2

wv 00:00:

ww 00"

 

Time

45

Site: Eenie Creek Road, Noosaville

4

Reference: 22BRA0078 RO1.

Page 47

it

Monday, 27 March 2023

100 pen nn nn nn en en nn nr rn nn en nn nn en nn ee ree eee

90 pan nn nnn nn nnn nn nn nnn nn nnn nn nn nn nn nnn nnn en nn nnn nnn nen nnn ne nnn nn nnn enn

 

 

n-=--Leq

—-—110

L90
Excl

 

 

 

(v)ap ‘12027 asIon

 

00.07

Wa 00:00:6

 

wd 00:00:9

wa 00:00'5

Wa 00:00:

wa no:on:e

Wd 00:00'%

 

wWaoo:00'zt

vy 09:00:21

wv 9:00:07

Wi 00:00:6

wv 900.8

  

00:9
Wy 0000's
Wy 0000:
wy oon
Wy oo.00z
wy 00'00"T

ww 00:00:71

Time

Tuesday, 28 March 2023

100 -------------------------------------------------- +--+ -------------- 2 +--+ 2-2-2 ---------------

90 wenn ne en nn en rn rn ne nn nn rn nn nn rn eee eee

 

—-—110
— L190
Excl

 

 

 

 

    

  

Looe -[ ene 2 enone nn nnn eee ne ee eee ee

      

/

i
N
~ he!

80 e+ += 22-2 ----------------

 

(w)ap ‘19027 aSION

Ww 00:00: TT

Wa ooron:0T

Wwe 00:00:6

We 00:00:

We 00:00:

WN 00:00:9

Ne eo:00's

We oc:00:7

Ww

 

o:00%e

We eo:00:2

We eo:00:t

Wa coroner

wy 00:00°TT

 

ww 00:00:9

Wy 00:00'5

Wy 00:00:

 

Ww a0:00:2

Ww a0:00°T

 

Time

46

Site: Eenie Creek Road, Noosaville

4

Reference: 22BRA0078 RO1.

Page 48

it

Wednesday, 29 March 2023

90 wee enn en en nn ne nn en en nn en nn nn nn ener

MOQ wane nn nnn en nnn nnn nn nnn ne nnn nn nn nnn nn nn nnn nn nnn nnn ne nnn ne eee eee eee e ee

 

 

---=-Leq
—-—L10
—190

Excl
o=--+Leq

——.10

Lg0
Excl

 

 

 

 

 

 

   
   

 

 

 

 
  

i i i
' ' '
Wid 00:00:TT 1 1 '
' ' ' Waoo:00:rE
' ' '
' ' ' :
a oo-00% ' ' '
1 1 1 We
avo ' ' '
! ! ' Na00:00'8
' ' '
! ! ' Na ooi00%e
7 ' ' '
A ' ! ' o:00'9
' ' '
¥K ' ' '
te :
> ' ' '
i< Na 00-00:7 om! ' ' a 00%00%»
a ' :
{ Si ' '
a Nd 00'00%e a} ! '
‘ <1 ' i
4 S| ' '
Weare & ' ' wa oon:
a Ss I ‘
< 2 | ' '
\ 00: a ' '
/ =| ' ‘
\ avon: &! ! '
at ' '
' ' '
) vv 00:00'1 2 | ' ' vwv00'0071
1 o an ' t
4 vvooooor & ! ! ! WW 00:00:07
} iv 00006 ' ' ' Wv00.00'6
' ' '
' ' '
Nv oo:00%8 ' ' ' Av o0.0018
' ' '
' ' '
vy 00.00% ' ' ' iv 00.00%
wy 00:00'9 ' ' t voo:0'9
' ' '
' ' ' Nv 00:00'5
Wy 00:00: I I t I I WV o9'0Di
' ' ' ' '
Nv o0-va:e : : ! ' : Nv 00.00%
' ' ' i '
' ' ' ' '
Av oo:00%e ! ! ! ! ~ v00.00:2
' ' ' i -
= Nv 00:00°r ' ' ! ! ' NV 00:00°T
“x Ww 00:00°2r \ \ ! 1 1 Wy o9:00°7T
2 8 & 8 g 8 g 8 2 8 g g 8 g
(wap “12097 asion (v)aP ‘1ane7 asion

47

Time

4

Site: Eenie Creek Road, Noosaville
Reference: 22BRA0078 RO1.

