Our Ref: 20210414
Council Ref: RAL21/0029


9 March 2022

         Noosa Council
         PO Box 141
         Tewantin QLD 4565
         Via email: [email protected]

         Attention: Lisa Pienaar


Dear Lisa,

INFORMATION    RESPONSE    -   DEVELOPMENT APPLICATION FOR
RECONFIGURATION OF A LOT (1 LOT INTO 2 LOTS) AT 15 JIRRIMA
CRESCENT, COOROIBAH (LOT 43 ON RP136461)

Further to Council’s Information Request issued on 15 December 2021, we now respond in full to each of
the items raised.

In support of this application please find enclosed:

    ●    Ecological Assessment Report prepared by Red Sand;
    ●    Amended Proposal Plan prepared by CadCon;
    ●    Amended On-Site Effluent Report prepared by Australian Soil Investigations;
    ●    Amended Landscape Plans prepared by Anembo Consultants;
    ●    Amended Bushfire Risk Assessment and Bushfire Risk Management Plan prepared by Ecological
         Natural Area Management.

Please find below the response to each of the items raised by Council:

Item 1

Provide an Ecological Assessment Report that references the Landscape Plan.

Response: Please refer to the attached Ecological Assessment Report prepared by Red Sand, which
reflects the Landscape Plans prepared by Anembo Consultants. Refer to the report for further details.

Item 2

Provide detailed information within the Ecological Assessment Report and Landscape Plan
on the Existing Vegetation Outside of Riparian Zone and the vegetation management that is
proposed within those zones.
Log in to download the original file

Information Response (1).pdf · 185 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 pages

Page 2

Response: Please refer to the amended Landscape Plans prepared by Anembo Consultants. Plans LD2
and LD3 include detailed information on the existing vegetation outside of the riparian zone and the
vegetation management proposed within those zones.

Item 3

Update all documentation to include the two Riparian Buffer Zone areas as a Vegetation
Protection Covenant.

Response: The Proposal Plan has been amended by CadCon to include a Vegetation Protection Covenant
over the mapped Riparian Buffer Zones. All documentation has been updated as a result.

Item 4

Provide details on why dog mesh was selected to be used as the fencing type. Update plans
and detail to utilise 3 strand wire (no barb) with bottom wire being a minimum of 300mm
from ground level.

Response: The Landscape Plans prepared by Anembo Consultants have been amended to include fauna
friendly fencing (3 strand wire (no barb), with bottom wire being a minimum of 300mm from ground
level).

Item 5

Correct Landscape Plan sheet 4 to Existing Forest Management Area 4.

Response: The Landscape Plans prepared by Anembo Consultants have been amended accordingly.

Item 6

Update Landscape Plan sheet 4 to include the 5 offset trees pot size as being 45 Litre pot
size.

Response: The Landscape Plans prepared by Anembo Consultants have been amended to include the
five offset tree pot sizes as being 45L pot size.

Item 7

Ensure the plant spacing for zone 1, 2, 3 for trees is a minimum of 5m and groundcover 1m
or less. Update Landscape Plan sheet 4 to include spacing distances.

Response: The Landscape Plans prepared by Anembo Consultants have been amended accordingly.

Item 8

Update the Landscape Plan to (or provide justification):
   - Replace Melaleuca linarifolia (Snow in summer) to species such as Melaleuca salicina
      (Willow Bottlebrush).
   - Replace Imperata cylindrical with Lomandra hystrix.
   - Replace Casuarina glauca with Glochidion ferdinandi and G sumatranum.
   - Replace Callistemon salignus (new name is Melaleuca salicina) with Lophostemon
      suaveolens.




                                                                                                  2

Page 3

Response: The Landscape Plans prepared by Anembo Consultants have been amended as per the above
recommendations.

Item 9

Update the Landscape Plan issue B 13/10/2021, sheet 2 to include reference to the
requirement to obtain a report by a qualified person identifying what tree maintenance
measures are required and utilise a qualified person to conduct the works.

Response: The Specification Notes within the Landscape Plans prepared by Anembo Consultants have
been amended to include reference to the requirement to obtain a report by a qualified person identifying
what tree maintenance measures are required and utilise a qualified person to conduct the works.

We thank Council on behalf of the applicant for assessing the attached additional application material.

Based on the information provided in this application we respectfully request that Council proceed to
issue an approval.

Should you have any questions with respect to the above, please do not hesitate to contact me directly.

Yours faithfully,
Adapt Development Management Pty Ltd




 Tiani Boulton
 Director
 E: [email protected]
 M: 0404924160
 A: PO Box 7618 Sippy Downs QLD 4556
 W: adaptplanning.com.au




                                                                                                          3

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.