SCG) consultingenaineers

\

WORKING FOR YOUR PROJECTS SUCCESS

SOIL TEST AND FOOTING REPORT

Address : 5 Stevens Street

Sunshine Beach
Client : Steve Pilcher
Date : 21 January 2014
Report No : 23360(S)

P 07 5455 5604

f 075455 5696

@ [email protected]

www.scg-engineers.com

po box 1661 noosa heads qld 4567

unit 1/11 project ave noosaville qid 4566 STRUCTURAL © CIVIL * GEOTECHNICAL

Debuild Pty Ltd Tradingas = ABN 40098 481 899
Full text of the other 21 pages

Page 2

1 INTRODUCTION

SCG Consulting Engineers has performed a site classification in accordance with AS 2870-2011 and made
recommendations based upon the classification for a building to be constructed at the above site. This
report does not include an assessment of Slope Stability, Landslide Risk, or specifications for damp proofing,

termite protection or moisture barriers.

This soil test and footing report relates only to the above property and the proposed construction as
described below:

 

 

 

 

 

 

 

 

 

 

Proposed Construction Residential Units
External Walls Timber/Block
Internal Walls Timber
Ground Floor Slab on Ground

Upper Floor Suspended Slab
Building Platform Cut Fill Pad
Masonry Articulation Required @ 8 m centres

 

 

 

This report must be read and considered as a whole. All of our recommendations,
foundation plans, sections and appendices must be read, considered and followed by all
people involved in this project including the client to ensure adequate long term
performance of the footing system constructed on this site. A copy of this report must
remain with the client or final owner of the building upon completion of the
proposed works. If you are unsure of any of the requirements herein, you must seek
clarification from this office.

2 SITE CLASSIFICATION

After considering the results of our field investigation performed on 19/12/2013 we have classified this site in

accordance with AS 2870-2011 as:
[Class P_|

The classification has been calculated from test work performed on the soil profile encountered on the day of
our fieldwork and consideration of AS2870-2011. Any disturbance of the soil profile may result in a change
to the classification.

The ‘P’ classification relates to the loose sands and poor bearing capacity encountered during our testing on
site. Please refer to our definitions fist appended to this report for further descriptions of these
characteristics.

 

With respect to potential surface movements through seasonal moisture variations, the site could be
considered equivalent to a class S site.

The site preparation details that follow have allowed for the influence of the earthworks described in section
5.0 below.

Site Classification: The site classification is calculated in accordance with the “AS2870-2011 Residential
Slabs and Footings-Construction” and relates to the estimation of Ys, “The characteristic surface movement”
within reactive soil profiles. The limits used for this classification are as follows:

 

 

 

 

 

 

 

 

[ Predicted Surface Movement__| Classification |
Ys = <=20mm $s Slight
Ys = >20- 40mm M Moderate
Ys = >40 - 60mm H1 High-1
Ys = 60 - 75mm H2 High-2
Ys = > 75mm E Extreme
Problem sites P Problem

 

 

 

 

scG Consulting Engineers 1 SCG Ref: 23360(S)

Page 3

3 SITE DESCRIPTION

The construction area has a gradient in the order of 7%.

Vegetation on the construction area (and nearby surrounds) consists of grasses and scattered tall trees.
The trees are located on and adjacent the proposed construction site.

The existing surface drainage is good and sub-surface drainage is good.

4 FINDINGS
The soil profiles encountered are shown on the attached borelog sections.
No water table was encountered during our testing program.

The sandy soils encountered are susceptible to collapse when unconfined. This may effect excavations and
result in additional earthworks and increased concrete volumes. Temporary shoring or Forma-Tube may be
required to retain the sands prior to concreting.

The samples classified on-site were assessed as having negligible plasticity, therefore laboratory testing was
considered unnecessary.

We have assessed the expected differential movement of the soil profiles encountered to be the equivalent
of a site with a Ys of less than 20mm.

The following foundation material will provide a safe bearing capacity (100 kPa) for buildings within the scope
of AS 2870-2011 and is shown shaded on the attached logs;

FOUNDATION MATERIAL - NATURAL MEDIUM DENSE SILTY SANDS

5 SITE PREPARATION DETAILS

We recommend scraping this site free of all organic material and debris. The proposed construction area
should then be levelled suitable for the construction of a block base. The base must be fill, clean granular
material (i.e. crusher dust, clean sand, deco-rock or road base) and be free of any organic material and have
a clay content of less than 15% (Plasticity Index less than 25%). The fill is to be wetted and compacted in
150mm layers with a vibrating plate making 6 passes (3 in each direction). _In the area of the fill, the floor
slab and any services must be fully suspended on piers.

 

 

Where a retaining wall is required, a cut batter of 1 to 2 (vertical to horizontal) in the sand profile taken from
the base of the proposed wall should be excavated. These earthworks must incorporate shallow surface
spoon drains at the base and along the high side of the cut. Drains must have an efficient outflow down-
slope and clear of the construction area. The exposed face shouid aiso be protected against the potential for
stormwater erosion. Should these recommendations be un-achievable the builder should seek guidance
from this office on temporary shoring, benching or other suitable techniques. Backpropping to retaining walls
should be provided throughout the backfilling and compaction process.

Areas where existing structures or trees are removed shall be backfilled with engineer approved fill material
compacted to achieve a minimum relative field density of 95% and be in accordance with AS2870-2011.
Where trees are removed prior to construction the moisture conditions of the soils must be allowed to
normalise across the site prior to commencing foundation preparations.

Any loose or soft material uncovered in the site preparation shall be removed and replaced with approved fill

material compacted in accordance with AS2870-2011, or alternative measures to be provided by the
engineer.

scG Consulting Engineers 2 SCG Ref: 23360(S)

Page 4

We recommend using a footing system as per the attached plans and details on the prepared construction
pad.

   

For the design to be valid the cut/fill ine must be in the position shown on our footing pian. Any variation
must be brought to the attention of this office before continuing work.

Site drainage during construction is important. Stormwater run-off should be diverted away from any
foundation excavations and not be able to pond within 5.0m of the building footprint. Temporary piping or
spoon drains or other practical methods should be used. Please refer to the Appendices to the rear of this
report for drainage management.

  

The final surface profile should fall away from any slab on ground for a minimum of 1.5m at a grade of no
less than 1 in 20. Refer to appendices for drainage recommendations.

Where site drainage and landscaping does not conform to the specifications of AS 2870-2011 and CSIRO
Information Service Sheet BTF-18 significant damage to the building can be expected. A single copy of this
document is issued with the original issue of this report. Please consult your builder or contact this office to
obtain a copy.

 

The builder must ensure the stability of neighbouring/existing structures is maintained through not
undermining their foundations. This is achieved via restricting any excavations to above a line
radiating downwards at an angle of 1 in 1.5 (vertical to horizontal) from the base of the
foundation/structure to be protected.

Any new vegetation including trees planted adjacent the structure should follow the recommendations
appended to this report.

6 FOOTING AND SLAB SPECIFICATIONS
Footing Details

All footings must be founded a minimum of 300mm into the NATURAL MEDIUM DENSE SILTY SANDS (shown
shaded on the attached log sections). Dimensions and reinforcement requirements are detailed on the
structural plans and details.