Page 49

it

Logger location 2

Thursday, 23 March 2023

100 ------------------------------------------------- +--+ 2+ +--+ -- +--+ == + 2-2-5 + 2-2-2 ----------

90 wenn nn rn rn en er nn rn nn nn en en rn nn rn rn nn ee eee

BQ wo nnn nn nnn nn no nn eo eo nn en nn ene en ono nnn en nn nnn een nnn nn ene en nee ene nee ene ee

 

 

 

 

7774
iy
i
(
)
ry
( ¢
(i
4
’
‘
:

TO po nnn nnn nnn nnn nnn nnn nnn nen ne pe

8

(w)ap ‘1027 SION

             

We

 

t

Wa oo:00r0T

We 00:00:6

We oc:00:8

We o:00:2

We eo:00:9

We oo:00's

We o0:00'%

Wwe 00:00:

We oo:oorzt

wv 09:00:

Wy 00:00:97

wv a0:00:6

 

Time

Friday, 24 March 2023

M00 pane nnn nnn nnn nn nn nn no nnn nnn en nnn nn en nn nn nn nnn en nnn nnn enn en nnn ene en en nnn eee n eee

 

 

-----Leq

—-—110

L90
Excl

 

 

 

(w)ap “1927 SION

Weeoro0: tt

We eaoc0L

wid oorea's

wid oorea's

wid onreore

wid oo'ea's

wid oo'ee's

wid ooreary

wid orcas

Wd oo'eo:z

wid oo'ea:t

Wee0:007r

WV 00:00: TT

wy ooron:oT

www oc:00:6

ww ocroo:8

www oc:00:e

ww ecr00:s

wy ecroo:s

www oc:00:9

   

OO00'E

wy 0o:00'7

vy eo:00:r

WV ooronrzT

Time

48

Site: Eenie Creek Road, Noosaville

4

Reference: 22BRA0078 RO1.

Page 50

it

Saturday, 25 March 2023

100 22-22-22 oo 2 ono eo eo nn eo on nen nnn nen nn eo eo neo eo eee eee eo neon eo one - =e =e

90 wanna nn ooo 2 eo oo 2 2 2 noo eo eo nn eo eo nen no on ee ne ee ee ee eee ee ee ee eee - == =e

 

 

-----Leq

—-—L10

L90
Excl

 

 

 

(v)ap ‘2a27 aston

 

U

\Aid 00:00:07

WN 00:00:6

Wa 00:00:8

Wd 00:00:4

Wd 00:00:9

Wd 00:00:

Wa 00:00”

WNd 00:00:

Wa 00:00:2

Wd 00:00:

Wd c0:00:2

W¥ 00:00 TL

WY 00:00:01

 

6

WNW 00:00'8

wi ooronie

 

WW 00:00'9

 

wi 00:00'7

WN Co:O0%e

wiv 00:02

WN 00:00:T

wy 00:00°2E

Sunday, 26 March 2023

100 ---------------------------------------------------------------------------------------------

90 naan enna enna nnn nnn nn nn eo eon nnn nn nn eo en oe eo nnn nnn nn eo neon no nnn nnn nnn ene ene n ee

BQ aan nn nn nnn nnn nnn nn nn nnn nn nn nnn nnn nn nn nnn nn nn nnn nnn nn nn nn nnn nnn nnn nnn nn nnn ene een n ee

 

 

--==-Leq

L90
Excl

 

 

SRS SS SS

Nr NO

[0 ween nena nen n nnn n nnn nee n eee e een ee

(vJap ‘1ana7 asion

 

20

Wd 00:00 TL

Wd 00:00:01

Wd 00:00:65

  

u 8

Wd 00:00%2.

 

Wa 00:00:5

u

 

Wa 00:00:¢

Wd 00°00°2,

Wad 00°00:

 

Wd 00:00°21

Wy 00:06 Tr

W00'000T

wv!

 

Wy o0:00:8

  

u

“

wv on:00:9

wv o0rc0's

Wy 00:00:

Ww o0-00e

 

wv 00-00:

Wy 00:02

 

Time

49

Site: Eenie Creek Road, Noosaville

4

Reference: 22BRA0078 RO1.

Page 51

it

Monday, 27 March 2023

100 ---------------------------------------------------------------------------------------------

90

80 Anne nnn nn nnn nnn no enn nnn no eo nen nnn enn en nn nnn eo en enn nn ene en enn ne eee eee -ee

 

 

 

—-—110

L90
Excl

 

 

 

DRS RSLS

ow

 

(w)ap ‘12097 esion,

We eo:00: CE

We eo:00:0T

We 00'00'6

We00'00'8

We 90:00:

We00'00'9

We00:00:5

We 00'00'7

We 00°00"

We 00:00:

We 00°00'T

We 60:00:7T

Wy 00:00:71

Wi 00:00:01

wv 00:00:65

Wy 00:00:

WV 00:00"

WW 00:00:9

WW 60:00:6

WW C0007

Ww coon

Ww ooron:z

WW e000:

wy oo:00'zt

Time

Tuesday, 28 March 2023

100 poo nnn on nn no nn nn nnn nn nn nnn nn nn nnn en nn nnn nnn nnn nnn nnn nn nnn nnn nnn nnn nnn nn nner eres

99 --~--------------~----------------------------------------------------------------------------

80 Bonn nn nnn nn nn nn nn nn nn nn nn nn nn nn nen nn nnn nnn nnn nnn nn nnn nnn nnn nnn nnn nnn nner nner

 

 

n--+-Leq

—-—L10

— 190

Excl

 

 

