Information Response (1)
Response: The Landscape Plans prepared by Anembo Consultants have been amended as per the above
recommendations.
Item 9
Update the Landscape Plan issue B 13/10/2021, sheet 2 to include reference to the
requirement to obtain a report by a qualified person identifying what tree maintenance
measures are required and utilise a qualified person to conduct the works.
Response: The Specification Notes within the Landscape Plans prepared by Anembo Consultants have
been amended to include reference to the requirement to obtain a report by a qualified person identifying
what tree maintenance measures are required and utilise a qualified person to conduct the works.
We thank Council on behalf of the applicant for assessing the attached additional application material.
Based on the information provided in this application we respectfully request that Council proceed to
issue an approval.
Should you have any questions with respect to the above, please do not hesitate to contact me directly.
Yours faithfully,
Adapt Development Management Pty Ltd
Tiani Boulton
Director
E: [email protected]
M: 0404924160
A: PO Box 7618 Sippy Downs QLD 4556
W: adaptplanning.com.au
3