Council archive · source document
631_IPS Planning Report · MCU23/0030
IPS REF: 631
iv. Refuse collection – The proposed dwelling will be afforded refuse collection from kerbside by the
Council Contractor.
v. Infrastructure servicing – The proposed dwelling is within the urban boundary and therefore will
have the ability to be connected to reticulated water supply, sewerage, stormwater drainage and
telecommunications infrastructure network. The proposed design ensures that no runoff crosses
the side boundaries or worsens conditions to any adjoining properties or allotments.
3.3 Supporting Technical Reports
In support of this development application, the following specialist reports listed in Table 5 below have
been commissioned and accompany this planning assessment report:
Table 5: Supporting documentation
Report title Prepared by Date Reference
Engineering Report Walsh Consulting Engineers February 2023 Attachment 3
Geotechnical Investigation & Tectonic Geotechnical & February 2023 Attachment 4
Acid Sulfate Soil Management Environmental Engineers
Plan
A summary of the supporting technical reports commissioned to support the proposed MCU (Dwelling
House) and associated operational works development is provided below.
i. Summary of Engineering Matters – An Engineering Services report was undertaken to ensure the
proposed development can satisfy Council’s requirements and environmental and safety
expectations specified in the relevant parts of the Noosa Plan 2020 relating to infrastructure,
services and utilities. Additionally, the services report addressed the proposed Waste
Management, Stormwater Management, Flooding and Earthworks proposed for the
development. The report concluded that the proposal can appropriately meet the Council
requirements for the development works. For further detail please refer to Engineering Services
Report included at Attachment 3.
ii. Summary of Geotechnical Matters – Geotechnical Investigation was undertaken to ground truth
the site geotechnical constraints. The investigation comprised a site walk-over survey, as well as
the drilling of boreholes at two locations across the site. Along with an Acid Sulfate Management
Plan, the report provides geotechnical recommendations regarding earthworks, footings,
retaining walls and groundwater management. Further details in relation to the geotechnical
engineering assessment can be found in the Geotechnical Report included at Attachment 4.
Page 9 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
631_IPS Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 552 KB (small file)
- File type
No other editions are linked here.