\
‘
‘
‘
}
‘
'
‘
\

 

 

 

We 00:00:8

We 00:00%2,

  

Ww

We 00:00:5

We 00:00”

We 90:00

We 00:00:

We 00:00

We 00:00:71

WN 00:00:

W¥ 00:00°0)

wiv 00006

wiv 00:00°8

Wi 00:00:

wv 0000'9

wv 00:00'5

Wi 0000:

wv 0000"e

wv 00002

WY 0000:

Wi 00:00°2r
8

Time

50

Site: Eenie Creek Road, Noosaville

Reference: 22BRA0078 RO1_4

Page 52

 

it

n---+Leq

 

 

—-—1L10
L90
Excl
=----Leq
L90
Excl

 

 

 

 

 

Wednesday, 29 March 2023

MOQ pee nn en nnn nn enn nn enn pn en eee een
BO een een en nnn en enn nn enn en nnn enn

90

 

 

 
 

 

 
      

 

 

 

 
 

 

 

   
   

' ' ' ' ' Na oo.o0eT
' ' ' ' i
{ ' ' ' '
' Na oo'oc:or ' ' ' ' ‘Ne o0:0¢0t
{ ' ' 1 '
{ t ' ' {
' ? ' ' t '
if We 1 1 1 1 We 6
1 oY ' ' t {
ros pose ' ' ' ‘ peo:
1s Weon-00:8 : : : ! Weoron8
io ' ' ' '
' ' ' ' '
17 we 00:00%4 : ! : : We 0:0
it \ ' \ ' ‘
' ' ' '
7 ! ' ! ' ! Wie 00:00:9
“ i i I i 1
' ' ' t '
q ' We 000055 ' t ' ' We 00°00:5,
' W000: om \ ' ' We 00: 00%
1 at ' t t
1 S 1 1 1 1
1 N 1 1 1 1 We 00:00,
' ct \ ' i
{ St ' ' '
' an ' ' '
' Wie 00:00: a ' ' ' We oo:00%
' t ' 1 {
zi of ft |
' We00-00:7 mt ' t { We 00:00:1
‘ yy ' ' '
' St ' ' '
e ' ' '
I w 3 ' ' ' Na oo'oorzr
' at ' ' '
' gt ' ' '
! ‘Ay o0:00°Tr =! : : !
1 - ' 1 ' io
1 gz ' 1 ' 1
' E ' ' ' '
' = t ' 1 {
' ' ' t '
‘ ' ' ' '
' vo000 ' ' t { wv 09-00:6
' Wy o0:00:6 ! ! ! ! wv00 00:6
I ' ' ' '
{ ' ' ' '
! \ wv 00-008 ' ' ' a Wy 00.0038
é t t ' t 4
i ' ' ' ' , Wy 00:00:
A ' ' ' ' A
1 ' ' ' '
y ' ' ' '
' wv o0:00:9 ' ' ' 9
s ' ' ' '
1 No 1 1 1 1
1 Te. WY 00:00'5 t Hl 1 t Wy 00:00:5
' LY ' ' ' '
' ' ' ' '
t t wiv 9:00: t ' t : wv 00°00:
' ' wv o.oo ' 1 ' : v0.
' ' ' ' ' '
‘ ‘ ' ' ' '
! ! wv 00:00: ! ! ! ! wv 00:00:
I I ' ' ' '
{ { ' ' ' '
' ' vy t ' ' '
1 1 Wo 1 1 1 1
t ‘ Av o0:00:2r \ 1 1 ‘ Av oo:00%2r
g 8 g 8 g 8 R g
(w)ap ‘1an27 esion (w)ap ‘an27 esion

51

Time

4

Site: Eenie Creek Road, Noosaville

Reference: 22BRA0078 RO1.

Page 53

Appendix C                           SoundPLAN Results - Onsite Noise
                                     Assessment




Site: Eenie Creek Road, Noosaville                                      52
Reference: 22BRA0078 R01_4

Page 54

ttm

 

Environmental Noise Emission - Leq,1hr (day/evening)
Receivers at 1.5m AGL

 

Noise levels Leg tHr

dB(A) (Free Field)
<30
30 <= [ll <32
32 <= [ll <34
4<=, <36
36<=  <38
38<=  <40
40<= <4
A2<=| <4
44 <= <45
46 <= | <48
48 <= [I <50
50 <= [i <52
52 <= <54
54 <= [MM <56
56 <= [MN <58
58 <=
Signs and symbols
Contour

Acoustic Barrier

Receiver

“| |

Point source

 

Line source
Main building

Noise calculation area
Industrial building, Room
Outdoor point source
Auxiliary building

Wall

| |G OU

t Base line

Length Scale 1:4261
om 0% 20 100
a =

 

Environmental Noise Emission - Leq, thr (night)
Receivers at 1.5m AGL

 

Site: Eenie Creek Road, Noosaville

Reference: 22BRA0078 RO1_4

 

Noise levels Laeg tHr
dB(A) (Free Field)