Where the NATURAL MEDIUM DENSE SILTY SANDS is deep or is covered by the introduction of fill, the footings
are to be increased in depth to reach this level. Alternatively the footings can be supported on piers founded
at or below the founding level. Refer to the structural plans for details.

 

Where unexcavatable rock is encountered at depths shallower than the founding level, the strip footing (non-
retaining) depth may be reduced accordingly to a minimum of 150mm providing the footing is founded a
minimum of 100mm into un-weathered or un-disturbed rock. Additional reinforcement shall be provided in
the footing at the rock/soil interface. Please contact SCG Consulting Engineers to obtain an appropriate
detail.

Drilled Piers Supporting the Footings

Where the NATURAL MEDIUM DENSE SILTY SANDS is deep or to be covered by fill the footings can be
supported on drilled concrete filled piers founded at a minimum of 300mm into the NATURAL MEDIUM DENSE
SILTY SANDS. The size and spacing of these piers is nominated on the structural plans.

Where drilling piers is not practical the footings could be supported on steel screw piers.

Where unexcavatable rock is encountered at depths shallower the founding level the piers shall be augered
a minimum of 100mm into un-weathered or un-disturbed rock.

SCG Consulting Engineers 3 SCG Ref: 23360(S)

Page 5

Floor Slab Details
The thickness and reinforcement for slabs on ground are shown on the structural plans.

Ground slabs may require thickenings or stiffening beams incorporated in their construction. It may be
advantageous to excavate them at the same time as the perimeter footings. Refer to the structural plans for
the locations and extent of these.

Where the stiffening beams intersect a perimeter footing, their base must be graded down to the footing
base level, 3 x N12 bars must be cogged into the footing and lapped 500 with the beams trench mesh.
Refer to the structural plans for details.

A levelling layer under the ground floor slab is to comprise of granular material such as clean sand or
crusher dust compacted in 150mm layers. Either well graded sand or crusher dust can be used.

An approved polyethylene damp proof membrane of 0.2mm (min) thickness is to be placed over the levelling
layer. Laps are to be a minimum of 200mm and be taped. All service penetrations and punctures are to be
fully taped. The membrane is to be extended down the inside face of the perimeter footings and must
continue under any thickenings or stiffening beams.

Where rock is encountered within the slab area and encroaches within the slab depth it should be excavated
to a level which enables placement of a 100mm (min) layer of granular material under the slab.

Drilled Piers Supporting the Slab
Slab piers are required where there is more than 300mm of uncontrolled fill beneath the slab. They are to be
founded at a minimum of 300mm into the NATURAL MEDIUM DENSE SILTY SANDS. Special attention must be

paid to the extra slab thickening required over slab piers as detailed in the structural plans.

Where unexcavatable rock is encountered at depths shallower the founding level the piers shall be augered
a minimum of 100mm into un-weathered or un-disturbed rock.

Where drilled piers supporting columns or posts are not poured with the slab they must be connected to the
slab in the following manner:

e 4-N12 bars must be anchored 500mm into the drilled pier and be bent 300mm horizontally into the
footing or slab as required.

e Where a column penetrates a beam or footing 3-N12 bars must be bent around the column to lap the
trench mesh by 500mm both sides.

Drilled Pier Reinforcement

 

 

 

 

 

 

[ Pier Depth mm | PerimeterPiers | SlabPiers |
up to 1500 None required none required
1500-2500 2xN12bars none required
2500-4000 4xN12bars 2xN12bars
4000-6000 6xN12 bars 4xN12bars

 

 

 

 

 

Pad Footing Details

All pad footings must be founded to the depth nominated on the structural plans. Where this depth is not
300mm into the NATURAL MEDIUM DENSE SILTY SANDS they must be deepened down to this level.

SCG Consulting Engineers 4 SCG Ref: 23360(S)

Page 6

NOTE: The information contained herein has been compiled following our field and laboratory
testing, accepted engineering theory and discussions with and information supplied by our
client, whom is noted on the header page of this report. We offer no warranty for the use of
this report by other parties without prior written consent from this office.

The report must be read in conjunction with the attached appendices. If you do not havea
copyfof these please contact our office and a copy can be issued to you.

 

for and on behalf
SCG CONSULTING ENGINEERS

SCG Consulting Engineers 5 SCG Ref: _23360(S)

Page 7

SCG CONSULTING ENGINEERS LOG SECTIONS Ref No. 23360

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Depth TEST SITE No 1 P | Depth TEST SITE No 2 P
100 Silty Sand SM 2 100 Silty Sand SM 4
200 Fine grained, pale grey 4 200 Fine grained, pale grey 1
300 Roots, moist, loose. 1 300 Roots, moist, loose. 1
400 zZ 400 1
500 2 500 1
600 4 600 1
700 | ee 4 TOO | A
800 Silty Sand SM 1 800 Silty Sand SM 1
900 Fine grained , pale grey 1 900 Fine grained , pale grey 1
1000 (White), moist, loose. fl 1000 (White), moist, loose. Al
1100 1 1100 1
1200 1 1200 2
41300 2 | 1300 2
1400 2 | 1400 3
1500 3 | 1500 3
1600 3 | 1600 3
1700 3 | 1700 3
1800 3 | 1800 3
1900 3 | 1900 3
2000 3 | 2000 3
2100 2100

2200 2200

2300 2300

2400 2400

2500 2500

2600 2600

2700 2700

2800 2800

2900 2900

3000 3000

3100 3100

 

 

 

 

 

 

 

Depth = mm below ground level.
P = blows per 100mm penetration with an approved 9kg penetrometer.

Notation such as (SP) refers to the soil description to Table A1 AS1726 ‘Guide to the description
identification and classification of soils’.

Solid lines represent sharp interface between different soil types. Dotted lines represent
gradation form one soil type to another.

Abbreviations used
UTP - unable to penetrate, Bec. — becoming, N.S.L. — Natural Surface Level

 

Med. — medium, MW - Moderately weathered
EW - extremely weathered, Plast. - Plasticity

No recovery means unable to extract samples from the base of the bore hole because the soil
will not bind in the auger head.

The colour of the soil is often abbreviated, for example Gy = grey Or = orange.
(Ls=?.?%) Indicates sample location and Linear Shrinkage result.

The footings must be dug into or supported on piers dug into the shaded material.

 

 

 

Page 8

a tl FLOR «

a amp

 

2 ==

 

 

 

 

 

4

7 ba

Page 9

 

 

Revision | Description Date

 

 

 

 

 

 

 

CI
WF

Property Boundary

 

 

 

 

 

 

 

 

 

 

 

 

 

Py
er 2
5 =
= | lg
3 Existing 2S
= | House | s
DS =
Ss a
a
BH 1
| % oy
STEVENS STREET
SITE PLAN
Site Drainage Good. (Property Boundaries are diagramatic only)
/S CONSULTING _ ENGINEERS
Vegetati R
—— Grasses SG structural’ - chil - geotechnical S
ABN 40 098 481 899 =
BH2 ;
@ Borehole location. Unit 1/11 Project Ave, Noosaville
Ph (07) 5455 5604 Fax (07) 5455 5696

 

<q-7, Slope

0 . Title: SITE PLAN
measured as a percentage gradient from

 

high ground to low ground. Project 5 Stevens St

 

Sunshine Beach
DO NOT DIMENSION OFF THIS DIAGRAM. Date: Dec 2013] DrgNo. 23360—S|.

