Original source · versioned page text
Referenced Doc - Effluent - MCU24/0071
SOIL CHARACTERISTICS TRENCH/BED CONSTRUCTION:
- EXCAVATE WITH LASER LEVEL IOS AT THE END OF
TABLE 5.1 AS3500.1
MIN COVER PER
- RIP LEVEL OF BASE ≈300 to 400mm BACKFILL EACH DISTRIBUTION TYPICAL WARNING SIGN
SOIL TEXTURE SANDY CLAY LOAM OVER SANDY CLAY
- RE-EXCAVATE BACK TO CORRECT LEVEL PIPE
- COMPLYING WITH AS 1341.9 AT
BOUNDARIES OF LAA REVISIONS
STRUCTURE MODERATELY STRUCTURED USING A LASER LEVEL - CLEAR VISIBLE TO PROPERTY
- GYPSUM BASE AT 1kg/m2 USERS # DATE SUBJECT AUTHORISED
SOIL CATEGORY 5 - PLACE DISTRIBUTION PIPE ENSURING THEY - WORDING SUCH AS "RECYCLED A 27/05/2024 REVISION A C. TAYLOR
COMPACTED PIPE WATER - AVOID CONTACT -
75 od 75
ARE LEVEL SUPPORT (SIDE AND
- PLACE AGGREGATE THEN FILTER CLOTH DO NOT DRINK"
PERMEABILITY 0.06 - 0.12 m/DAY OVERLAY)
- REPLACE EXCAVATED TOP SOIL
- ALLOWANCE TO BE PROVIDED FOR RAIN COMPACED BEDDING
DESIGN LOADING RATE 10 mm/DAY 75mm x 50mm HARDWOOD
WATER SHEDDING AND FUTURE SETTLEMENT POST OR 100mm TREATED
DESIGN VOLUME - GRASS TO PROMOTE EVAPOTRANSPIRATION 75 od 75 LOG
WATER SUPPLY BORE WATER AND RAIN WATER
VOLUME ALLOWANCE 150 L/PERSON/DAY TYPICAL PIPE TRENCHING IOS/FLUSH POINT WARNING SIGN
NUMBER OF BEDROOMS 2x 1-BR CABINS
DESIGN POPULATION 4 PERSONS TAYLOR ENVIRONMENTAL
TOTAL DESIGN VOLUME 600 L/DAY Ø32OD Ø26ID PN12.5 LILAC
TREATMENT
COATED PIPE FROM OSSF
TYPE OF FACILITY AUSSIE TREAT MODEL 20 6-OUTLET DISTRIBUTION BOX,
INSTALLED LEVEL ON A PRE-CAST IOS/FLUSH POINT AT
APPROVAL 09 - 2022 SLAB/PAVER OR BEDDED IN CONCRETE ∅100 SLOTTED PIPE END OF EACH PIPE
TREATMENT LEVEL ADVANCED SECONDARY
SERVICING REQUIREMENTS QUARTERLY
DISPOSAL AREA
TRENCHES
DISPOSAL METHOD
WITH ∅100 SLOTTED PIPE
600
AREA REQUIRED A = Q/DLR = 60m²
INSTALL AS 6 TRENCHES x (0.6m x 17m) = 61m²
8600
1000
RESERVE AREA 6 TRENCHES x (0.6m x 17m) = 61m² ∅100 uPVC DWV DRAINAGE
1:60 MIN GRADE QBCC LICENCE NUMBER 150 556 72
PUMP DUTY (PUMP STATION TO OSSF) ABN NUMBER 37 147 807 420
PIPE ∅32od ∅26id PN12.5
PHONE: 0400 301 364
LENGTH 100m & 55m EMAIL: [email protected]
WEB: www.taylorenviro.com.au
HEADLOSS 4m
FRICTION LOSS 6m
TOTAL LOSS 10m
FLOW RATE 60 L/MIN
10m HEAD @ 60 L/MIN 15000
WASTEWATER TREATMENT &
PUMP DUTY
EFFLUENT DISPOSAL SYSTEM
TRANSFER TIME [200L] 3.33 MIN 17000
PUMP DUTY (OSSF TO LAA)
AUTHORISED FOR ISSUE DATE
PIPE ∅32od ∅26id PN12.5
LENGTH 5m
TYPICAL PLAN VIEW 27/05/2024
HEADLOSS 2m STREET ADDRESS
FRICTION LOSS 3m 486 TABLELANDS ROAD, COORAN 4569
TOTAL LOSS 5m STORMWATER DIVERSION LOT & PLAN
TOP SOIL LOT 2 RP165079
FLOW RATE 60 L/MIN IOS
NATURAL
SLOPE =
COUNCIL
PUMP DUTY 5m HEAD @ 60 L/MIN 7%
300 100
DISTRIBUTION AGGREGATE NOOSA COUNCIL
TRANSFER TIME [200L] 3.33 MIN (20-40mm)
300 100
∅100 SLOTTED PIPE NAME OF CLIENT
300 100
FILTER CLOTH THOMPSON
600 DESIGNER
300 100
1000 600 C. TAYLOR
300 100
1000 600 DRAWN
300 100
1000 600 M. MAHONY
RIP BASE AND SPREAD GYPSUM AT 1kg/m² 1000 600 DRAWING DETAILS
1000 600 DETAIL
JOB NUMBER
TE24855
SCALE REVISION DWG #
TYPICAL SECTIONAL VIEW
N/A A SL3
Document Set ID: 23040840
Version: 1, Version Date: 31/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.