<30
30 <= [I < 32
a2<=[)<34

Bac <36
aecz 38
38<= << 40
aQ<= << 42
Adc < ad
4g <= <5
46 <= [I < 40,

48 <= |i < 50
50 <= [I <52
52 <= [MM <54
54 <= [MM <56
56 <= [I <58
58 <=

Signs and symbols
Contour

Acoustic Barrier
Receiver

Point source

Line source

Main building

Noise calculation srea
Industrial building: Room
Outdoor point source
Auniliary building

Wall

| | -OU0) - #1 |

t Base line

 

= ttm
on 0 9 1 100
a

53

Page 55

ttm

 

Environmental Noise Emission - Lmax (night)
Receivers at 1.5m AGL

 

Site: Eenie Creek Road, Noosaville

Reference: 22BRA0078 RO1_4

 

t

Length Scale 1:4261

a ee ee ee)
se =

Noise levels Lmax
dB(A) (Free Field)

48 <=
50 <=

82.<=
54 <=
56 <=
58 <=
60 <=
62<=
64 <=
66 <=
68 <=
70 <=
72<=
T4<=
76 <=

Signs and symbols

Contour

-*| |

 

Main bui

Wall

| |i GUS

Base lin

<48
<50
<52
< 5d
<56
<58
<60
<62
<64
<66
<68
<70
«72
<74
<76

Acoustic Barrier
Receiver
Point source

Line source

ilding

Noise calculation area
Industrial building: Room
Outdoor point source

Auxiliary building

e

tim.

 

54

Page 56

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Noosa Civic Expansion, Eenie Creek Road, Noosaville
Assessed receiver levels
"Im pact Assessem ent - Exisitng & Proposed.sit"
Name Floor Facade Leqthr,day |Leqthr,evening| Leq,1hr,night | Lmaxnight
Direction External External External External
dB(A) dB(A) dB(A) dB(A)
Receiver 1 GF 29 29 6 24
Receiver 2 GE 27 27 23 45
Receiver 3.1 GF 33 33 27 43
Receiver 3.2 GE 29 29 26 48
Receiver A.1 1.FL NE 49 49 49 67
2.FL 49 49 49 64
Receiver A.1 1.FL NW 38 38 18 38
2.FL 39 39 22 38
ReceiverA1 4.FL SE 39 39 35 55
2.FL 45 45 42 55
ReceiverA1 4.FL Sw 57 57 27 50
2.FL 56 56 25 47
Receiver A2 4.FL NE 44 44 43 61
2.FL 46 46 46 61
Receiver A.2 1.FL NW 46 46 39 57
2.FL 48 48 39 56
Receiver A.2 4.FL SE 50 50 33 56
2.FL 50 50 3 56
Receiver A2 4.FL Sw 58 58 7 38
2.FL 57 57 17 38
Receiver A3 4.FL NE 40 40 40 61
2.FL 40 40 39 60
Receiver A3 1.FL NW 47 47 34 57
2.FL 47 47 34 58
Receiver A3 1.FL SE 34 34 32 63
2.FL 35 35 32 62
Receiver A3 4.FL Sw 53 53 16 45
2.FL 54 54 20 51
Receiver B.1 4.FL NE 32 32 28 55
2.FL 3 3 28 55
Receiver B.1 4.FL NW 35 35 29 58
2.FL 7 7 30 58
Receiver B.1 1.FL sw 37 7 32 60
2.FL 39 39 32 60
Receiver B.2 4.FL NE 36 36 33 60
2.FL 38 38 32 60
Receiver B.2 4.FL NW 40 40 26 54
2.FL 45 45 26 54
Receiver B.2 4.FL Sw 36 36 29 58
2.FL 41 41 29 57
TTM Consulting Pty Ltd Page 1
SoundPLAN 8.0

Site: Eenie Creek Road, Noosaville

Reference: 22BRA0078 RO1_4

ttm

55

Page 57

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Noosa Civic Expansion, Eenie Creek Road, Noosaville
Assessed receiver levels
“Im pact Assessem ent - Exisitng & Proposed.sit"
Name Floor Facade Leqthr,day |Leqihr,evening} Leg, 1hr,night | Lmaxnight
Direction External External External External
dB(A) dB(A) dB(A) dB(A)
Receiver C GF NE 7 7 24 50
4.FL 37 37 28 54
2.FL 38 38 29 54
Receiver C GF NW 30 30 23 50
4.FL 32 32 27 54
2.FL 34 34 27 55
Receiver C GF SE 29 29 29 54
Receiver C GF Sw 26 26 25 47
4.FL 27 27 26 52
2.FL 30 30 29 52
Receiver D 4.FL NE 52 52 16 46
2.FL 52 52 7 45
Recewer D 2.FL NW 52 52 19 38
Receiver D GF SE 32 32 31 63
Receiver D 4.FL SE 32 32 28 57
2.FL 3 33 28 57
Receiver D GF Sw 39 39 39 62
4.FL 39 39 39 61
2.FL 39 39 39 60
TTM Consulting Pty Ltd Page2
SoundPLAN 50

