Response with Conditions - 2310-37453 SRA
Attached to the e-mail MCU23/0112 & DBW23/0095 - SARA Response with conditions.
2310-37453 SRA
Attachment 2—Advice to the Applicant
General Advice
1. Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
or the State Development Assessment Provisions (SDAP) version 3.0. If a word remains
undefined it has its ordinary meaning.
Further Permits Required
2. Road Works Approval
This referral agency response includes a requirement for road works on a state-controlled road.
Under section 33 of the Transport Infrastructure Act 1994, written approval is required to carry
out road works on a state-controlled road. This approval must be obtained prior to commencing
any works on the state-controlled road reserve.
Please note that any design submitted through the development application process is
conceptual in nature. The road works approval process will require detailed engineering
designs of the works, certified by a Registered Professional Engineer of Queensland
(RPEQ).The designs will need to demonstrate compliance with the Department of Transport
and Main Roads’ Road Planning and Design Manual, technical standards and policies.
Please contact the Department of Transport and Main Roads to make an application for road
works approval via [email protected], quoting reference TMR23-041031, as
soon as possible to ensure that gaining a road works approval does not delay construction.
Further information on applying for road works approval, including the required application form,
can be found at https://www.tmr.qld.gov.au/Community-and-environment/Planning-and-
development/Other-matters-requiring-approval#roadworks.
3. Public Utility Works and Connections
If any works and/or connections are required to public utility services within a state-controlled
road reserve, approval from the Department of Transport and Main Roads is required under the
relevant public utility legislation (electricity, water/sewer, telecommunication). Approvals must
be obtained prior to commencing any utility works within the state-controlled road reserve.
Please contact the Department of Transport and Main Roads Public Utility Team via
[email protected] for further information on the application and approval process for
public utility works and connections.
State Assessment and Referral Agency Page 4 of 6