Rex. - 30.01 05

 

 

 

 

 

Page 10

Page 11

APPENDICES

 

DEFINITIONS
LIMITATIONS

CONSTRUCTION NOTES

59 9 BD >

RECOMMENDATIONS
D.1- Builders

D.2- Owners

D.3- Builder/Owner - Trees

E DETAIL SHEETS
E.1 - Plumbing Requirements Class M, H1, H2 & E Sites
E.2 - Site Drainage recommendations

F. SITE PLAN

G; BORELOGS

Page 12

A. DEFINITIONS

Safe Bearing capacity: The soil nominated in this report as a suitable foundation material has an allowable bearing capacity of 100KPa
and is considered safe for the construction of a dwelling that is in accordance with AS2870-2011.

  

 

Clays and silt soils that have inherent cohesive (binding) strength.

Granular Soils: Gravels and sand soils that have no cohesive strength. Individual particles can flow under certain conditions.

 

Controlled Fill: Manually piaced soil which has been placed and compacted to achieve sufficient bearing capacity to support a structure
according to AS 2870-2011. Fill certified at Level 1 according to AS 3798 and 95% Relative Field Density is considered controlled

 

   

Partially Controlled: Manual
this report, no compaction cer'

placed soil which appears to have been compacted under controlled conditions but, at the time of preparing
icate suitable for compliance to Level 1 of AS 3798-2007 had been presented.

Uncontrolled Fill; Manually placed soil (overlying the natural soils) which is not adequate to support a normally loaded footing or floor slab
or structurai load.

Unexcavatable Rock: Strong material that does not soften in water or collapse under the combination of loading and wetting. Material that
cannot readily be excavated by a backhoe.

 

Exeavatable Rock: A rock-like material including shaly material and strongly cemented sand or gravel which does not shrink or swell with
changes in soil moisture, but is readily excavatable with a conventional backhoe.

Load Bearing Wall: In our design work a load bearing wall is defined as any wall imposing on the footing a service load greater than
40kN/m. A load bearing wall will normally be supported by a slab thickening or footing in our slab designs.

Natural (Strata): Refers to soil that is neither | or imported material but one that is in its original undisturbed state and position.
Gravel: Coarse particles, larger than sand size, but less than 60mm in diameter.
Cobbles: Rocks greater than 60mm in diameter but less than 600mm in diameter.

Boulders: Rocks larger than 600mm in diameter.

SOIL STRENGTH INDICATIONS

 

 

NON-COHESIVE (GRANULAR) SOILS COHESIVE SOILS
Loose ‘A 12mm rod/bar can be easily pushed in by hand Soft Can be moulded by light finger pressure.
Medium A 12mm rod/bar can be pushed in 300mm with Firm Can be moulded by strong finger pressure.
Dense difficulty
Dense A 12mm rode cannot be pushed in by hand. Stiff Cannot be moulded by fingers. Can be indented by

thumb with pressure.

 

Very Stiff Can be indented only by thumb ni

N.B. These indications should be used for guidance only. These indications can vary greatly under Abnormal Moisture Conditions.
Please contact SCG Consulting Engineers for on-site clarification of soil strengths.

B. LIMITATIONS

AS2870-2011: This report and associated foundation designs have been completed in accordance with AS2870-2011 the Australian
Standard for “Residential Slabs and Footings” design and construction. The standard provides performance based criteria for its design
recommendations. This criteria is not based upon crack or movement free performance. The code states acknowledged that minor
foundation movements occur on nearly all sites and that i impracticable to design a footing system that will protect the building from
movement under all circumstances”. The code provides guidance on the assessment of crack sizes in wails and floors and suggests
acceptable limits. Should the potential owner not be satisfied with this criteria we should be notified such that any associated design can be
amended to suit their requirements. However, it should be noted this could dramatically increase the construction costs.

 

 

 

 

 

Field Testing: Our investigation and the results and recommendations contained herein have been compiled following careful
consideration of our clients supplied information and instructions. Such considerations include the proposed structure to be supported and
its position, proposed earthworks and land use. Any variation to this information may render this report incorrect. Furthermore this report
must not be used by any person other than our client noted at the head of the report.

 
 

Client Supplied Information: In writing this report we have considered all the information supplied to us by the client. Should the client or
his agent have omitted to supply us with relevant information our report may be irrelevant and / or inappropriate. We do not accept
responsibility for the consequences in such cases.

 

Borelogs: The soil profiles reported in our Borelogs Section represent the soil conditions at our test sites and have been located were we
believe best represents the soils within the proposed building envelope. However soil conditions can change dramatically over short
distances, therefore such point type exploration programs may not locate ail variations. if site preparations/excavations revea! soil
conditions that are different from those shown in our Borelogs we must be no ed immediately. Changes to the site classification and/or
footing design may be necessary.

 

 

 

 

Site Information: The site information shown on the attached plans such as surface grades and levels are estimations taken during our
field testing and are provided for a rough guide. They must not be used for any design purposes. Site plan dimensions are as measured
from the noted visible site feature during our field testing.

   

Previous/Future Excavations: The recommendations contained in this report have not considered the effects of any previous, current or
future excavations, mines or slope instability problems that are not highlighted in the clients supplied information or, that was not clearly
visible during our field testing. If such features exist we must be advised so that our design can be adjusted to accommodate them.

SCG Consulting Engineers Appendix Page 2 of7 Appendices.1

Page 13

 

Trees: Trees can have a considerable effect over the over the performance of a structures foundation particular those founded on
reactive soils (Class S, M, H & E). Their pursuit for moisture will change the moisture characteristics of the surrounding soils leading to
localised shrinking and swelling which can exceed the expected soil movement. This can include trees that have been removed prior to
construction. During our Field-testing we have considered trees that existed on or adjacent the site and allowed for them in our
recommendations/design, We are unable to allow for the potential effects trees planted after our testing. reference should be made to
“Recommendations for Builders/Owners-Trees” in Appendix D that follows.

 

Moisture Conditions: The moisture conditions noted within this report are as recorded at the time of our field testing and have been
included in our assessment of the site. Changes to site drainage, the planting of trees or a rising water table can lead to increased levels of
moisture within the soils leading to either an increased classification or design requirements. We must be notified of any increase in
moisture conditions. Also refer to “Recommendations for Builders/Owners — Site Drainage in Appendix D that follows.

 
 

 

 

Aggressive/Contaminated Soils: This report does not consider the presence of contaminants or sulphates within the tested s as this is
beyond the scope of this report and our expertise. Engagement of a specialist consultant is advised if this form of assessment is required.

Landslip: This report does not address slope stability issues. A specialist report must be obtained to assess such hazards.