Site: Eenie Creek Road, Noosaville

Reference: 22BRA0078 RO1_4

ttm

56

Page 58

ONSITE NOISE ASSESSMENT - ONSITE RECEIVERS - FAÇADE ATTENUATION INCLUDED
SoundPLAN v9                                                                                                                                              CRITERIA COMPARISON
                                                                                                                                                              EPP               Sleep
                                                                                                                                                  External   Internal Internal Internal
                                                       EXTERNAL NOISE LEVELS                                     INTERNAL NOISE LEVELS            Day/eve    Day/eve Night       Lmax
                            Facade     Leq1hr,day Leq1hr,evening      Leq,1hr,night     Lmax,night         Façade      Leq1hr   Leq1hr   Lmax
Name              Floor    Direction External dB(A) External dB(A)   External dB(A)   External dB(A)   Attenuation dB Day/eve    Night   Night       50        35        30       45

Receiver A.1      1.FL        NE          49             49                49               67              25          24        24      42         ok        ok       ok        ok
Receiver A.1      2.FL        NE          49             49                49               64              25          24        24      39         ok        ok       ok        ok
Receiver A.1      1.FL        NW          38             38                18               38              25          13        -7      13         ok        ok       ok        ok
Receiver A.1      2.FL        NW          39             39                22               38              25          14        -3      13         ok        ok       ok        ok
Receiver A.1      1.FL        SE          39             39                35               55              25          14        10      30         ok        ok       ok        ok
Receiver A.1      2.FL        SE          45             45                42               55              25          20        17      30         ok        ok       ok        ok
Receiver A.1      1.FL        SW          57             57                27               50              30          27        -3      20         No        ok       ok        ok
Receiver A.1      2.FL        SW          56             56                25               47              30          26        -5      17         No        ok       ok        ok
Receiver A.2      1.FL        NE          44             44                43               61              25          19        18      36         ok        ok       ok        ok
Receiver A.2      2.FL        NE          46             46                46               61              25          21        21      36         ok        ok       ok        ok
Receiver A.2      1.FL        NW          46             46                39               57              25          21        14      32         ok        ok       ok        ok
Receiver A.2      2.FL        NW          48             48                39               56              25          23        14      31         ok        ok       ok        ok
Receiver A.2      1.FL        SE          50             50                33               56              25          25        8       31         ok        ok       ok        ok
Receiver A.2      2.FL        SE          50             50                33               56              25          25        8       31         ok        ok       ok        ok
Receiver A.2      1.FL        SW          58             58                17               38              30          28       -13      8          No        ok       ok        ok
Receiver A.2      2.FL        SW          57             57                17               38              30          27       -13      8          No        ok       ok        ok
Receiver A.3      1.FL        NE          40             40                40               61              25          15        15      36         ok        ok       ok        ok
Receiver A.3      2.FL        NE          40             40                39               60              25          15        14      35         ok        ok       ok        ok
Receiver A.3      1.FL        NW          47             47                34               57              25          22        9       32         ok        ok       ok        ok
Receiver A.3      2.FL        NW          47             47                34               58              25          22        9       33         ok        ok       ok        ok
Receiver A.3      1.FL        SE          34             34                32               63              25          9         7       38         ok        ok       ok        ok
Receiver A.3      2.FL        SE          35             35                32               62              25          10        7       37         ok        ok       ok        ok
Receiver A.3      1.FL        SW          53             53                16               45              30          23       -14      15         No        ok       ok        ok
Receiver A.3      2.FL        SW          54             54                20               51              30          24       -10      21         No        ok       ok        ok
Receiver B.1      1.FL        NE          32             32                28               55              25          7         3       30         ok        ok       ok        ok
Receiver B.1      2.FL        NE          33             33                28               55              25          8         3       30         ok        ok       ok        ok
Receiver B.1      1.FL        NW          35             35                29               58              25          10        4       33         ok        ok       ok        ok
Receiver B.1      2.FL        NW          37             37                30               58              25          12        5       33         ok        ok       ok        ok
Receiver B.1      1.FL        SW          37             37                32               60              25          12        7       35         ok        ok       ok        ok
Receiver B.1      2.FL        SW          39             39                32               60              25          14        7       35         ok        ok       ok        ok
Receiver B.2      1.FL        NE          36             36                33               60              25          11        8       35         ok        ok       ok        ok
Receiver B.2      2.FL        NE          38             38                32               60              25          13        7       35         ok        ok       ok        ok
Receiver B.2      1.FL        NW          40             40                26               54              25          15        1       29         ok        ok       ok        ok
Receiver B.2      2.FL        NW          45             45                26               54              25          20        1       29         ok        ok       ok        ok
Receiver B.2      1.FL        SW          36             36                29               58              25          11        4       33         ok        ok       ok        ok
Receiver B.2      2.FL        SW          41             41                29               57              25          16        4       32         ok        ok       ok        ok
Receiver C         GF         NE          37             37                24               50              25          12        -1      25         ok        ok       ok        ok
Receiver C        1.FL        NE          37             37                28               54              25          12        3       29         ok        ok       ok        ok
Receiver C        2.FL        NE          38             38                29               54              25          13        4       29         ok        ok       ok        ok
Receiver C         GF         NW          30             30                23               50              25          5         -2      25         ok        ok       ok        ok
Receiver C        1.FL        NW          32             32                27               54              25          7         2       29         ok        ok       ok        ok
Receiver C        2.FL        NW          34             34                27               55              25          9         2       30         ok        ok       ok        ok
Receiver C         GF         SE          29             29                29               54              25          4         4       29         ok        ok       ok        ok
Receiver C         GF         SW          26             26                25               47              25          1         0       22         ok        ok       ok        ok
Receiver C        1.FL        SW          27             27                26               52              25          2         1       27         ok        ok       ok        ok
Receiver C        2.FL        SW          30             30                29               52              25          5         4       27         ok        ok       ok        ok
Receiver D        1.FL        NE          52             52                16               46              30          22       -14      16         No        ok       ok        ok
Receiver D        2.FL        NE          52             52                17               45              30          22       -13      15         No        ok       ok        ok
Receiver D        2.FL        NW          52             52                19               38              30          22       -11      8      No balcony    ok       ok        ok
Receiver D         GF         SE          32             32                31               63              25          7         6       38         ok        ok       ok        ok
Receiver D        1.FL        SE          32             32                28               57              25          7         3       32         ok        ok       ok        ok
Receiver D        2.FL        SE          33             33                28               57              25          8         3       32         ok        ok       ok        ok
Receiver D         GF         SW          39             39                39               62              25          14        14      37         ok        ok       ok        ok
Receiver D        1.FL        SW          39             39                39               61              25          14        14      36         ok        ok       ok        ok
Receiver D        2.FL        SW          39             39                39               60              25          14        14      35         ok        ok       ok        ok

