Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Att 4. Ecological Assessment Report - 555 Louis Bazzo Drive.pdf

of 126

Page text read automatically using OCR, there may be inaccuracies

 PERFORMANCE OUTCOMES                                   ACCEPTABLE OUTCOMES                                                 PROPOSAL COMPLIANCE SUMMARY
                                                                                                                            for Koala District A as set out in the Nature Conservation
                                                                                                                            (Koala) Conservation Plan 2017.
 Bushfire Management
 PO12                                                   No acceptable outcome provided                                      PO12 - A Bushfire Hazard Assessment has been prepared
 Bushfire management measures are adopted                                                                                   that incorporates the principles of PO12.
 based on ecological principles, which:
 a) maintain and enhance biodiversity;
 b) minimise threat of fire to the natural
      environment, as well as life and property; and
 c) provide for effective use and maintenance of
      buildings and structures.
 Editor's note—The performance outcome applies
 to properties in bushfire hazard areas and only
 where clearing is reasonably necessary for the
 control of bushfire risk to a building or structure.
 Bushfire hazard areas are shown on Bushfire
 Hazard Overlay maps in Schedule 2.
 Scenic Amenity
 PO13                                                   AO13.1                                                              AO13.1 Vegetation clearing is limited to areas adjacent to
 The scenic amenity and vegetated character of the      Vegetation is retained:                                             existing cleared areas and no clearing is proposed to be
 landscape is protected by retaining vegetation:        a) on and within 30 metres of prominent ridgelines and on sloping   undertaken along the road frontage or along watercourses
 a) along and around watercourses and drainage              sites;                                                          and drainage lines.
      lines;                                            b) in gullies;
 b) on steep slopes and ridgelines;                     c) along watercourses and drainage lines;
 c) along the major road network; and                   d) within 10 metres of the major road network; and
 d) that forms coastal vistas to and from beaches.      e) along the front coastal dune system.




18 July 2025                                                        Tim Olah – Ecological Assessment Report
Ref: 23-068                                                  Proposed Dwelling House at 555 Louis Bazzo Drive, Pomona

Log in to download the original (Att 4. Ecological Assessment Report - 555 Louis Bazzo Drive.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.