Shrinkage Cracking: Shrinkage cracking of concrete occurs as the initial moisture in the concrete evaporates from mix causing
shrinkage to occur. The cracking as a result of this shrinkage is not a sign of structural failure and is to be expected in most concrete
elements poured on-site. AS2870-2011 states “Shrinkage cracking can be expected in concrete floors”. Unless requested by our client we
do not design concrete floor slabs to be shrinkage crack free.

C. CONSTRUCTION NOTES
C.1. Generai

We strongly recommend footing excavations be inspected by a qualified person with appropriate experience to
confirm the FOUNDATION MATERIAL and proposed foundation depths are as nominated herein.

Similarly all preparations should be inspected prior to the pouring of concrete by a qualified person with
appropriate experience to confirm that the workmanship and construction conforms with the details and
recommendations contained herein and on associated documentation.

All building dimensions are to be obtained from the approved architectural plans.

All excavations must be totally free of all loose material and debris before pouring. They must be cleaned out so that the concrete is poured
onto undisturbed ground. Tamping and/or watering loose material is not acceptable.

Light watering of prepared surfaces is permitted prior to placing concrete.
Ail works must be approved by the regulatory authority prior to commencing.
C.2_ ‘Tiled Areas

In areas where ceramic floor tiles or brittle coverings alike are spe ied for ground floor slabs we recommend increasing the size of the slab
mesh by one grade. Use flexible adhesives when affixing tiles and delay the laying for as long as possible (at least 3 months, preferably 6
months) after the slab is poured.

 

 

 

C.3 Concrete

Conerete for footings shall not be less than N25 (25MPa) with 20mm Aggregate and maximum slump of 80mm. Footing concrete must be
vibrated. Concrete for floor slabs shall not be less than N25 (25MPa) with 20mm Aggregate and maximum 80mm slump. Concrete slabs
greater than 100mm thick must be vibrated. In no instance shall concrete be ‘wetted up’ on site during placement.

C.4 Reinforcement

Reinforcement is to comply with the following:

a) Concrete cover to the reinforcement must be 50mm from unprotected ground, 40mm to external exposure, 30mm to the membrane
in contact with the ground, and 30mm to the internal surface.

b) Slab fabric must be lapped by one full panel of fabric plus 25mm so that the two outermost transverse wires of one _— sheet overlap
two outermost iransverse wires of the sheet being lapped. Slab fabric is to he supported on bar chairs placed at 800mm centres.

b) Trench mesh must have all cross wires cut flush with the outer main wires. Trench mesh in slab and edge beams must be
overlapped by the width of the fabric at “T” & “L” intersections. Trench mesh must be spliced, where necessary, by a lap of 500mm.

d) Pre-Fabricated footing cages or reinforcing bars at “T” & “L” intersections are to have a N12 corner tie bars as per the attached
details.

e) The minimum lap length of reinforcing bar is to be 500mm or 40 bar diameters, whichever greater.

 

  
 

 

C.5 Masonry Articulation

The specifications in this report have been specifically formulated for articulated masonry construction. This usually results lower
construction costs. All masonry walls must have full height articulation at a spacing noted on the first page of this report The articulation
joint must separate the masonry from footing to eaves level at this spacing. Masonry must be supported on each side of the joint in an
approved manner to retain its structural integrity.

Where used, internal masonry wails should be articulated in accordance with the masonry manufacturers requirements for the width and
type of unit used. In no instance should the spacing exceed 4.0m and articulation should always be provided at an abutment with an
external wall.

 

If articulation of masonry is found to be unacceptabie, the footing system will require re-designing.

 

In addition to joints in masonry, articulation is achieved wherever a 10mm (min) separation in masonry from footings to eaves is achieved.

For example, where timber panels are used above and/or below doors and windows.

SCG Consulting Engineers Appendix Page 3 of 7 Appendices.1

Page 14

Where it is necessary to construct construction joints to meet the articulation requirements, they can be placed in places of limited visibi ity.
For example behind downpipes. Internal masonry walls should be articulated where they abut the perimeter walls.

The designer of the building must also ensure that articulation is established:
1. Adjacent to a change in floor level which exceeds 400 mm.

2. If any proposed extension abuts any existing structure, full height articulation must be established where the new masonry joins the
old.

3. Where a masonry wall transgresses from one footing type to another - eg from a perimeter footing to a continuous footing.
if the building has any masonry arches we must be contacted for further advice.

Methods of articulation are well documented in “Technical Note 61” by the Cement & Concrete Association.

D RECOMMENDATIONS

D.1 Recommendations for Builders

 

Codes of Practice: All construction work associated with this report must be undertaken in accordance with the BCA ‘part 3.1 = Site
Preparation” and “part 3.2 — Footings & Slabs” and AS2870-2011 “Residential Slabs and Footings”.

Underground Services/Plumbing: Where structures are built over filled, soft or loose soils, services will need to be supported so that
potential movement within the soils does not cause them damage or cause incorrect alignment which could cause leakage. Such measures
can include but are not limited to the provision of expansion joints, sleeved or foam lagged pipe penetrations throughout the structure or
treatment of the soils prior to construction. The attached illustrations detail minimum requirements.

 

Arrange plumbing fixtures so that the slab and beam penetrations are kept to a minimum and where necessary sleeved to allow for
movement with 40mm thick closed cell polythene or similar material. Where the penetration is within 150mm of the base of a beam or
footing, the depth of this footing element should be deepened by approximately twice the diameter of the penetration. All plumbing and
drainage must comply with the requirements of the National Plumbing and Drainage Code AS3500.

 

 

For Class H & E sites, AS2870 - 2011 requires that plumbing pipes servicing dw
joints, rotational swivel joints and foam lagged penetrations.

ings in class H & E sites be fitted with sleeved expansion

 

Refer to the attached detail sheet “Plumbing Requirements Ciass M, H and E sites.

Site Drainage - Class A Sites: The ground surrounding the dwelling and the building site must be graded and drained so that stormwater
is shed away from the house area in all directions during and after construction. Particular attention should be given to ail drainage so
stormwater is not introduced to the foundation soils leading to potential scour. Roof water must be diverted away from the bul ling prior to
and after the roof is installed. Correct drainage is an essential part of our recommendations and design. ff the site is not prepared correctly,
excessive foundation movements may occur leading to damage within the supported structure.

 

 

Site Drainage - Class S, M, H & E Sites: The ground surrounding the dwelling and the building site must be graded and drained so that
stormwater is shed away from the house area in all directions, during and after construction. A minimum grade of 1 : 20 (vertical :
horizontal) for 1.5m must be provided. Hard landscaping such as terrace slabs adjacent the dwelling can assist in this. Roof water must be
diverted away from the building site prior to and after the roof is installed. Where building delays occur, temporary downpipes may be
necessary. Constant maintenance of roof drainage is essential. If a rainwater tank (or similar) is to be sited within 6 meters of a structural
footing, we should be consulted for further advice. External water taps, air conditioner overflows, tank and hot water cylinder overflows
should be over grated pits connected to the drainage system. The ground surrounding the building must be graded and drained so water is
shed away from the house in all directions.