                         MAXIMUMS
                          Receiver A      58             58                                                             28        24      42
                          Receiver B      45             45                                                             20        8       35
                          Receiver C      38             38                                                             13        4       30
                          Receiver D      52             52                                                             22        14      38




Site: Eenie Creek Road, Noosaville                                                                                                                                               57
Reference: 22BRA0078 R01_4

Page 59

Appendix D                           SoundPLAN Results – Road Traffic
                                     Noise Assessment




Site: Eenie Creek Road, Noosaville                                      58
Reference: 22BRA0078 R01_4

Page 60

ttm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Noosa Civic Expansion, Eenie Creek Road, Noosaville 2
Assessed receiver levels
"Walter Hasye Drive RTN - Prediction.sit" "RDGM0001.dgm"
Receiver FI Dir L10(18h)}-NMW
dB(A)
Receiver A.1 1.FL SW 49.8
2.FL 51.9
Receiver A.1 1.FL NW 440
2.FL 49.0
Receiver A.1 1.FL SE 50.3
2.FL 52.6
Receiver A.1 1.FL NE 54.9
2.FL $7.1
Receiver A.2 1.FL NE $7.7
2.FL 58.9
Receiver A.2 1.FL NW 446
2.FL $0.2
Receiver A.2 1.FL SE 54.0
2.FL $5.6
Receiver A.2 1.FL sw $0.0
2.FL $2.7
Receiver A.3 1.FL NW 467
2.FL 52.0
Receiver A.3 1.FL sw $2.6
2.FL S44
Receiver A.3 1FL NE $9.5
2.FL 60.7
Receiver A.3 1FL SE $9.3
2.FL 60.3
Receiver 8.1 1FL sw $9.6
2.FL 61.3
Receiver B.1 1FL NW 542
2.FL $7.0
Receiver B.1 1.FL SE 647
2.FL 65.8
Receiver B.1 1.FL NE 63.3
2.FL 64.4
Receiver B.2 1.FL SE 64.0
2.FL 65.2
Receiver B.2 1.FL sw $9.2
2.FL 60.9
Receiver B.2 1.FL NE 60.3
2.FL 61.8
Receiver B.2 1.FL NW $2.5
2.FL 55.9
Receiver C GF NW 46.8
1.FL $1.1
2.FL 54.6
TTM Consulting Pty Ltd '

 

 

 

 

 

SoundPLAN 8

ville 59

Site: Eenie Creek Road, Noos

 

Reference: 22BRA0078 RO1_4

Page 61

ttm

 

Noosa Civic Expansion, Eenie Creek Road, Noosaville 2
Assessed receiver levels
"Walter Hasye Drive RTN - Prediction.sit" "RDGM0001.dgm"

 

 

 

 

 

