Council archive · source document
Soil Test and Footing Report · MCU13/0261
Attached to the e-mail MCU13/0261 - Response to Information Request - 5 Stevens Street Sunshine Beach.
3 SITE DESCRIPTION The construction area has a gradient in the order of 7%. Vegetation on the construction area (and nearby surrounds) consists of grasses and scattered tall trees. The trees are located on and adjacent the proposed construction site. The existing surface drainage is good and sub-surface drainage is good. 4 FINDINGS The soil profiles encountered are shown on the attached borelog sections. No water table was encountered during our testing program. The sandy soils encountered are susceptible to collapse when unconfined. This may effect excavations and result in additional earthworks and increased concrete volumes. Temporary shoring or Forma-Tube may be required to retain the sands prior to concreting. The samples classified on-site were assessed as having negligible plasticity, therefore laboratory testing was considered unnecessary. We have assessed the expected differential movement of the soil profiles encountered to be the equivalent of a site with a Ys of less than 20mm. The following foundation material will provide a safe bearing capacity (100 kPa) for buildings within the scope of AS 2870-2011 and is shown shaded on the attached logs; FOUNDATION MATERIAL - NATURAL MEDIUM DENSE SILTY SANDS 5 SITE PREPARATION DETAILS We recommend scraping this site free of all organic material and debris. The proposed construction area should then be levelled suitable for the construction of a block base. The base must be fill, clean granular material (i.e. crusher dust, clean sand, deco-rock or road base) and be free of any organic material and have a clay content of less than 15% (Plasticity Index less than 25%). The fill is to be wetted and compacted in 150mm layers with a vibrating plate making 6 passes (3 in each direction). _In the area of the fill, the floor slab and any services must be fully suspended on piers. Where a retaining wall is required, a cut batter of 1 to 2 (vertical to horizontal) in the sand profile taken from the base of the proposed wall should be excavated. These earthworks must incorporate shallow surface spoon drains at the base and along the high side of the cut. Drains must have an efficient outflow down- slope and clear of the construction area. The exposed face shouid aiso be protected against the potential for stormwater erosion. Should these recommendations be un-achievable the builder should seek guidance from this office on temporary shoring, benching or other suitable techniques. Backpropping to retaining walls should be provided throughout the backfilling and compaction process. Areas where existing structures or trees are removed shall be backfilled with engineer approved fill material compacted to achieve a minimum relative field density of 95% and be in accordance with AS2870-2011. Where trees are removed prior to construction the moisture conditions of the soils must be allowed to normalise across the site prior to commencing foundation preparations. Any loose or soft material uncovered in the site preparation shall be removed and replaced with approved fill material compacted in accordance with AS2870-2011, or alternative measures to be provided by the engineer. scG Consulting Engineers 2 SCG Ref: 23360(S)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Soil Test and Footing Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.