 

Particular care should be taken with drainage, plumbing and electrical trenches so that they do not introduce water to the foundation soil, do
not allow greater soil moisture evaporation and/or destabilise the footings by undermining them. The base of any trenches under the floor or
within 1.5 meters of the building should be sloped away from the house and should be backfilled with compacted clay plug.

Correct drainage is an essential part of our recommendations and design and is documented in the CSIRO handout BTF-18 attached to the
clients copy of this report. (Additional copies available upon request.) If the site is not prepared correctly, excessive soil moisture may
occur in some areas, which can lead to excessive foundation movements possibly damaging the supported structure.

 

Bracing for Wind Forces: Unless noted, we do not detail slab thickenings or pad footings to conform to wind bracing. Where a bracing
wall is to be bolted to a slab, 40mm bottom concrete cover attained for a radius of 150mm is required around the bolts unless noted by other
consultants.

inspections: We require 24 hours notice if you require engineers site inspections. Inspections can be booked between 8.30am and 4.30pm
Monday to Friday by telephoning 07 5455 5604.

Silt Retention: The builder is respon:
construction.

 

le for ensuring appropriate silt retention measures are in placed and maintained throughout

Site Classification: The site classification is calculated in accordance with the “AS2870-2011 - Residential Slabs and Footings-

 

 

 

 

 

 

 

 

Construction” and relates to the estimation of Ys, “The characteristic surface movement’ within reactive soil profiles. The limits used for this
classification are as follows:

Predicted Surface Movement Classification

Ys = <=20mm Ss Slight

Ys = >20 ~ 40mm M Moderate

Ys = >40 - 60mm H1 High-7

Ys = 60 - 75mm H2 High-2

Ys => 75mm [5 Extreme

Problem sites Pp Problem

 

 

 

 

SCG Consulting Engineers Appendix Page 4of7 Appendices.1

Page 15

 

D.2 Recommendations for Owners

 

Foundation Maintenance and Owners Responsibilities: The s surrounding and under the foundations must be protected from scour
or washout from stormwater by ensuring adequate drainage as noted above.

 

sisture such as overflows from hot water cylinders or air conditioners can lead to excessive localised

Visturs SUCN BS C' Suue ney

o
foundation movements and must also be adequately drained away from the foundations as noted above.

 

conditions, if an automatic watering system irrigates within 2.5 meters of a foundations, instability problems and excessive
age as discussed above must be maintained.

  

Ongoing foundation maintenance is documented in the CSIRO handout BTF-18, attached to the client's copy of this report. (Additional
ble upon request.)

 

Refer to the attached detail sheet “General Requirements for Site Drainage”

Additional Requirements - Class A & S Sites: Trees and dense shrubs must be kept well away from the duilding foundations. Refer to
the following section "Recommendations — B ders/Owners — Trees". In all types of soil conditions, if an automatic watering system gates
within 2.5 meters of a footing, instability problems may occur. Water should not be allowed to pond on the ground near the building.
Finished surface grades around the building should also ensure scour of soils cannot occur. Additional field gullies and drainage might be
required. in all instances the ground should be sloped away from the foundations at a grade of no less than 1 in 20 (vertical to horizontal)
for at least 1.5m.

Additional Requirements - Class M, H & E Sites: Trees and dense shrubs must be kept w
to the following section "Recommendations — Builders/Owners — Trees’.

 

 

away from the building foundations. Refer

The soil near the building should be protected against the increased moisture that occurs in gardens or permeable landscaping built
adjacent the foundations. Automatic irrigation systems must not be used adjacent structural foundations. If required, these forms of
landscaping must be constructed over impermeable membranes that drain the excessive moisture away from the foundations into correctly

installed field gullies and drains.

We strongly recommend the construction of hard landscaped paths or terrace slabs adjacent building foundations for at least a distance of
4.5m to protect the foundations from excessive moisture.

D.3. Recommendations — Builders/Owners - Trees

Trees and landscaped gardens can have a drama' influence over the moisture content of the soils they are grown in. This can lead to
increased soil movement through shrinking and swelling. Where these trees or gardens are within close proximity of structural foundations
the soil movements can affect the structural integrity of the foundations.

   

 

For Class M, H and E sites the following recommendations for the minimum distance between trees and footings should be followed:-

 

 

Site Class Offset to Tree
Class M ‘ 0.75xh
Class H 4 1.0 xh
Class E : 425. xh

Where ‘h’ is the mature height of the tree, further refinement of this recommendation can be pursued where tree species can be considered.
Where a row or group of trees exists the above recommendation should be doubled.

In some instances the installation of root barriers can lessen the effect of trees on foundation performance. Please contact SCG Consulting
Engineers for options.

The following table provides some guidance on mature tree heights:-
APPROXIMATE TREE HEIGHTS
40 to 20m Height — Acacias, Ash, Athel Tree, Candlebark, Manna Gum, Pepper Tree, Willows, Yate, Yellow Gum
20 to 30m Height — But-But, Cedars, English Oak, Lemon Gum, Palms, Planes, Sheoaks, Silky Oak, Spotted Gum, Casuarina

 

 

 

30 to 60m Height — Biue Gum, Cypress, English Elm, Figs, Karri, Pines, River Gum, Sugar Gum

 

The removal of trees from the proposed construction can also greatly affect the moisture conditions of the soil. We recommend allowing the
soil time to reach moisture equilibrium prior to construction commencing. Please contact our office for further guidance on this matter.

SCG Consulting Engineers Appendix Page 5 of 7 Appendices.1

 

Page 16

E DETAIL SHEETS
EH Plumbing Requirements Class M, H1, H2 & E Sites

 

SLAB PENETRATIONS IN TO SATS'Y. LEGEND

(BRUTE PROTECTION REQUREMENTS
(EPu) SELECTED N-UNE "EXPANDA’ JONT INSTMLED TO.
MAR ACTURERS SPECRICATIONS. STORWPLASIS 08
(ery To unDERS Aa PPE EQUALY APPROVED
nee (SWI) SSLECED w1-une she. JONT STL) 10
__ STs WAMEACTURERS SPEQAICANONS. STORMFLASTICS OR
SQUALY APPROVED

(CTP) —CONPACTED CLAY PLUMEMNG TRENCH PLUG 0 SToP
MOISTURE ENTERING UMDER THE HOUSE SAR

(SWL) | SSHER MAN Une
10. INSPECTION CPENING 10 SURFACE

         

LACGIG —-MINMLIN LAGGNG THOXHESS, 20mm FOR CLASS Wi
‘GTES AMO 4mm FOR CLASS H & E SITES

 

 

 

 

 

 

      

NIS.
Guidelines for Drainage Installations
FOOTNG PENETRATION mx
ONG ed 1g notes and details provided are a guide oniy for articulation for sanitary
ion with AS/NZ3S09, AS2870 and any

oR
REFER LEGEND, /
j a andard and other requirements of the 3.C.A.