Receiver Fl Dir L10(18h)-NMW
dB(A)
Receiver C GF SE 61.8
1.FL 64.1
2.FL 65.2
Receiver C GF NW 479
1.FL 50.4
2.FL 54.2
Receiver C GF NE 574
1.FL 59.4
2.FL 61.0
Receiver C GF sw 59.9
1.FL 62.1
2.FL 63.4
Receiver C GF SE 60.9
1.FL 63.7
2.FL 64.9
Receiver D 1.FL NW 477
2.FL $2.2
Receiver D 1.FL NW 46.6
2.FL $2.1
Receiver D 1.FL SE 57.8
2.FL 58.8
Receiver D GF SE 55.8
Receiver D GF Sw 56.3
1.FL 58.5
2.FL 59.8
Receiver D 1.FL SE 56.0
2.FL 56.9
Receiver D 1.FL Sw 49.0
2.FL $3.3
Receiver D 2.FL NW 52.6
Receiver D 1.FL NE 55.0
2.FL 56.3

 

 

 

 

 

 

TTM Consulting Pty Ltd

 

 

 

 

 

SoundPLAN 8.

  

aville 60

Reference: 22BRA0078 RO1_4

Site: Eenie Creek Road, Noos

Page 62

ttm

 

Noosa Civic Expansion, Eenie Creek Road, Noosaville
Assessed receiver levels
"Walter Hasye Drive RTN - Verification.sit"

 

 

Receiver

110(18h)-NMW

dB(A)

 

Noise Logger [74.5 dB(A)]

 

74.7

 

 

 

 

TTM Consulting Pty Ltd

 

 

 

 

SoundPLAN 8.0

Site: Eenie Creek Road, Noosaville

 

Reference: 22BRA0078 RO1_4

61

Page 63

QDC MP4.4 Schedules 1 and 2

m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Schedule 1
Tinto grce) a a
" z ferrreeu art alse A
Noise category B eek ah Ls Ce ee eRe et cad

Glazing 43
External walls 52

Category 4 40 Roof 45
Floors 51
Entry doors 35

38
(where total area of glazing for a habitable room is
Glazing greater than 1.8m2)
35
(where total area of glazing for a habitable room is less
than or equal to 1.8m2)

Category 3 35 External walls 47
Roof a
Floors 45
Entry doors 33

Version 1.1 Page 7 Publication Date: 17 August 2015

Pe ea

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

. ns a Cee ate DT)
Nese at erent eee ho :
abl a Cee yey ech e s
35
(where total area of glazing for a habitable room is greater
than 1.8m2)
Glazing
32
(where total area of glazing for a habitable room is less than
or equal to 1.8m?)
aero 2 a External walls 4
Roof 38
Floors 45
Entry doors 33
a
(where total area of glazing for a habitable room is greater
than 1.8m?)
Glazing or
(where total area of glazing for a habitable room is less than
or equal to 1.8m?)
Category 1 25
bat ~ External walls 35
Roof 35
Entry Doors 28
Category 0 No additional acoustic treatment required — standard building assessment provisions apply.
Version 1.1 Page 8 Publication Date: 17 August 2015

 

62

Page 64

Schedule 2

ail

Erie
Cr ed

 

 

A ace

ree Be eames a oy

Double glazing consisting of two panes of minimum 5mm thick glass with at least 100mm air gap and full

 

 

 

 

 

 

 

 

 

 

43 perimeter acoustically rated seals
Minimum 14.38mm thick laminated glass, with full perimeter acoustically rated seals;

= OR
Double glazing consisting of one pane of minimum 5mm thick glass and one pane of minimum 6mm thick
glass with at least 44mm air gap, and full perimeter acoustically rated seals

Glazing 35 Minimum 10.38mm thick laminated glass, with full perimeter acoustically rated seals.

32 Minimum 6.38mm thick laminated glass with full perimeter acoustically rated seals.

27 Minimum 4mm thick glass with full perimeter acoustically rated seals

24 Minimum 4mm thick glass with standard weather seals

Version 11 Pages Publication Date. 17 August 2015

Ua
Erle
ed

 

External walls

 

TT Tg

eee une

 

 

52 Two leaves of clay brick masonry, at least 270mm in total, with subfloor vents fitted with noise attenuators
Two leaves of clay brick masonry at least 110mm thick with
() cavity not less than 50mm between leaves; and
(i) 50mm thick mineral insulation or 50mm thick glass wool insulation with a density of 11kgim? or
50mm thick polyester insulation with a density of 20kg/m? in the cavity
oR
Two leaves of clay brick masonry at last 110mm thick with
(i) cavity not less than 50mm between leaves; and
(i) atleast 13mm thick cement render on each face
a7 cle
Single leaf of clay brick masonry at least 110mm thick with
(i) a row of at least 70mm x 35mm timber studs or 64mm steel studs at 600mm centres, spaced at
least 20mm from the masonry wall; and
(i) Mineral insulation or glass wool insulation at least 50mm thick with a density of at least 11 kg/m?

 

positioned between studs; and
(iii) One layer of plasterboard at least 13mm thick fixed to outside face of studs.

