Original source · versioned page text
141017 Doonella Stage C OP4 - Landscape Plans_Part2
Attached to the e-mail OPW14/0197 - Amended Plans for Approval - Landscape Plans Part 2 (Email 3 of 5).
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn E
Plotted by: Sloots, Ebony 10/17/2014 11:34 AM
ADJOINS DWG L-202
PATH P1 BY CIVIL
PA
TE2
P1
E
E LVL 1, 29 THE ESPLANADE T +61 7 5479 4405
TE2
TE2 TE2 TURF MAROOCHYDORE QLD 4552 F+617 5479 1832
TE2
PA
TE
2 AUSTRALIA
01 FIXED TIMBER BOLLARD TURF
B1
REFER DETAIL TE
TE2 2 [email protected] www.aecom.com
B1 TE2
TE
2
TE
TE
TE
2
2
PA
E TE CLIENT
05 TREE PLANTING IN GARDEN BED TE2
TURF
TE
REFER DETAIL
2
TE
TE
E 2
PA
E
TE
E
TE
02/04 STREET TREE WITH FOOTPATH
TE
REFER DETAIL
E
E
TE2
PA ALL FOOTPATHS, DRIVEWAYS AND
ROADS BY CIVIL CONTRACTOR. REFER
LANDSCAPE SPECIFICATION FOR FINISH
TE2
TE2
E
E
TURF PA
TE KEY PLAN - NOT TO SCALE
2 TE2 TE2
TE2 TE2
TURF
E
E
E
E
E
E
E
ADJOINS DWG L-204
E
NORTH POINT / SCALE
N
E
E
E
0 2 4 6 8 10 12 14 16 18 20m
1:200 (Original Sheet Size: A1)
Verify all dimensions on site prior to construction. Do not scale from drawing.
All dimensions in millimetres unless otherwise stated.
01 FIXED TIMBER BOLLARD
REFER DETAIL
DRIVEWAYS BY CIVIL
05 TREE PLANTING IN GARDEN BED
REFER DETAIL
PATH P1 BY CIVIL
S
OP4 RFI RESPONSE 17.10.14 JL
TURF
K
OP3 RFI RESPONSE 25.06.14 JL
OR
P1 TURF OP2 OPERATIONAL WORKS 23.04.14 WW
FW
OP1 OPERATIONAL WORKS 17.03.14 JL
TE
E
TE
TE2 TURF ISSUE DESCRIPTION DATE CHECK
TE2 PA
CAD Ref: \\aumcy1fp001\Data\Projects\Projects\60314304\5. CADD\5.3 Working\5.3.1Sheets\Stage C\L-4304-STAGE C-203
TO
B1 TE2 P1
TURF
B1 TE
2 PA
TE
TEN
SC KK JL 17.10.2014
TE2
TE2
TE
TE2 2 TE
DESIGN DRAWN CHECK DATE
EX
TE2 02/04 STREET TREE WITH FOOTPATH
TE2
TE2
TE REFER DETAIL
PA
TE2
PROJECT NUMBER
TURF TE
ALL FOOTPATHS, DRIVEWAYS AND
6031 4304.01
TE
ROADS BY CIVIL CONTRACTOR. REFER PROJECT
TE
LANDSCAPE SPECIFICATION FOR FINISH
DOONELLA
E
TURF
E
P1
TE2
STAGE C
TE
TE
TE
TURF DRAWING TITLE
TE2
TE
PA
SURFACE FINISHES
E
TE2
TURF
E E
PA
TE
2
TE TE2
TE2
TE
TE2
TE2
TURF
E
E
TE2
TE PA STATUS DRAWING ISSUE
E 2
ADJOINS DWG L-205 ADJOINS DWG
E
L-206 TE2
TE2
OPERATIONAL WORKS L-4304-STAGE C-203 OP4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.