   

  

movements may be recuired,
2, All sewer and stermvater to be constructed in accordance with AS,’
requirements of AS2870 clauses §.,
provided to accommadate movem

      
   

        

SLEEVED OR EXPANDA JONT

 

 

   

Storu WATER on
GRANAGE PIPE (ePu}

Sites
a 3. The use of corrugated flexibi He PVC pipe products is not perm: ted

 

LOW APE WORK TO MOE”

 

 

 
 

VERTICALLY INCEPENDERT are various oations refer to 78 Bu ding Desi
Cea eas tive only.
§ id be made for the concection af overflows or wat
FECAL Seu. WAR GEL fixtures such as H.WW.S and A.C. to aparoved drains as required by the -e‘evart ‘occl

 

authority,

PLUMBING REQUIREMENTS — CLASS M_H1H2 & E SITES

 

 

SCG Consulting Engineers Appendix Page 6 of 7 Appendices.1

 

Page 17

E.2

Site Drainage recommendations

 

ORECTON OF ee ~>~
GROUND FALL

 

\
| ORELONG
|

 

 

 

 

 

 

 

 

      

CUT-OFF DRAIN AT HGH
QDE GF ENBANKNENT CUT

  
     

RETAINING WALL, WAL

  

-| GROUND SURFACE FALL

FOOMHG & "| 1:20 NIN FOR 1.5m MAN

  

‘QUT-OFF ORAIN ALONG
HGH SIDE OF RETAINING

 

> REAR OF WALL ORANAGE,
“pLk, PROVE FLUSH OUT
PLY FsOUTY

8 SHAD

     

   

Lo TT OF RETARING WALL
DDRECTED ARQUND THE oreo
PERMETER OF THE INETER OF THE
OVELLING Lemanel
TYPICAL DRAINAGE ~ RETAINING WALLS

  

ies downslope from the 6
5s at the upstream end of the

 

SITE DRAINAGE RECOMENDATIONS ALL SITES

 

 

SCG Consulting Engineers

Appendix Page 7 of 7

Appendices.1

Page 18

 

ers ieee teed ene Say i =

aa

 

ee 2

Page 19

Foundation Maintenance
and Footing Performance.
A Homeowner's Guide

csiro

BIF 18
replaces
Information
Sheet 10/91

Buildings can and often do move. This movement can be up, down, lateral or rotational. The fundamental cause
of movement in buildings can usua ly be related to one or more problems in the foundation soil. It is important for

the homeowner to identify the soil type in order to ascertain the measures that should be pu!

 

place in order to

ensure that problems in the foundation soil can be prevented, thus protecting against building movement.

This Building Technology File is designed to identify causes of soilrelated buil
methods of prevention of resultant cracking in buildings.

The types of soils usually present under the topsoil in land zoned for
residential buildings can be split into two approximate groups ~
granular and clay. Quite often, foundation soil is a mixture of both
types. The general problems associated with soils having granular
content are usually caused by erosion. Clay sails are subject to
saturation and swell/shrink problems.

Classifications for a given area cam generally be obtained by
application to the Jocal authority, but these are sometimes unreliable
and if there is doubt, a geotechnical report should be commissioned.
As most buildings suffering movement problems are founded on clay
soils, there is an emphasis on classification of soils according to the
amount of swell and shrinkage they experience with variations of
water content. The table below is Table 2.1 from AS 2870, the
Residential Stab and Footing Code.

 

icauses of Movement

Settlement due te construction

There are two types of settlement that occur as 4 result of

construction:

¢ Immediate settlement occurs when a building is first placed on its
foundation soil, as a result of compaction of the soil under the
weight of the structure. The cohesive quality of clay soil mitigates
against this, but granular (particularly sandy) soil is susceptible.

» Consolidation settlement is a feature of clay soil and may take
place because of the expulsion of moisture from the soil or because
of the soil’s lack of resistance to local compressive oF shear stresses.
This will usually take place during the first few months after
construction, but has been known to take many years in
exceptional cases.

These problems are the province of the puilder and should be taken

into consideration as part of the preparation of the site for construc-

tion, Building Technology File 19 (BTF 19) deals with these
problems.

 

ing movement, and to suggest

Erosion

All soils are prone to erosion, but sandy soil is particularly susceptible
to being washed away. Fiven clay with a sand component of say 10%
or more can suffer from erosion.

Saturation

This is particularly a problem in clay soils. Saturation creates a bog-
like suspension of the soit that causes it to lose virtually all of its
bearing capacity. To a lesser degree, sand Is affected by saturation
because saturated sand may undergo a reduction in volume —
particularly imported sand fill for bedding and blinding layers.
However, this usually occurs as immediate settlement and should
normally be the province of the builder.

Seasonal swelling and shrinkage of soil

All clays react to the presence of water by slowly absorbing it, making
the soil increase in volume {see table pelow). The degree of increase
varies considerably between different clays, as does the degree of
decrease during the subsequent drying out caused by fair weather
periods. Because of the low absorption and expulsion rate, this
phenomenon will not usually be noticeable unless there are
prolonged rainy or dry periods, usually of weeks or months,
depending on the land and soil characteristics.

The swelling of soil creates an upward force on the footings of the
building, and shrinkage creates subsidence that takes away the
support needed by the footing to retain equilibrium.

Shear failure

This phenomenon occurs when the foundation soit does not have

sufficient strength to support the weight of the footing. There are

two major post-construction causes:

* Significant load increase.

« Reduction of lateral support of the soil under the footing due to
erosion or excavation.

« Inctay soil, shear failure can be caused by saturation of the soil
adjacent to or under the footing.

 

 

 

 
 

Sa GENERAL DEFINITIONS OF SITE CLAS ES.

Foundation - as ,

 

 

 

se “Mast sand and rock sites with Little or no ground imovément from moisture changes.
a Stightly reactive clay sites with only slight ground movement from moisture changes e

; Moderately teactive ‘clay of silt sites, which can ‘experience moderate ground movement fF

‘om moisture changes

 

“lightly reactive clay sites, which cat experience high

‘Extremely feactive sites, which can experienct extreme

grourid inoyement from. moisture Changes

ground movernent from. moisture changes

 

 

«Filled sites

 

Sites which include soft soils, such as soft clay or silt or loose sands; landslip; imine subsidence’

 

 

collapsing soils; soils sisbject

“$6 erosion; reactive sites subject to ‘abnormal moisture conditions or sites which cannot be classified otherwise

 

 

Page 20

Tree root growth
‘Trees and shrubs that are allowed to grow in the vicinity of footings
can cause foundation soil movement in two ways!

* Roots that grow under footings may increase in cross-sectional
size, exerting upward pressure on footings.

* Roots in the vicinity of footings will absord much af the moisture
in the foundation soil, causing shrinkage or subsidence.

, Unevenness of Movement

The types of ground movement described above usually occur
unevenly throughout the building's foundation soil. Settlement due
to construction tends to be uneven because of:

+ Differing compaction of foundation soil prior to construction.
+ Differing moisture content of foundation soil prior to construction

Movement due to non-construction causes is usually more uneven
still. Erosion can undermine a footing that traverses the flow or can
create the conditions for shear failure by eroding soil adjacent to a
footing that runs in the same direction as the flow.

Saturation of clay foundation soil may occur where subfloor walls
create a dam that makes water pond. It can also occur wherever there
is a source of water near footings in clay soil. This leads to a severe
reduction in the strength of the soil which may create local shear
failure.