OR

Single leaf of minimum 150mm thick masonry of hollow, dense concrete blocks, with mortar joints laid to
prevent moisture bridging

 

 

 

Version 1.1

 

Page 10 Publication Date: 17 August 2015

m

63

Page 65

ect

Ere
Crd

 

 

 

oe

a

 

De Ree eee Co)

Two leaves of clay brick masonry at least 110mm thick with cavity not less than 50mm between leaves

OR
Single leaf of clay brick masonry at last 110mm thick with:
(i) a rowof at least 70mm x 35mm timber studs or 64mm steel studs at 600mm centres, spaced at
least 20mm from the masonry wall; and
(i) mineral insulation or glass wool insulation at least 50mm thick with a density of at least 11 kg/m?

positioned between studs; and
(ii) One layer of plasterboard at least 10mm thick fixed to outside face of studs

OR

Single leaf of brick masonry at least 110mm thick with at least 13mm thick render on each face
OR

Concrete brickwork at least 110mm thick

OR

In-situ concrete at least 100mm thick

OR

Precast concrete at least 100mm thick and without joints.

 

 

 

Version 1.1

ed

Co
Oe Cd

 

TTT

Page 11 Publication Date: 17 August 2015

ee een)

Single leaf of clay brick masonry at least 110mm thick with
(i) arowof at least 70mm x 35mm timber studs or 64mm steel studs at 600mm centres, spaced at
least 20mm from the masonry wall; and

 

 

 

 

 

 

 

 

 

(i) One layer of plasterboard at least 10mm thick fixed to outside face of studs

35
OR
Minimum 6mm thick fibre cement sheeting or weatherboards or plank cladding externally, minimum 90mm
deep timber stud or 92mm metal stud, standard plasterboard at least 13mm thick internally
Concrete or terracotta tile or sheet metal roof with sarking, acoustically rated plasterboard ceiling at least
13mm thick fixed to ceiling joists, cellulose fibre insulation at least 100mm thick with a density of at least
45kg/m? in the cavity.

45 OB
Concrete or terracotta tile or sheet metal roof with sarking, 2 layers of acoustically rated plasterboard at
least 16mm thick fixed to ceiling joists, glass wool insulation at least 50mm thick with a density of at least
11kgim? or polyester insulation at least 50mm thick with a density of at least 20kg/m? in the cavity.

Roof Concrete or terracotta tile or metal sheet roof with sarking, plasterboard ceiling at least 10mm thick fixed to
ceiling joists, glass wool insulation at least 50mm thick with a density of at least 11kg/m? or polyester
insulation at least 50mm thick with a density of at least 20kg/m? in the cavity

41
OR
Concrete suspended slab at least 100mm thick
Concrete or terracotta tile or metal sheet roof with sarking, plasterboard ceiling at least 10mm thick fixed to
38 ceiling cavity, mineral insulation or glass wool insulation at least 50mm thick with a density of at least 11
kg/m?
Version 1.1 Page 12 Publication Date: 17 August 2015

 

m

64

Page 66

m

ual
Cou SO ee Cunt a)

ed

 

 

- Concrete or terracotta tile or metal sheet roof with sarking, plasterboard ceiling at least 10mm thick fixed to
ceiling cavity.
51 Concrete slab at least 150mm thick

 

Concrete slab at least 100mm thick
OR

Tongued and grooved boards at least 19mm thick with:

(i) timber joists not less than 175mm x 50mm; and

Floors is (ii) mineral insulation or glass wool insulation at least 75mm thick with a density of at least 11kg/m?

positioned between joists and laid on plasterboard at least 10mm thick fixed to underside of joists;

and

(ii) mineral insulation or glass wool insulation at least 25mm thick with a density of at least 11kg/m? laid
over entire floor, including tops of joists before flooring is laid; and

(iv) secured to battens at least 75mm x 50mm; and

(v) the assembled flooring laid over the joists, but not fixed to them, with battens lying between the
joists.

 

35 Solid core timber not less than 45mm thick, fixed so as to overlap the frame or rebate of the frame by not
less than 10mm, with full perimeter acoustically rated seals.

 

Fixed so as to overlap the frame or rebate of the frame by not less than 10mm, fitted with full perimeter

 

 

 

 

 

 

Entry Doors acoustically rated seals and constructed of -
33
(i) solid core, wood, particleboard or blockboard not less than 45mm thick; and/or
(il)_ acoustically laminated glass not less than 10 38mm thick
Version 1-1 Page 13 Publication Date. 17 August 2015

eed
Ce DT Re een ata)

Oe Cd

 

Fixed so as to overlap the frame or rebate of the frame, constructed of -
(i) Wood, particleboard or blockboard not less than 33mm thick; or
28 (ji) Compressed fibre reinforced sheeting not less than 9mm thick; or
(iii) Other suitable material with a mass per unit area not less than 24.4kg/m2; or

(iv) Solid core timber door not less than 35mm thick fitted with full perimeter acoustically rated seals.

 

 

Version 1.1 Page 14 Publication Date: 17 August 2015,

65

 

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Environmental Noise Assessment.pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.