Seasonal swelling and shrinkage of clay soil affects the perimeter of
the building first, then gradually spreads to the interior. The swelling
process will usually begin at the uphill extreme of the building. or on
the weather side where the land is flat. Swelling gradually reaches the
interior soil as absorption continues. Shrinkage usually begins where
the sun's heat is greatest.

 

Effects of Uneven Soil Movement on Structures

Erosion and saturation

Erosion removes the support from under footings, tending to create
subsidence of the part of the structure under which it occurs.
Brickwork walls will resist the stress created by this removal of
support by bridging the gap or cantilevering until the bricks or the
mortar bedding fail. Older masonry has little resistance. Evidence of
failure varies according to circumstances and symptoms may include:

* Step cracking in the mortar beds in the body of the wall or
above/below openings such as doors or windows.

+ Vertical cracking in the bricks (usually but not necessarily in line
with the vertical becls or perpends).

Isolated piers affected by erosion or saturation of foundations will
eventually lose contact with the bearers they support and may tilt or
fail over. The floors that have lost this support wiil become bouncy,
sometimes rattling ornaments etc.

Seasonal swelling/shrinkage in clay

Swelling foundation soil due to rainy periods first lifts the most
exposed extremities of the footing system, then the remainder of the
perimeter footings while gradually permeating inside the building
footprint to lift internal footings. This swelling first tends to create a
dish effect, because the external feotings are pushed higher than the
internal ones.

The first noticeable symptom may be that the floor appears slightly
dished. This is often accompanied by some doors binding on the
floor or the door head, together with some cracking of cornice
mitres. In buildings with timber flooring supported by bearers and
ts. the floor can be bouncy. Externally there may be visible
dishing of the hip or ridge lines.

  

As the moisture absorption process completes its journey to the
innermost areas of the building. the internal footings will rise. If the
spread of moisture is roughly even, it may be that the symptoms will
temporarily disappear, but it is more likely that swelling will be
uneven, creating a difference rather than a disappearance
symptoms. In buildings with timber flooring supported by bearers
and joists. the isolated piers will rise more easily than the strip
footings or piers under walls, creating noticeable doming of flooring

 

 

See ee eee

 

As the weather pattern changes and the soil begins to dry out, the
external footings will be first affected, beginning with the locations
where the sun's effect is strongest. This has the effect of lowering the
external footings. The doming is accentuated and cracking reduces
or disappears where it occurred because of dishing, but other cracks
open up. The roof lines may become convex.

Doming and dishing are also affected by weather in other ways. In
areas where warm, wet summers and cooler dry winters preva
water migration tends to be toward the interior and doming will be
accentuated, whereas where summers are dry and winters are cold
and wet, migration tends to be toward the exterior and the
underlying propensity is toward dishing.

 

Movement caused by tree roots

In general, growing roots will exert an upward pressure on footings,
whereas soil subject to drying because of tree or shrub roots will tend
to remove support from under footings by inducing shrinkage

Complications caused by the structure itself

Most forces that the soil causes to be exerted on structures are
vertical ~ i.e. either up or down. However, because these forces are
seldom spread evenly around the footings, and because the building
resists uneven movement because of its rigidity, forces are exerted
from one part of the building to another. The net result of al! these
forces is usually rotational. This resultant force often complicates the
diagnosis because the visible symptoms do not simply reflect the
original cause. A common symptom is binding of doors on the
vertical member of the frame.

 

 
 

Effects on full masonry structures

Brickwork will resist cracking where it can. It will attempt to span
areas that lose support because of subsided foundations or raised
points, It is therefore usual ta see cracking at weak points, such as
openings for windows or doors.

dn the event of constcuction settlement, cracking will usually remain
unchanged after the process of settlement has ceased.

With local shear or erosion, cracking will usually continue to develop
until the original cause has been remedied, or until the subsidence
has completely neutralised the affected portion of footing and the
structure has stabilised on other footings th:

  

In the case of swell/shrink effects. the brickwork will in some cases
return to its original position after completion of a cycle, however it
is more likely that the rotational effect not be exactly reversed,
and it is also usual that brickwork will settle in its new position and
will resist the forces trying to return it to its original position. This
means that in a case where swelling takes place after construction
and cracking occurs. the cracking is likely to at least partly remain
after the shrink segment of the cycle is complete. Thus, each time
the cycle is repeated, the likelihood is that the cracking will become
wider until the sections of brickwork become virtually independent.

 

 

 

With repeated cycles. once the cracking is established. if there is no
other complication, it is normal for the incidence of cracking to
stabilise, as the building has the acticulation it needs to cope with
the problem. This is by no means always the case, however, and
monitoring of cracks in walls and floors should always be treated
seriously.

 

Upheavat caused by growth of tree roots under footings is not a
simple vertical shear stress. There is a tendency for the root ta also
exert lateral forces that attempt to separate sections of brickwork
after initial cracking has occurred.

Page 21

 

The normal structural arrangement Is that the inner leaf of brick-
work in the external walis and at ieasi some ‘of the internal walls
(depending on the roof type) comprise the load-bearing structure on
which any upper floors, ceilings and the roof are supported. In these
cases, it fs Intecnally visible cracking that should be the main focus
of attention, however there are a few examples of dwellings whose
external leaf of masonry plays some supporting role, so this should
be checked if there is any doubt. In any case, externally visible
cracking is Important as a guide to stresses on the structure generally,
and it should also be remembered that the external walls must be
capable of supporting themselves.

Effects on framed structures

Timber or steel framed buildings are less likely to exhibit cracking
due to swell/shrink than masony buildings because of thelr
flexibility. Also, the doming/dishing effects tend to be lower because
of the lighter weight of walls. The main risks to framed buildings are
encountered because of the isolated pier footings used under walls.
Where erosion or saturation cause a footing to fall away, this can
double the span which a wall must bridge. This additional stress can
create cracking in wall linings. pacticularly where there is a weak
point in the structure caused bya door or window opening. It is,
however, unlikely that framed structures will be so stressed as to suffer
serious damage without first exhibiting some or all of the above
syraptoms for considerable period. The same warning period should
apply in the case of upheaval. It should be noted, however, that where
framed buildings are supported by strip footings there is only one leaf
of brickwork and therefore the externally visible walls are the
supporting structure for the building. In this case, the subfloor
masonry walls can be expected to behave as full brickwork walls.

Effects on brick veneer structures 7

Because the load-bearing structure of a brick veneer bullding is the
frame that makes up the interior leaf of the external walls plus
perhaps the internal walls, depending on the type of roof, the
building can be expected to behave as a framed structure, except that
the external masonry will behave in a similar way to the external leaf
of a full masonry structure.

 

: Water Servi d Drainage

  

‘Where a water service pipe, a sewer or stormwater drainage pipe is in
the vicinity of a building, a water jeak can cause erosion, swelling or
saturation of susceptible soil. Bven a minuscule leak can be enough
to saturate a clay foundation. A leaking tap near a building can have
the same effect. In addition, trenches containing pipes can become
watercourses even though backfilled, particularly where broken
rubble Is used as fill. Water that runs along these trenches can be
responsible for secious erosion, interstrata seepage into subfloor areas
and saturation.

Pipe leakage and trench water flows also encourage tree and shrub
roots to the source of water, complicating and exacerbating the

problem. .
Poor roof plumbing can result in large volumes of rainwater being

concentrated in a small area of soil:

» Incorrect falls in roof guttering may result in overflows, as may
gutters blocked with leaves ete,

« Corroded guttering or downpipes can spill water to ground.

{pes not positively connected to a proper storimwater

 

collection system will direct a concentration of water to soli that is
directly adjacent to footings, sometimes causing large-scale
problems such as erosion, saturation and migration of water under
the building.

  

In general, most cracking found in masonry walls is a cosmetic
nulsance only and can be kept in repair or even ignored. The table
below is a reproduction of Table C1 of AS 2870.

AS 2870 also publishes figures relating to cracking In concrete floors,
however because wall cracking will usually reach the critical point
significantly earlier than cracking in slabs, this table is not
reproduced here.

| prevention/Cure

 

Plumbing

Where building movement is caused by water service, roof plumbing,
sewer of stormwater Failure, the remedy Is to repair the problem.

It is prudent, however, to consider also rerouting pipes away from
the building where possible, and relocating taps to positions where
any leakage will not direct water to the building vicinity. Even where
gully traps are present, there is sometimes sufficient spill to create
erosion or saturation, particularly in modern installations using

* sthaller diameter PVC fixtures. Indeed, some gully traps are not
’ situated directly under the taps that are installed to charge them,

with the result that water from the tap may enter the backfilled
trench that houses the sewer piping. If the trench has been poorly
backfilled, the water will either pond or flow along the bottom of
the trench. As these trenches usually run alongside the footings and
can be at a similar depth, it is not hard to see how any water that js
thus directed into a trench can easily affect the foundation's ability to
support Footings or even gain entry to the subfloor area,

Ground drainage

Tn all soils there is the capacity for water to travel on the surface and
below it, Surface water flows can be established by inspection during
and after heavy or prolonged rain. Tf necessary, a grated drain system
connected to the stormwater collection system |s usually an easy
solution.

Tt fs, however, sometimes necessary when attempting to prevent
water migration that testing be carried out to establish watertable
height and subsofl water flows. This subject Is referred to In BIF 19
and may properly be regarded as an area for an expert consultant.

Protection of the building perimeter .
Tt fs essential to remember that the soll that affects footings extends
well beyond the actual building line. Watering of garden plants,
shrubs and trees causes some of the most serious water problems,

For this reason, particularly where problems exist or are likely to
occur, it Is recormmended that an apron of paving be installed
around as much of the building perimeter as necessary. This paving

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 22

           

Carport

 

cavered wilh
mulen

should extend outwards a minimum of 900 mm (more in highly
reactive soil) and should have a minimum fall away from the
building of 1:60. The finished paving should be no less than 100
mm below brick vent bases.

Tt is prudent to relocate drainage pipes away from this paving. if
passible, to avoid complications from future leakage. If this is not
practical, earthenware pipes should be replaced by PVC and
backfilling should be of the same soil type as the surrounding soil
and compacted to the same density.

 

Except in areas where freezing of water is an issue, it is wise to
remove taps in the building area and relocate them well away from
the building - preferably not uphill from it (see BTF 19).

Tt may be desirable to install a grated drain at the outside edge of the
paving on the uphill side of the building. If subsoil drainage is
needed this can be installed under the surface drain.

Condensation

In buildings with a subfloor void such as where bearers and joists
support flooring, insufficient ventilation creates ideal conditions for
condensation, particuiariy where there is jittie clearance between the
floor and the ground. Condensation adds to the moisture already
present in the subfloor and significantly slows the process of drying
owt. Installation of an adequate subfloor ventilation system, either
natural or mechanical, is desirable.

Warning: Although this Building Technology File deals with
cracking in buildings. it should be said that subfloor moisture can
result in the development of other problems, notably:

+ Water that is transmitted into masonry, metal or timber building
elements causes damage and/or decay to those elements.

* High subfoor humidity and moisture content create an ideal
environment for various pests, incliding termites and spiders.

+ Where high moisture fevels are transmitted to the flooring and
walls. an increase in the dust mite count can ensue within the
living areas. Dust mites, as well as dampness in general, can be a
health hazard to inhabitants, particularly those who are
abnormally susceptible to respiratory ailments.

‘The garden

The ideal veyetation layout is to have lawn or plants that require
only light watering immediately adjacent to the drainage or paving
edge, then more demanding plants, shrubs and trees spread out in
that order.

Overwatering due to misuse of automatic watering systems is a
common cause of saturation and water migration under footings. If
it is necessary to use these systems, it is important to remove garden
beds to a completely safe distance from buildings.

Existing trees

Where a tree is causing a probiem of soil drying or there is the
existence or threat of upheaval of footings, if the offending roots are
subsidiary and their removal will not significantly damage the tree,
they should be severed and a concrete or metal barrier placed
vertically in the soil to prevent future root growth in the direction of
the building. If it is not possible to remave the relevant roots
without damage to the tree, an application to remove the tree should
be made to the local authority. A prudent plan is to transplant likely
offenders before they become a problem.

 
 

Information on trees, plants and shrubs

State departments overseeing agriculture can give information
regarding root patterns, volume of water needed and safe distance
from buildings of most species. Botanic gardens are also sources of
information. For information on plant roots and drains. see Building
Technology File 17.

Excavation

Excavation around footings must be properly engineered. Soil
supporting footings can only be safely excavated at an angle that
allows the soil under the footing to remain stable. This angle is
called the angle of repose (or friction) and varies significantly
between soil types and conditions. Removal of soil within the angle
of repose will cause subsidence.

 

 

 

: Remediation

Where erosion has occurred that has washed away soil adjacent to
footings, soil of the same classification should be introcluced and
compacted to the same density. Where footings have been
undermined, augmentation or other specialist work may be required,
Remediation of footings and foundations is generally the realm of a
specialist consultant.

Where isolated footings rise and fall because of swell/shrink effect.
the homeowner may be tempted to alleviate floor bounce by fi
the gap that has appeared between the bearer and the pier with
blocking. The
cycle occurs, the eae blocking will push the floor up into an
accentuated dome and may also cause local shear failure in the soil.
Tf it is necessary to use blocking, it should be by a pair of fine
wedges and monitoring should be carried out fortnightly.

 

   

This BTF was prepared by John Lewer FAIB, MIAMA, Pariner,
Construction Diagnosis.

 

ae information in this and other a in the series was dade fom various sources and was believed to be correct when ruelsneg:

 

The formation is acisary

 

in goo faith and. nok cl med to be an exraustive treatme:

 

he relevant subject

 

Further professional sence needs to be obtained before taking any a action based « on ye infarnation Provided.

  

 

 
 
 

Distnbuted by
CSIRO PUBLISHING PO Box 1139, Collingwood 3066, Australia

Freecall 1800 645 051 Tel {03} 9662 7666
Em

  

© CSIRO 2003. Unauthorised copying of this Bui

Fax (03) 9662 7555 www.publish.csiro.au

[email protected]

 

ing Technolagy file is prol

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Soil Test and Footing Report.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.